IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v196y2018icp163-175.html
   My bibliography  Save this article

Reliability optimization for series systems under uncertain component failure rates in the design phase

Author

Listed:
  • Ge, Qianru
  • Peng, Hao
  • van Houtum, Geert-Jan
  • Adan, Ivo

Abstract

We develop an optimization model to determine the reliability design of critical components in a serial system. The system is under a service contract, and a penalty cost has to be paid by the OEM when the total system down time exceeds a predetermined level, which complicates the evaluation of the expected cost under a given reliability design. Furthermore, in the design phase for each critical component, all possible designs are subject to uncertain component failure rates. Considering the computational intractability of evaluating the system performance, we develop approximate evaluation methods which take the system uncertainty into account. Numerical results show that the method which includes randomness in the number of failures, failure rates and repair times leads to efficient and accurate evaluations and to close-to-optimal design decisions when used in an enumeration procedure for the optimization problem. We also show that ignoring these three types of uncertainty may result in bad design decisions.

Suggested Citation

  • Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
  • Handle: RePEc:eee:proeco:v:196:y:2018:i:c:p:163-175
    DOI: 10.1016/j.ijpe.2017.10.022
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527317303377
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.10.022?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. T Jin & P Wang, 2012. "Planning performance based contracts considering reliability and uncertain system usage," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(10), pages 1467-1478, October.
    2. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    3. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    4. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    5. van der Heijden, M. C. & Schornagel, A., 1988. "Interval uneffectiveness distribution for a k-out-of-n multistate reliability system with repair," European Journal of Operational Research, Elsevier, vol. 36(1), pages 66-77, July.
    6. Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
    7. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
    8. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    9. Ramirez-Marquez, Jose Emmanuel & Levitin, Gregory, 2008. "Algorithm for estimating reliability confidence bounds of multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 93(8), pages 1231-1243.
    10. Kostas Selviaridis & Finn Wynstra, 2015. "Performance-based contracting: a literature review and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3505-3540, June.
    11. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
    2. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    3. Alkaff, Abdullah, 2023. "Optimum warmness levels in general standby systems," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    4. Han, Zhong & Tian, Liting & Cheng, Lin, 2021. "A deducing-based reliability optimization for electrical equipment with constant failure rate components duration their mission profile," Reliability Engineering and System Safety, Elsevier, vol. 212(C).
    5. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    6. Zheng, Wei & Li, Bo & Song, Dongping & Li, Yanran, 2023. "Innovative development strategy of a risk-averse firm considering product unreliability under competition," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 172(C).
    7. Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    2. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    3. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    4. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    5. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    6. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    7. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    8. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
    9. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    10. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    11. Yujie Zhang & Yukun Wang & Xiaopeng Li & Yiliu Liu & Weizheng Gao, 2024. "Condition-based maintenance optimization for deteriorating systems considering performance-based contracting and destructive inspections," Journal of Risk and Reliability, , vol. 238(2), pages 247-259, April.
    12. Pliego Marugán, Alberto & García Márquez, Fausto Pedro & Pinar Pérez, Jesús María, 2022. "A techno-economic model for avoiding conflicts of interest between owners of offshore wind farms and maintenance suppliers," Renewable and Sustainable Energy Reviews, Elsevier, vol. 168(C).
    13. Wang, Yukun & Gao, Weizheng & Li, Xiaopeng & Liu, Yiliu, 2024. "Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
    14. Grubic, Tonci & Jennions, Ian, 2018. "Do outcome-based contracts exist? The investigation of power-by-the-hour and similar result-oriented cases," International Journal of Production Economics, Elsevier, vol. 206(C), pages 209-219.
    15. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    16. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.
    17. Wang, Xiaolin & Liu, Bin & Zhao, Xiujie, 2021. "A performance-based warranty for products subject to competing hard and soft failures," International Journal of Production Economics, Elsevier, vol. 233(C).
    18. Huber, Sebastian & Spinler, Stefan, 2012. "Pricing of full-service repair contracts," European Journal of Operational Research, Elsevier, vol. 222(1), pages 113-121.
    19. Dong Li & Nishant Mishra & Serguei Netessine, 2023. "Contracting for Product Support Under Information Asymmetry," Management Science, INFORMS, vol. 69(8), pages 4627-4645, August.
    20. Jieun Lee & Hyung-Deok Shin & Saehwa Hong, 2021. "Servitization of Global Manufacturing Business," Journal of Industry, Competition and Trade, Springer, vol. 21(4), pages 565-584, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:196:y:2018:i:c:p:163-175. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.