IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v205y2010i3p615-624.html
   My bibliography  Save this article

Optimization of component reliability in the design phase of capital goods

Author

Listed:
  • Öner, K.B.
  • Kiesmüller, G.P.
  • van Houtum, G.J.

Abstract

We introduce a quantitative model to support the decision on the reliability level of a critical component during its design. We consider an OEM who is responsible for the availability of its systems in the field through service contracts. Upon a failure of a critical part in a system during the exploitation phase, the failed part is replaced by a ready-for-use part from a spare parts inventory. In an out-of-stock situation, a costly emergency procedure is applied. The reliability levels and spare parts inventory levels of the critical components are the two main factors that determine the downtime and corresponding costs of the systems. These two levels are decision variables in our model. We formulate the portions of Life Cycle Costs (LCC) which are affected by a component's reliability and its spare parts inventory level. These costs consist of design costs, production costs, and maintenance and downtime costs in the exploitation phase. We conduct exact analysis and provide an efficient optimization algorithm. We provide managerial insights through a numerical experiment which is based on real-life data.

Suggested Citation

  • Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
  • Handle: RePEc:eee:ejores:v:205:y:2010:i:3:p:615-624
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00038-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    2. Arie Harel, 1990. "Convexity Properties of the Erlang Loss Formula," Operations Research, INFORMS, vol. 38(3), pages 499-505, June.
    3. Murthy, D. N. P. & Djamaludin, I., 2002. "New product warranty: A literature review," International Journal of Production Economics, Elsevier, vol. 79(3), pages 231-260, October.
    4. Anisur Rahman & Gopinath Chattopadhyay, 2006. "Review Of Long-Term Warranty Policies," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 23(04), pages 453-472.
    5. Murthy, D. N. P. & Solem, O. & Roren, T., 2004. "Product warranty logistics: Issues and challenges," European Journal of Operational Research, Elsevier, vol. 156(1), pages 110-126, July.
    6. Murthy, D. N. P. & Blischke, W. R., 1992. "Product warranty management -- III: A review of mathematical models," European Journal of Operational Research, Elsevier, vol. 63(1), pages 1-34, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    3. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    4. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    5. Shuai Zhang & Kai Huang & Yufei Yuan, 2021. "Spare Parts Inventory Management: A Literature Review," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    6. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    7. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    8. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    9. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    10. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    11. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
    12. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    13. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    14. Pradipta Patra & U. Dinesh Kumar, 2024. "Availability contracts under hierarchical maintenance," Annals of Operations Research, Springer, vol. 340(1), pages 389-423, September.
    15. Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre (Ed.), 2011. "Jahresbericht 2010," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 654, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    16. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable product-service supply chains for repairable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 299-321.
    17. Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
    18. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    19. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    20. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    21. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xiaolin Wang & Wei Xie, 2018. "Two-dimensional warranty: A literature review," Journal of Risk and Reliability, , vol. 232(3), pages 284-307, June.
    2. Wu, Shaomin, 2011. "Warranty claim analysis considering human factors," Reliability Engineering and System Safety, Elsevier, vol. 96(1), pages 131-138.
    3. Wu, Chin-Chun & Chou, Chao-Yu & Huang, Chikong, 2009. "Optimal price, warranty length and production rate for free replacement policy in the static demand market," Omega, Elsevier, vol. 37(1), pages 29-39, February.
    4. Wu, Shaomin, 2013. "A review on coarse warranty data and analysis," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 1-11.
    5. Wang, Xiaolin & Liu, Bin & Zhao, Xiujie, 2021. "A performance-based warranty for products subject to competing hard and soft failures," International Journal of Production Economics, Elsevier, vol. 233(C).
    6. Liu, Yiliu & Liu, Zixian & Wang, Yukun, 2013. "Customized warranty offering for configurable products," Reliability Engineering and System Safety, Elsevier, vol. 118(C), pages 1-7.
    7. Mitra, Amitava, 2021. "Warranty parameters for extended two-dimensional warranties incorporating consumer preferences," European Journal of Operational Research, Elsevier, vol. 291(2), pages 525-535.
    8. Nan Zhang & Mitra Fouladirad & Anne Barros, 2018. "Warranty analysis of a two-component system with type I stochastic dependence," Journal of Risk and Reliability, , vol. 232(3), pages 274-283, June.
    9. SamatlI-Pa, Glay & Taner, Mehmet R., 2009. "The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes," European Journal of Operational Research, Elsevier, vol. 197(2), pages 632-641, September.
    10. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    11. Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
    12. Mohamed Noomane Darghouth & Anis Chelbi & Daoud Ait-kadi, 2017. "Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4643-4661, August.
    13. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    14. Nazzal, Dima & Batarseh, Ola & Patzner, Joshua & Martin, Darren R., 2013. "Product servicing for lifespan extension and sustainable consumption: An optimization approach," International Journal of Production Economics, Elsevier, vol. 142(1), pages 105-114.
    15. Lei, Yong & Liu, Qian & Shum, Stephen, 2017. "Warranty pricing with consumer learning," European Journal of Operational Research, Elsevier, vol. 263(2), pages 596-610.
    16. Sezgin Çağlar Aksezer, 2023. "Sustainability via Extended Warranty Contracts: Design for a Consumer Electronics Retailer," Sustainability, MDPI, vol. 16(1), pages 1-11, December.
    17. Kirkizoğlu, Zeynep & Karaer, Özgen, 2022. "After-sales service and warranty decisions of a durable goods manufacturer," Omega, Elsevier, vol. 113(C).
    18. Wu, Shaomin & Li, Huiqing, 2007. "Warranty cost analysis for products with a dormant state," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1285-1293, November.
    19. Wu, Chin-Chun & Lin, Pei-Chun & Chou, Chao-Yu, 2006. "Determination of price and warranty length for a normal lifetime distributed product," International Journal of Production Economics, Elsevier, vol. 102(1), pages 95-107, July.
    20. repec:grz:wpsses:2013-03 is not listed on IDEAS
    21. Wang, Yukun & Liu, Yiliu & Li, Xiaopeng & Chen, Junyan, 2019. "Multi-phase reliability growth test planning for repairable products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 315-326.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:205:y:2010:i:3:p:615-624. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.