A techno-economic model for avoiding conflicts of interest between owners of offshore wind farms and maintenance suppliers
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
- Zhang, Chen & Gao, Wei & Yang, Tao & Guo, Sheng, 2019. "Opportunistic maintenance strategy for wind turbines considering weather conditions and spare parts inventory management," Renewable Energy, Elsevier, vol. 133(C), pages 703-711.
- Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
- Parlane, Sarah & Ryan, Lisa, 2020.
"Optimal contracts for renewable electricity,"
Energy Economics, Elsevier, vol. 91(C).
- Sarah Parlane & L. (Lisa B.) Ryan, 2019. "Optimal Contracts for Renewable Electricity," Working Papers 201920, School of Economics, University College Dublin.
- Christiansen, Marielle & Fagerholt, Kjetil & Nygreen, Bjørn & Ronen, David, 2013. "Ship routing and scheduling in the new millennium," European Journal of Operational Research, Elsevier, vol. 228(3), pages 467-483.
- Irawan, Chandra Ade & Ouelhadj, Djamila & Jones, Dylan & Stålhane, Magnus & Sperstad, Iver Bakken, 2017. "Optimisation of maintenance routing and scheduling for offshore wind farms," European Journal of Operational Research, Elsevier, vol. 256(1), pages 76-89.
- Benjamin Loevinsohn, 2008. "Performance-Based Contracting for Health Services in Developing Countries : A Toolkit," World Bank Publications - Books, The World Bank Group, number 6481.
- Lehna, Malte & Scheller, Fabian & Herwartz, Helmut, 2022. "Forecasting day-ahead electricity prices: A comparison of time series and neural network models taking external regressors into account," Energy Economics, Elsevier, vol. 106(C).
- Dahl, Christian M. & Effraimidis, Georgios & Pedersen, Mikkel H., 2019. "Nonparametric wind power forecasting under fixed and random censoring," Energy Economics, Elsevier, vol. 84(C).
- Tautz-Weinert, Jannis & Yürüşen, Nurseda Y. & Melero, Julio J. & Watson, Simon J., 2019. "Sensitivity study of a wind farm maintenance decision - A performance and revenue analysis," Renewable Energy, Elsevier, vol. 132(C), pages 93-105.
- Zhang, Zijun & Kusiak, Andrew & Song, Zhe, 2013. "Scheduling electric power production at a wind farm," European Journal of Operational Research, Elsevier, vol. 224(1), pages 227-238.
- Wang, Jingjing & Zhao, Xian & Guo, Xiaoxin, 2019. "Optimizing wind turbine's maintenance policies under performance-based contract," Renewable Energy, Elsevier, vol. 135(C), pages 626-634.
- Taylor, James W. & Jeon, Jooyoung, 2018. "Probabilistic forecasting of wave height for offshore wind turbine maintenance," European Journal of Operational Research, Elsevier, vol. 267(3), pages 877-890.
- Eurek, Kelly & Sullivan, Patrick & Gleason, Michael & Hettinger, Dylan & Heimiller, Donna & Lopez, Anthony, 2017. "An improved global wind resource estimate for integrated assessment models," Energy Economics, Elsevier, vol. 64(C), pages 552-567.
- Yürüşen, Nurseda Y. & Rowley, Paul N. & Watson, Simon J. & Melero, Julio J., 2020. "Automated wind turbine maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
- Kostas Selviaridis & Finn Wynstra, 2015. "Performance-based contracting: a literature review and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 53(12), pages 3505-3540, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Pliego Marugán, Alberto & García Márquez, Fausto Pedro & Pinar Pérez, Jesús María, 2022. "A techno-economic model for avoiding conflicts of interest between owners of offshore wind farms and maintenance suppliers," Renewable and Sustainable Energy Reviews, Elsevier, vol. 168(C).
- Canek Jackson & Rodrigo Pascual & Fredy Kristjanpoller, 2024. "Performance-based contracting in the airline industry from the standpoint of risk-averse maintenance providers," Journal of Risk and Reliability, , vol. 238(5), pages 972-982, October.
- Si, Guojin & Xia, Tangbin & Gebraeel, Nagi & Wang, Dong & Pan, Ershun & Xi, Lifeng, 2025. "Holistic opportunistic maintenance scheduling and routing for offshore wind farms," Renewable and Sustainable Energy Reviews, Elsevier, vol. 207(C).
- Yürüşen, Nurseda Y. & Rowley, Paul N. & Watson, Simon J. & Melero, Julio J., 2020. "Automated wind turbine maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
- Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
- Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
- Yujie Zhang & Yukun Wang & Xiaopeng Li & Yiliu Liu & Weizheng Gao, 2024. "Condition-based maintenance optimization for deteriorating systems considering performance-based contracting and destructive inspections," Journal of Risk and Reliability, , vol. 238(2), pages 247-259, April.
- Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
- Zhang, Chen & Hu, Di & Yang, Tao, 2022. "Anomaly detection and diagnosis for wind turbines using long short-term memory-based stacked denoising autoencoders and XGBoost," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
- Ren, Zhengru & Verma, Amrit Shankar & Li, Ye & Teuwen, Julie J.E. & Jiang, Zhiyu, 2021. "Offshore wind turbine operations and maintenance: A state-of-the-art review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 144(C).
- Shuo-Yan Chou & Xuan Loc Pham & Thi Anh Tuyet Nguyen & Tiffany Hui-Kuang Yu, 2023. "Optimal maintenance planning with special emphasis on deterioration process and vessel routing for offshore wind systems," Energy & Environment, , vol. 34(4), pages 739-763, June.
- Nullmeier, Fabian & Wynstra, Finn & van der Valk, Wendy, 2019. "Mitigating shirking: Contracting performance in buyer-initiated service triads," Other publications TiSEM cebcb590-5a85-4906-b8ec-1, Tilburg University, School of Economics and Management.
- Pinciroli, Luca & Baraldi, Piero & Zio, Enrico, 2023. "Maintenance optimization in industry 4.0," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- He, Rui & Tian, Zhigang & Wang, Yifei & Zuo, Mingjian & Guo, Ziwei, 2023. "Condition-based maintenance optimization for multi-component systems considering prognostic information and degraded working efficiency," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Ravi Pandit & Davide Astolfi & Anh Minh Tang & David Infield, 2022. "Sequential Data-Driven Long-Term Weather Forecasting Models’ Performance Comparison for Improving Offshore Operation and Maintenance Operations," Energies, MDPI, vol. 15(19), pages 1-20, October.
- Xiaodong Li & Xiang Song & Djamila Ouelhadj, 2023. "A Cost Optimisation Model for Maintenance Planning in Offshore Wind Farms with Wind Speed Dependent Failure Rates," Mathematics, MDPI, vol. 11(13), pages 1-21, June.
- Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
- Gilbert, Ciaran & Browell, Jethro & McMillan, David, 2021. "Probabilistic access forecasting for improved offshore operations," International Journal of Forecasting, Elsevier, vol. 37(1), pages 134-150.
- Wang, Yukun & Gao, Weizheng & Li, Xiaopeng & Liu, Yiliu, 2024. "Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Qi, Faqun & Zhang, Anming & Fu, Xinyi & Zha, Wenfei & Sun, Yuanhang, 2025. "Maintenance strategy for urban micro wind farm considering maintenance route and resource allocation," Applied Energy, Elsevier, vol. 377(PB).
More about this item
NEP fields
This paper has been announced in the following NEP Reports:- NEP-ENE-2024-02-19 (Energy Economics)
- NEP-ENV-2024-02-19 (Environmental Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arx:papers:2401.08251. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: arXiv administrators (email available below). General contact details of provider: http://arxiv.org/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.