IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v63y2012i10p1467-1478.html
   My bibliography  Save this article

Planning performance based contracts considering reliability and uncertain system usage

Author

Listed:
  • T Jin

    (Texas State University, TX, USA)

  • P Wang

    (Hamilton Sundstrand Power Systems, CA, USA)

Abstract

This paper investigates a novel quantitative approach for planning and contracting performance-based logistics in the presence of uncertain system usage. Our efforts focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides after-sales support. We propose an analytical model to characterize system operational availability by comprehending five performance drivers: inherent failure rate, usage rate, spare parts inventory, repair time, and the fleet size. This analytical insight into the system performance allows the service supplier to minimize the total cost across system design, production, maintenance, and repair. Two contracting schemes are investigated under cost minimization and profit maximization schemes. For the first time in literature, reliability design and service parts logistics are seamlessly integrated into one decision support model for improving operational availability while lowering the lifecycle cost. Numerical examples are provided to demonstrate the applicability and the effectiveness of the proposed decision support tool.

Suggested Citation

  • T Jin & P Wang, 2012. "Planning performance based contracts considering reliability and uncertain system usage," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(10), pages 1467-1478, October.
  • Handle: RePEc:pal:jorsoc:v:63:y:2012:i:10:p:1467-1478
    as

    Download full text from publisher

    File URL: http://www.palgrave-journals.com/jors/journal/v63/n10/pdf/jors2011144a.pdf
    File Function: Link to full text PDF
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: http://www.palgrave-journals.com/jors/journal/v63/n10/full/jors2011144a.html
    File Function: Link to full text HTML
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    3. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    4. Yoo, Seung Ho & Cheong, Taesu, 2018. "Quality improvement incentive strategies in a supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 331-342.
    5. Pradipta Patra & U. Dinesh Kumar, 2024. "Availability contracts under hierarchical maintenance," Annals of Operations Research, Springer, vol. 340(1), pages 389-423, September.
    6. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    7. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    8. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    9. Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
    10. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    11. Wang, Jingjing & Zhao, Xian & Guo, Xiaoxin, 2019. "Optimizing wind turbine's maintenance policies under performance-based contract," Renewable Energy, Elsevier, vol. 135(C), pages 626-634.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:63:y:2012:i:10:p:1467-1478. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.