IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v218y2019icp106-117.html
   My bibliography  Save this article

Optimization of multi-period supply planning under stochastic lead times and a dynamic demand

Author

Listed:
  • Ben-Ammar, Oussama
  • Bettayeb, Belgacem
  • Dolgui, Alexandre

Abstract

Supply planning and inventory control are vital in Supply Chain (SC) optimization processes for companies that aim to produce highest-quality finished product at lowest cost and right on time. Optimization means planners’ need to reduce average stock levels and determine the optimal safety lead-times. This study deals with a multi-period production planning problem with a known dynamic demand. Order lead-times are independent, discrete random variables with known and bounded probability distributions. A general probabilistic model, including a recursive procedure to calculate the expected total cost (ETC), is derived. A genetic algorithm (GA) is developed for this model to determine planned lead-times and safety stock level while minimizing the ETC, where ETC is the sum of expected backlogging cost (ETBC) and expected inventory holding cost (ETHC). This approach is then compared to three other classical models to test its efficiency. The results prove that, under certain assumptions, it could be better to optimize planned lead-times rather than implement safety stocks. To understand the effect of lead-time dispersion on solution robustness, different levels of variance and different shapes of lead-time distributions are studied. Analysis proves that the lead-time variability has little effect on ETC when unit inventory holding cost is close to unit backlogging cost.

Suggested Citation

  • Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
  • Handle: RePEc:eee:proeco:v:218:y:2019:i:c:p:106-117
    DOI: 10.1016/j.ijpe.2019.05.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527319301720
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2019.05.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bookbinder, James H. & Cakanyildirim, Metin, 1999. "Random lead times and expedited orders in (Q,r) inventory systems," European Journal of Operational Research, Elsevier, vol. 115(2), pages 300-313, June.
    2. Minner, Stefan, 2003. "Multiple-supplier inventory models in supply chain management: A review," International Journal of Production Economics, Elsevier, vol. 81(1), pages 265-279, January.
    3. Heckmann, Iris & Comes, Tina & Nickel, Stefan, 2015. "A critical review on supply chain risk – Definition, measure and modeling," Omega, Elsevier, vol. 52(C), pages 119-132.
    4. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    5. Robert S. Kaplan, 1970. "A Dynamic Inventory Model with Stochastic Lead Times," Management Science, INFORMS, vol. 16(7), pages 491-507, March.
    6. Heng Kuang & S. Jack Hu & Jeonghan Ko, 2016. "A dynamic programming approach to integrated assembly planning and supplier assignment with lead time constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2691-2708, May.
    7. Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
    8. Richard Ehrhardt, 1984. "( s , S ) Policies for a Dynamic Inventory Model with Stochastic Lead Times," Operations Research, INFORMS, vol. 32(1), pages 121-132, February.
    9. Steven Nahmias, 1979. "Simple Approximations for a Variety of Dynamic Leadtime Lost-Sales Inventory Models," Operations Research, INFORMS, vol. 27(5), pages 904-924, October.
    10. Stephen C. Graves & Sean P. Willems, 2000. "Optimizing Strategic Safety Stock Placement in Supply Chains," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 68-83, June.
    11. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
    12. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
    13. Alp Muharremoglu & Nan Yang, 2010. "Inventory Management with an Exogenous Supply Process," Operations Research, INFORMS, vol. 58(1), pages 111-129, February.
    14. Bandaly, Dia & Satir, Ahmet & Shanker, Latha, 2016. "Impact of lead time variability in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 180(C), pages 88-100.
    15. Tang, Ou & Nurmaya Musa, S., 2011. "Identifying risk issues and research advancements in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 133(1), pages 25-34, September.
    16. Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
    17. Jula, Payman & Leachman, Robert C., 2011. "Long- and Short-Run supply-chain optimization models for the allocation and congestion management of containerized imports from Asia to the United States," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(5), pages 593-608, September.
    18. Barbara B. Flynn & Xenophon Koufteros & Guanyi Lu, 2016. "On Theory in Supply Chain Uncertainty and its Implications for Supply Chain Integration," Journal of Supply Chain Management, Institute for Supply Management, vol. 52(3), pages 3-27, July.
    19. Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj, 1998. "Modelling and simulation of a supply chain in an uncertain environment," European Journal of Operational Research, Elsevier, vol. 109(2), pages 299-309, September.
    20. May, Benjamin Isaac & Atkinson, Michael P. & Ferrer, Geraldo, 2017. "Applying inventory classification to a large inventory management system," Journal of Operations and Supply Chain Management (JOSCM), Fundação Getulio Vargas, Escola de Administração de Empresas de São Paulo (FGV EAESP), vol. 10(1), June.
    21. Jing-Sheng Song & Paul H. Zipkin, 1996. "Inventory Control with Information About Supply Conditions," Management Science, INFORMS, vol. 42(10), pages 1409-1419, October.
    22. Roberto Rossi & S. Armagan Tarim & Ramesh Bollapragada, 2012. "Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time," INFORMS Journal on Computing, INFORMS, vol. 24(1), pages 66-80, February.
    23. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
    24. Hayya, Jack C. & Bagchi, Uttarayan & Kim, Jeon G. & Sun, Daewon, 2008. "On static stochastic order crossover," International Journal of Production Economics, Elsevier, vol. 114(1), pages 404-413, July.
    25. Chengbin Chu & Jean‐Marie Proth & Xiaolan Xie, 1993. "Supply management in assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 933-949, December.
    26. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
    27. Leachman, Robert C. & Jula, Payman, 2012. "Estimating flow times for containerized imports from Asia to the United States through the Western rail network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(1), pages 296-309.
    28. Arıkan, Emel & Fichtinger, Johannes & Ries, Jörg M., 2014. "Impact of transportation lead-time variability on the economic and environmental performance of inventory systems," International Journal of Production Economics, Elsevier, vol. 157(C), pages 279-288.
    29. Lawrence V. Snyder & Zümbül Atan & Peng Peng & Ying Rong & Amanda J. Schmitt & Burcu Sinsoysal, 2016. "OR/MS models for supply chain disruptions: a review," IISE Transactions, Taylor & Francis Journals, vol. 48(2), pages 89-109, February.
    30. James R. Bradley & Lawrence W. Robinson, 2005. "Improved Base-Stock Approximations for Independent Stochastic Lead Times with Order Crossover," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 319-329, November.
    31. Begen, Mehmet A. & Pun, Hubert & Yan, Xinghao, 2016. "Supply and demand uncertainty reduction efforts and cost comparison," International Journal of Production Economics, Elsevier, vol. 180(C), pages 125-134.
    32. Arikan, E. & Fichtinger, J. & Ries, J. M., 2014. "Impact of transportation lead-time variability on the economic and environmental performance of inventory systems," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 63386, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    33. SteadieSeifi, M. & Dellaert, N.P. & Nuijten, W. & Van Woensel, T. & Raoufi, R., 2014. "Multimodal freight transportation planning: A literature review," European Journal of Operational Research, Elsevier, vol. 233(1), pages 1-15.
    34. Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
    35. Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
    36. He, Xin James & Kim, Jeon G. & Hayya, Jack C., 2005. "The cost of lead-time variability: The case of the exponential distribution," International Journal of Production Economics, Elsevier, vol. 97(2), pages 130-142, August.
    37. Georghios P. Sphicas, 1982. "Technical Note—On the Solution of an Inventory Model with Variable Lead Times," Operations Research, INFORMS, vol. 30(2), pages 404-410, April.
    38. Matthew J. Liberatore, 1979. "Technical Note—The EOQ Model under Stochastic Lead Time," Operations Research, INFORMS, vol. 27(2), pages 391-396, April.
    39. Lawrence W. Robinson & James R. Bradley, 2008. "Note--Further Improvements on Base-Stock Approximations for Independent Stochastic Lead Times with Order Crossover," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 325-327, December.
    40. Paul Zipkin, 1986. "Stochastic leadtimes in continuous‐time inventory models," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 33(4), pages 763-774, November.
    41. Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Thevenin, Simon & Ben-Ammar, Oussama & Brahimi, Nadjib, 2022. "Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1199-1215.
    2. Boxi Zuo & Chengqi Peng & Wenying Liu, 2023. "Research on Inventory Simulation of Pulse Supply Chain Based on Controllable Lead Time," International Journal of Science and Business, IJSAB International, vol. 27(1), pages 216-225.
    3. Zamani Dadaneh, Dariush & Moradi, Sajad & Alizadeh, Behrooz, 2023. "Simultaneous planning of purchase orders, production, and inventory management under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 265(C).
    4. Chenglin Hu & Junsong Bian & Daozhi Zhao & Longfei He & Fangqi Dong, 2024. "Optimal Dynamic Production Planning for Supply Network with Random External and Internal Demands," Mathematics, MDPI, vol. 12(17), pages 1-33, August.
    5. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    6. Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
    7. Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
    8. Sayan Chakraborty & Akshat Jain & S. P. Sarmah, 2022. "An integrated mathematical model based on grey optimal ranking for supplier selection considering pandemic situation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1613-1648, December.
    9. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Thomas Wensing & Heinrich Kuhn, 2015. "Analysis of production and inventory systems when orders may cross over," Annals of Operations Research, Springer, vol. 231(1), pages 265-281, August.
    2. Chatfield, Dean C. & Pritchard, Alan M., 2018. "Crossover aware base stock decisions for service-driven systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 312-330.
    3. Achin Srivastav & Sunil Agrawal, 2020. "On a single item single stage mixture inventory models with independent stochastic lead times," Operational Research, Springer, vol. 20(4), pages 2189-2227, December.
    4. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
    5. Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
    6. Hansen, Ole & Transchel, Sandra & Friedrich, Hanno, 2023. "Replenishment strategies for lost sales inventory systems of perishables under demand and lead time uncertainty," European Journal of Operational Research, Elsevier, vol. 308(2), pages 661-675.
    7. Hekimoğlu, Mustafa & van der Laan, Ervin & Dekker, Rommert, 2018. "Markov-modulated analysis of a spare parts system with random lead times and disruption risks," European Journal of Operational Research, Elsevier, vol. 269(3), pages 909-922.
    8. Alp Muharremoglu & Nan Yang, 2010. "Inventory Management with an Exogenous Supply Process," Operations Research, INFORMS, vol. 58(1), pages 111-129, February.
    9. Hellemans, Tim & Boute, Robert N. & Van Houdt, Benny, 2019. "Analysis of lead time correlation under a base-stock policy," European Journal of Operational Research, Elsevier, vol. 276(2), pages 519-535.
    10. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    11. Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
    12. Hayya, Jack C. & Bagchi, Uttarayan & Kim, Jeon G. & Sun, Daewon, 2008. "On static stochastic order crossover," International Journal of Production Economics, Elsevier, vol. 114(1), pages 404-413, July.
    13. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    14. Kumar Muthuraman & Sridhar Seshadri & Qi Wu, 2015. "Inventory Management with Stochastic Lead Times," Mathematics of Operations Research, INFORMS, vol. 40(2), pages 302-327, February.
    15. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    16. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    17. Achin Srivastav & Sunil Agrawal, 2020. "Multi-objective optimization of mixture inventory system experiencing order crossover," Annals of Operations Research, Springer, vol. 290(1), pages 943-960, July.
    18. Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
    19. Wang, Xun & Disney, Stephen M., 2017. "Mitigating variance amplification under stochastic lead-time: The proportional control approach," European Journal of Operational Research, Elsevier, vol. 256(1), pages 151-162.
    20. Bryan, Nana & Srinivasan, Mandyam M., 2014. "Real-time order tracking for supply systems with multiple transportation stages," European Journal of Operational Research, Elsevier, vol. 236(2), pages 548-560.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:218:y:2019:i:c:p:106-117. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.