IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v180y2016icp88-100.html
   My bibliography  Save this article

Impact of lead time variability in supply chain risk management

Author

Listed:
  • Bandaly, Dia
  • Satir, Ahmet
  • Shanker, Latha

Abstract

In this article, we study the impact of lead time variability on the performance of supply chain risk management in the beer industry. The stakeholders considered are the empty aluminum can supplier, the brewery and the distributor. The stochastic lead time model developed is an extension of the previously developed base model (with deterministic lead time) under which commodity price risk and demand uncertainty are managed via an integrated risk management approach using operational methods and financial derivatives. Simulation-based optimization is used to model and analyze such a complex system. We find that lead time variability does not always deteriorate the supply chain performance. Only high levels of lead time variability are found to justify more the need for a coordinated supply chain. The findings also reveal the need for using different hedging strategies to manage products flows across the supply chain under stochastic lead time versus the deterministic case. Managerial insights for the supply chain studied are argued based on experimental design findings.

Suggested Citation

  • Bandaly, Dia & Satir, Ahmet & Shanker, Latha, 2016. "Impact of lead time variability in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 180(C), pages 88-100.
  • Handle: RePEc:eee:proeco:v:180:y:2016:i:c:p:88-100
    DOI: 10.1016/j.ijpe.2016.07.014
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527316301608
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2016.07.014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sadeghi, Ahmad, 2015. "Providing a measure for bullwhip effect in a two-product supply chain with exponential smoothing forecasts," International Journal of Production Economics, Elsevier, vol. 169(C), pages 44-54.
    2. Fang, Xin & Zhang, Cheng & Robb, David J. & Blackburn, Joseph D., 2013. "Decision support for lead time and demand variability reduction," Omega, Elsevier, vol. 41(2), pages 390-396.
    3. Hoque, M.A., 2013. "A vendor–buyer integrated production–inventory model with normal distribution of lead time," International Journal of Production Economics, Elsevier, vol. 144(2), pages 409-417.
    4. Isaksson, Olov H.D. & Seifert, Ralf W., 2016. "Quantifying the bullwhip effect using two-echelon data: A cross-industry empirical investigation," International Journal of Production Economics, Elsevier, vol. 171(P3), pages 311-320.
    5. Salal Humair & John D. Ruark & Brian Tomlin & Sean P. Willems, 2013. "Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization," Interfaces, INFORMS, vol. 43(5), pages 421-434, October.
    6. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    7. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
    8. Suzanne Treville & Norman Schürhoff & Lenos Trigeorgis & Benjamin Avanzi, 2014. "Optimal Sourcing and Lead-Time Reduction under Evolutionary Demand Risk," Production and Operations Management, Production and Operations Management Society, vol. 23(12), pages 2103-2117, December.
    9. Chaharsooghi, S. Kamal & Heydari, Jafar, 2010. "LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?," International Journal of Production Economics, Elsevier, vol. 124(2), pages 475-481, April.
    10. Warren Liao, T. & Chang, P.C., 2010. "Impacts of forecast, inventory policy, and lead time on supply chain inventory--A numerical study," International Journal of Production Economics, Elsevier, vol. 128(2), pages 527-537, December.
    11. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    12. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
    13. Agrawal, Sunil & Sengupta, Raghu Nandan & Shanker, Kripa, 2009. "Impact of information sharing and lead time on bullwhip effect and on-hand inventory," European Journal of Operational Research, Elsevier, vol. 192(2), pages 576-593, January.
    14. Tang, Christopher S., 2006. "Perspectives in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 103(2), pages 451-488, October.
    15. So, Kut C. & Zheng, Xiaona, 2003. "Impact of supplier's lead time and forecast demand updating on retailer's order quantity variability in a two-level supply chain," International Journal of Production Economics, Elsevier, vol. 86(2), pages 169-179, November.
    16. Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
    17. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
    18. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    19. Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2016. "Closed-loop supply chains: What reverse logistics factors influence performance?," International Journal of Production Economics, Elsevier, vol. 175(C), pages 35-49.
    20. Frank Chen & Zvi Drezner & Jennifer K. Ryan & David Simchi-Levi, 2000. "Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information," Management Science, INFORMS, vol. 46(3), pages 436-443, March.
    21. Heydari, Jafar & Mahmoodi, Mansour & Taleizadeh, Ata Allah, 2016. "Lead time aggregation: A three-echelon supply chain model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 89(C), pages 215-233.
    22. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    2. Fattahi, Mohammad & Govindan, Kannan & Keyvanshokooh, Esmaeil, 2017. "Responsive and resilient supply chain network design under operational and disruption risks with delivery lead-time sensitive customers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 176-200.
    3. M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
    4. Santos, Rachel Barbosa & de Oliveira, Ualison Rébula & Rocha, Henrique Martins, 2018. "Failure mapping for occupational safety management in the film and television industry," International Journal of Production Economics, Elsevier, vol. 203(C), pages 1-12.
    5. Polo, Andrés & Peña, Numar & Muñoz, Dairo & Cañón, Adrián & Escobar, John Willmer, 2019. "Robust design of a closed-loop supply chain under uncertainty conditions integrating financial criteria," Omega, Elsevier, vol. 88(C), pages 110-132.
    6. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
    7. Sanjoy Kumar Paul & Ruhul Sarker & Daryl Essam & Paul Tae-Woo Lee, 2019. "A mathematical modelling approach for managing sudden disturbances in a three-tier manufacturing supply chain," Annals of Operations Research, Springer, vol. 280(1), pages 299-335, September.
    8. Chowdhury, Nighat Afroz & Ali, Syed Mithun & Mahtab, Zuhayer & Rahman, Towfique & Kabir, Golam & Paul, Sanjoy Kumar, 2019. "A structural model for investigating the driving and dependence power of supply chain risks in the readymade garment industry," Journal of Retailing and Consumer Services, Elsevier, vol. 51(C), pages 102-113.
    9. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
    10. Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Hurtado, Margarita, 2018. "Exploiting the characteristics of serial queues to reduce the mean and variance of flow time using combined priority rules," International Journal of Production Economics, Elsevier, vol. 196(C), pages 211-225.
    11. Wu, Desheng & Olson, David L. & Wang, Shouyang, 2019. "Finance-operations interface mechanism and models," Omega, Elsevier, vol. 88(C), pages 1-3.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
    2. Dominguez, Roberto & Cannella, Salvatore & Ponte, Borja & Framinan, Jose M., 2020. "On the dynamics of closed-loop supply chains under remanufacturing lead time variability," Omega, Elsevier, vol. 97(C).
    3. de Lima, Daruichi Pereira & Fioriolli, José Carlos & Padula, Antonio Domingos & Pumi, Guilherme, 2018. "The impact of Chinese imports of soybean on port infrastructure in Brazil: A study based on the concept of the “Bullwhip Effect”," Journal of Commodity Markets, Elsevier, vol. 9(C), pages 55-76.
    4. Jian, Ming & Fang, Xin & Jin, Liu-qian & Rajapov, Azamat, 2015. "The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 84(C), pages 61-72.
    5. Ponte, Borja & Framinan, Jose M. & Cannella, Salvatore & Dominguez, Roberto, 2020. "Quantifying the Bullwhip Effect in closed-loop supply chains: The interplay of information transparencies, return rates, and lead times," International Journal of Production Economics, Elsevier, vol. 230(C).
    6. Dass, Mayukh & Reshadi, Mehrnoosh & Li, Yuewu, 2023. "An exploration of ripple effects of advertising among major suppliers in a supply chain network," Journal of Business Research, Elsevier, vol. 169(C).
    7. Chatfield, Dean C. & Pritchard, Alan M., 2013. "Returns and the bullwhip effect," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 49(1), pages 159-175.
    8. Framinan, Jose M., 2024. "An analysis of the supply chain dynamics of remanufacturing with multiple collectors," International Journal of Production Economics, Elsevier, vol. 267(C).
    9. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    10. Kefeng Xu & Yang Dong & Yu Xia, 2014. "‘Too Little’ or ‘Too Late’: The Timing of Supply Chain Demand Collaboration," Working Papers 0203mss, College of Business, University of Texas at San Antonio.
    11. Ponte, Borja & Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2022. "The implications of batching in the bullwhip effect and customer service of closed-loop supply chains," International Journal of Production Economics, Elsevier, vol. 244(C).
    12. Zhu, Tianyuan & Balakrishnan, Jaydeep & da Silveira, Giovani J.C., 2020. "Bullwhip effect in the oil and gas supply chain: A multiple-case study," International Journal of Production Economics, Elsevier, vol. 224(C).
    13. Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2021. "Remanufacturing configuration in complex supply chains," Omega, Elsevier, vol. 101(C).
    14. Ponte, Borja & Cannella, Salvatore & Dominguez, Roberto & Naim, Mohamed M. & Syntetos, Aris A., 2021. "Quality grading of returns and the dynamics of remanufacturing," International Journal of Production Economics, Elsevier, vol. 236(C).
    15. Petropoulos, Fotios & Wang, Xun & Disney, Stephen M., 2019. "The inventory performance of forecasting methods: Evidence from the M3 competition data," International Journal of Forecasting, Elsevier, vol. 35(1), pages 251-265.
    16. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    17. Ciancimino, Elena & Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2012. "On the Bullwhip Avoidance Phase: The Synchronised Supply Chain," European Journal of Operational Research, Elsevier, vol. 221(1), pages 49-63.
    18. Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "OVAP: A strategy to implement partial information sharing among supply chain retailers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 110(C), pages 122-136.
    19. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    20. Cannella, Salvatore & Dominguez, Roberto & Ponte, Borja & Framinan, Jose M., 2018. "Capacity restrictions and supply chain performance: Modelling and analysing load-dependent lead times," International Journal of Production Economics, Elsevier, vol. 204(C), pages 264-277.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:180:y:2016:i:c:p:88-100. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.