Optimizing planned lead times for enhancing performance of MRP systems

Author

Listed:
  • Milne, R. John
  • Mahapatra, Santosh
  • Wang, Chi-Tai

Abstract

Material Requirements Planning (MRP) systems are frequently used in discrete parts manufacturing to determine planned order releases. This paper proposes a mixed integer program (MIP) model to determine the optimal values of planned lead times to be used by an MRP system. The MIP contains a set of integrated constraints that determine planned orders similar to how an MRP system would while executing these planned orders under capacity and component availability constraints. The model includes an optional fixed-periods lot sizing policy and minimizes the costs of excess finished and in-process inventories, setups, backorders, exceeding capacity (e.g. outsourcing), and changes in planned lead times. Experimental results—using data from a DRAM manufacturer—indicate that the proposed method of determining planned lead times is superior to a commonly used ad hoc method for determining the planned lead times used by an MRP system.

Suggested Citation

  • Milne, R. John & Mahapatra, Santosh & Wang, Chi-Tai, 2015. "Optimizing planned lead times for enhancing performance of MRP systems," International Journal of Production Economics, Elsevier, vol. 167(C), pages 220-231.
  • Handle: RePEc:eee:proeco:v:167:y:2015:i:c:p:220-231
    DOI: 10.1016/j.ijpe.2015.05.013
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527315001656
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.05.013?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    2. Chee-Chong Teo & Rohit Bhatnagar & Stephen Graves, 2011. "Setting planned lead times for a make-to-order production system with master schedule smoothing," IISE Transactions, Taylor & Francis Journals, vol. 43(6), pages 399-414.
    3. Ould-Louly, Mohamed-Aly & Dolgui, Alexandre, 2004. "The MPS parameterization under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 90(3), pages 369-376, August.
    4. J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
    5. Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
    6. Stephen C. Graves, 2011. "Uncertainty and Production Planning," International Series in Operations Research & Management Science, in: Karl G. Kempf & Pınar Keskinocak & Reha Uzsoy (ed.), Planning Production and Inventories in the Extended Enterprise, chapter 0, pages 83-101, Springer.
    7. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Haeussler, Stefan & Stefan, Matthias & Schneckenreither, Manuel & Onay, Anita, 2021. "The lead time updating trap: Analyzing human behavior in capacitated supply chains," International Journal of Production Economics, Elsevier, vol. 234(C).
    2. Alireza Pooya & Morteza Pakdaman, 2019. "Optimal control model for finite capacity continuous MRP with deteriorating items," Journal of Intelligent Manufacturing, Springer, vol. 30(5), pages 2203-2215, June.
    3. F. J. Arcelus & T. P. M. Pakkala & G. Srinivasan, 2018. "Inventory Replenishment for Profit Maximization over a Finite Horizon under One-time Cost Changes," Global Business Review, International Management Institute, vol. 19(3_suppl), pages 235-248, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Manuel Díaz-Madroñero & Josefa Mula & Mariano Jiménez & David Peidro, 2017. "A rolling horizon approach for material requirement planning under fuzzy lead times," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2197-2211, April.
    2. Jian, Ming & Fang, Xin & Jin, Liu-qian & Rajapov, Azamat, 2015. "The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 84(C), pages 61-72.
    3. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    4. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    5. Hnaien, Faicel & Afsar, Hasan Murat, 2017. "Robust single-item lot-sizing problems with discrete-scenario lead time," International Journal of Production Economics, Elsevier, vol. 185(C), pages 223-229.
    6. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    7. Chauhan, Satyaveer S. & Dolgui, Alexandre & Proth, Jean-Marie, 2009. "A continuous model for supply planning of assembly systems with stochastic component procurement times," International Journal of Production Economics, Elsevier, vol. 120(2), pages 411-417, August.
    8. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
    9. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    10. Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
    11. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    12. Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
    13. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    14. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
    15. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    16. Boulaksil, Youssef, 2016. "Safety stock placement in supply chains with demand forecast updates," Operations Research Perspectives, Elsevier, vol. 3(C), pages 27-31.
    17. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    18. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    19. J. F. Chen & W. E. Wilhelm, 1994. "Optimizing the allocation of components to kits in small‐lot, multiechelon assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(2), pages 229-256, March.
    20. J. Drechsel & A. Kimms, 2010. "The subcoalition-perfect core of cooperative games," Annals of Operations Research, Springer, vol. 181(1), pages 591-601, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:167:y:2015:i:c:p:220-231. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.