Makespan estimation in batch process industries using aggregate resource and job set characteristics
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- James K. Weeks, 1979. "A Simulation Study of Predictable Due-Dates," Management Science, INFORMS, vol. 25(4), pages 363-373, April.
- Raaymakers, Wenny H. M. & Fransoo, Jan C., 2000. "Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries," International Journal of Production Economics, Elsevier, vol. 68(2), pages 137-149, November.
- J. W. M. Bertrand, 1983. "The Effect of Workload Dependent Due-Dates on Job Shop Performance," Management Science, INFORMS, vol. 29(7), pages 799-816, July.
- Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lixin Cheng & Qiuhua Tang & Zikai Zhang & Shiqian Wu, 2021. "Data mining for fast and accurate makespan estimation in machining workshops," Journal of Intelligent Manufacturing, Springer, vol. 32(2), pages 483-500, February.
- Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
- Vineet Jain & Tilak Raj, 2018. "An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1302-1314, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
- Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
- Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
- Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
- Raaymakers, Wenny H. M. & Fransoo, Jan C., 2000. "Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries," International Journal of Production Economics, Elsevier, vol. 68(2), pages 137-149, November.
- Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
- Nekoiemehr, Nooshin & Zhang, Guoqing & Selvarajah, Esaignani, 2019. "Due date quotation in a dual-channel supply chain," International Journal of Production Economics, Elsevier, vol. 215(C), pages 102-111.
- Mark L. Spearman & Rachel Q. Zhang, 1999. "Optimal Lead Time Policies," Management Science, INFORMS, vol. 45(2), pages 290-295, February.
- Koulamas, Christos & Kyparisis, George J., 2008. "Single-machine scheduling with waiting-time-dependent due dates," European Journal of Operational Research, Elsevier, vol. 191(2), pages 577-581, December.
- Bertrand, J. W. M. & van Ooijen, H. P. G., 2000. "Customer order lead times for production based on lead time and tardiness costs," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 257-265, March.
- Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
- He, Zesheng & Yang, Taeyong & Tiger, Andy, 1996. "An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling," European Journal of Operational Research, Elsevier, vol. 91(1), pages 99-117, May.
- Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
- Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
- Erica L. Plambeck, 2004. "Optimal Leadtime Differentiation via Diffusion Approximations," Operations Research, INFORMS, vol. 52(2), pages 213-228, April.
- ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.
- Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
- Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
- Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
- Zhenying Zhao & Michael Ball & Masahiro Kotake, 2005. "Optimization-Based Available-To-Promise with Multi-Stage Resource Availability," Annals of Operations Research, Springer, vol. 135(1), pages 65-85, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:70:y:2001:i:2:p:145-161. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.