IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v120y2009i2p411-417.html
   My bibliography  Save this article

A continuous model for supply planning of assembly systems with stochastic component procurement times

Author

Listed:
  • Chauhan, Satyaveer S.
  • Dolgui, Alexandre
  • Proth, Jean-Marie

Abstract

This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set.

Suggested Citation

  • Chauhan, Satyaveer S. & Dolgui, Alexandre & Proth, Jean-Marie, 2009. "A continuous model for supply planning of assembly systems with stochastic component procurement times," International Journal of Production Economics, Elsevier, vol. 120(2), pages 411-417, August.
  • Handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:411-417
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00016-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
    2. Tang, Ou & Grubbstrom, Robert W. & Zanoni, Simone, 2007. "Planned lead time determination in a make-to-order remanufacturing system," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 426-435, July.
    3. Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
    4. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
    5. Ould-Louly, Mohamed-Aly & Dolgui, Alexandre, 2004. "The MPS parameterization under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 90(3), pages 369-376, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dmitry Ivanov & Richard Hartl & Alexandre Dolgui & Alexander Pavlov & Boris Sokolov, 2015. "Integration of aggregate distribution and dynamic transportation planning in a supply chain with capacity disruptions and the ripple effect consideration," International Journal of Production Research, Taylor & Francis Journals, vol. 53(23), pages 6963-6979, December.
    2. Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
    3. Chaharsooghi, S. Kamal & Heydari, Jafar, 2010. "LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?," International Journal of Production Economics, Elsevier, vol. 124(2), pages 475-481, April.
    4. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    5. Borodin, Valeria & Dolgui, Alexandre & Hnaien, Faicel & Labadie, Nacima, 2016. "Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 79-86.
    6. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    7. Ivanov, Dmitry & Pavlov, Alexander & Dolgui, Alexandre & Pavlov, Dmitry & Sokolov, Boris, 2016. "Disruption-driven supply chain (re)-planning and performance impact assessment with consideration of pro-active and recovery policies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 90(C), pages 7-24.
    8. Dmitry Ivanov & Alexandre Dolgui & Boris Sokolov & Frank Werner, 2016. "Schedule robustness analysis with the help of attainable sets in continuous flow problem under capacity disruptions," International Journal of Production Research, Taylor & Francis Journals, vol. 54(11), pages 3397-3413, June.
    9. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    2. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    3. Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
    4. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    5. Milne, R. John & Mahapatra, Santosh & Wang, Chi-Tai, 2015. "Optimizing planned lead times for enhancing performance of MRP systems," International Journal of Production Economics, Elsevier, vol. 167(C), pages 220-231.
    6. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    7. Jian, Ming & Fang, Xin & Jin, Liu-qian & Rajapov, Azamat, 2015. "The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 84(C), pages 61-72.
    8. Sadok Turki & Stanislav Didukh & Christophe Sauvey & Nidhal Rezg, 2017. "Optimization and Analysis of a Manufacturing–Remanufacturing–Transport–Warehousing System within a Closed-Loop Supply Chain," Sustainability, MDPI, vol. 9(4), pages 1-20, April.
    9. Manuel Díaz-Madroñero & Josefa Mula & Mariano Jiménez & David Peidro, 2017. "A rolling horizon approach for material requirement planning under fuzzy lead times," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2197-2211, April.
    10. Carole Camisullis & Vincent Giard, 2010. "Détermination des stocks de sécurité dans une chaîne logistique-amont dédiée à une production de masse de produits fortement diversifiés," Working Papers hal-00876986, HAL.
    11. Tobias Schulz & Ivan Ferretti, 2008. "On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield," FEMM Working Papers 08034, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
    12. Hnaien, Faicel & Afsar, Hasan Murat, 2017. "Robust single-item lot-sizing problems with discrete-scenario lead time," International Journal of Production Economics, Elsevier, vol. 185(C), pages 223-229.
    13. Liao, Haolan & Wu, Di & Wang, Yuhan & Lyu, Zeyu & Sun, Hongmei & Nie, Yongyou & He, He, 2022. "Impacts of carbon trading mechanism on closed-loop supply chain: A case study of stringer pallet remanufacturing," Socio-Economic Planning Sciences, Elsevier, vol. 81(C).
    14. Ould-Louly, Mohamed-Aly & Dolgui, Alexandre, 2004. "The MPS parameterization under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 90(3), pages 369-376, August.
    15. Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
    16. Ivanov, Dmitry & Pavlov, Alexander & Dolgui, Alexandre & Pavlov, Dmitry & Sokolov, Boris, 2016. "Disruption-driven supply chain (re)-planning and performance impact assessment with consideration of pro-active and recovery policies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 90(C), pages 7-24.
    17. repec:dau:papers:123456789/3718 is not listed on IDEAS
    18. Bandaly, Dia & Satir, Ahmet & Shanker, Latha, 2016. "Impact of lead time variability in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 180(C), pages 88-100.
    19. Hong, Xianpei & Cao, Xinlu & Gong, Yeming & Chen, Wanying, 2021. "Quality information acquisition and disclosure with green manufacturing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 232(C).
    20. Bao, Xing & Tang, Ou & Ji, Jianhua, 2008. "Applying the minimum relative entropy method for bimodal distribution in a remanufacturing system," International Journal of Production Economics, Elsevier, vol. 113(2), pages 969-979, June.
    21. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:411-417. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.