Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
- Stefan Voß & David L. Woodruff, 2006. "Introduction to Computational Optimization Models for Production Planning in a Supply Chain," Springer Books, Springer, edition 0, number 978-3-540-29879-3, December.
- Stephen C. Graves, 1986. "A Tactical Planning Model for a Job Shop," Operations Research, INFORMS, vol. 34(4), pages 522-533, August.
- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Tatsiopoulos, I. P. & Kingsman, B. G., 1983. "Lead time management," European Journal of Operational Research, Elsevier, vol. 14(4), pages 351-358, December.
- Srinivasan, A. & Carey, M. & Morton, T.E., 1988. "Resource Pricing And Aggregate Scheduling In Manufacturing Systems," GSIA Working Papers 88-89-58, Carnegie Mellon University, Tepper School of Business.
- Zapfel, Gunther & Missbauer, Hubert, 1993. "New concepts for production planning and control," European Journal of Operational Research, Elsevier, vol. 67(3), pages 297-320, June.
- Steven T. Hackman & Robert C. Leachman, 1989. "A General Framework for Modeling Production," Management Science, INFORMS, vol. 35(4), pages 478-495, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
- Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
- Aouam, Tarik & Brahimi, Nadjib, 2013. "Integrated production planning and order acceptance under uncertainty: A robust optimization approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 504-515.
- Guhlich, Hendrik & Fleischmann, Moritz & Mönch, Lars & Stolletz, Raik, 2018. "A clearing function based bid-price approach to integrated order acceptance and release decisions," European Journal of Operational Research, Elsevier, vol. 268(1), pages 243-254.
- Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
- Haeussler, Stefan & Missbauer, Hubert, 2014. "Empirical validation of meta-models of work centres in order release planning," International Journal of Production Economics, Elsevier, vol. 149(C), pages 102-116.
- A. Mustafin & A. Kantarbayeva, 2022. "Clearing function in the context of the invariant manifold method," Papers 2206.11205, arXiv.org.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
- Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
- Kefeli, Ali & Uzsoy, Reha & Fathi, Yahya & Kay, Michael, 2011. "Using a mathematical programming model to examine the marginal price of capacitated resources," International Journal of Production Economics, Elsevier, vol. 131(1), pages 383-391, May.
- Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
- Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
- Jakob Asmundsson & Ronald L. Rardin & Can Hulusi Turkseven & Reha Uzsoy, 2009. "Production planning with resources subject to congestion," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 142-157, March.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
- de Sampaio, Raimundo J.B. & Wollmann, Rafael R.G. & Vieira, Paula F.G., 2017. "A flexible production planning for rolling-horizons," International Journal of Production Economics, Elsevier, vol. 190(C), pages 31-36.
- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
- Aouam, Tarik & Brahimi, Nadjib, 2013. "Integrated production planning and order acceptance under uncertainty: A robust optimization approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 504-515.
- Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
- Haeussler, Stefan & Stefan, Matthias & Schneckenreither, Manuel & Onay, Anita, 2021. "The lead time updating trap: Analyzing human behavior in capacitated supply chains," International Journal of Production Economics, Elsevier, vol. 234(C).
- A. Mustafin & A. Kantarbayeva, 2022. "Clearing function in the context of the invariant manifold method," Papers 2206.11205, arXiv.org.
- Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
- Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
- Peter J. H. Hulshof & Martijn R. K. Mes & Richard J. Boucherie & Erwin W. Hans, 2016. "Patient admission planning using Approximate Dynamic Programming," Flexible Services and Manufacturing Journal, Springer, vol. 28(1), pages 30-61, June.
- Craig A. Tovey, 2002. "Tutorial on Computational Complexity," Interfaces, INFORMS, vol. 32(3), pages 30-61, June.
More about this item
Keywords
Production planning Order release Workload control Queueing theory;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:131:y:2011:i:1:p:399-406. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.