Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems
Author
Abstract
Suggested Citation
DOI: 10.1287/msom.2015.0565
Download full text from publisher
References listed on IDEAS
- Hicks, Christian & Pongcharoen, Pupong, 2006. "Dispatching rules for production scheduling in the capital goods industry," International Journal of Production Economics, Elsevier, vol. 104(1), pages 154-163, November.
- Chee-Chong Teo & Rohit Bhatnagar & Stephen Graves, 2011. "Setting planned lead times for a make-to-order production system with master schedule smoothing," IISE Transactions, Taylor & Francis Journals, vol. 43(6), pages 399-414.
- Andrew J. Clark & Herbert Scarf, 2004.
"Optimal Policies for a Multi-Echelon Inventory Problem,"
Management Science, INFORMS, vol. 50(12_supple), pages 1782-1790, December.
- Andrew J. Clark & Herbert Scarf, 1960. "Optimal Policies for a Multi-Echelon Inventory Problem," Management Science, INFORMS, vol. 6(4), pages 475-490, July.
- Diks, E. B. & de Kok, A. G., 1999. "Computational results for the control of a divergent N-echelon inventory system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 327-336, March.
- Chauhan, Satyaveer S. & Dolgui, Alexandre & Proth, Jean-Marie, 2009. "A continuous model for supply planning of assembly systems with stochastic component procurement times," International Journal of Production Economics, Elsevier, vol. 120(2), pages 411-417, August.
- Diks, E. B. & de Kok, A. G., 1998. "Optimal control of a divergent multi-echelon inventory system," European Journal of Operational Research, Elsevier, vol. 111(1), pages 75-97, November.
- Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
- J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
- Kaj Rosling, 1989. "Optimal Inventory Policies for Assembly Systems Under Random Demands," Operations Research, INFORMS, vol. 37(4), pages 565-579, August.
- Matsuura, Haruki & Tsubone, Hitoshi & Kanezashi, Masakazu, 1996. "Setting planned lead times for multi-operation jobs," European Journal of Operational Research, Elsevier, vol. 88(2), pages 287-303, January.
- Hicks, C., 2004. "A genetic algorithm tool for designing manufacturing facilities in the capital goods industry," International Journal of Production Economics, Elsevier, vol. 90(2), pages 199-211, July.
- Linguo Gong & Ton de Kok & Jie Ding, 1994. "Optimal Leadtimes Planning in a Serial Production System," Management Science, INFORMS, vol. 40(5), pages 629-632, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Batur, Demet & Bekki, Jennifer M. & Chen, Xi, 2018. "Quantile regression metamodeling: Toward improved responsiveness in the high-tech electronics manufacturing industry," European Journal of Operational Research, Elsevier, vol. 264(1), pages 212-224.
- Julian Senoner & Bernhard Kratzwald & Milan Kuzmanovic & Torbjørn H. Netland & Stefan Feuerriegel, 2023. "Addressing distributional shifts in operations management: The case of order fulfillment in customized production," Production and Operations Management, Production and Operations Management Society, vol. 32(10), pages 3022-3042, October.
- Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
- Jérémie Gallien & Alan Scheller-Wolf, 2016. "Introduction to the Special Issue on Practice-Focused Research," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 1-4, February.
- Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
- Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
- Marlin W. Ulmer & Barrett W. Thomas, 2019. "Enough Waiting for the Cable Guy—Estimating Arrival Times for Service Vehicle Routing," Transportation Science, INFORMS, vol. 53(3), pages 897-916, May.
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
- Diks, E. B. & de Kok, A. G., 1998. "Optimal control of a divergent multi-echelon inventory system," European Journal of Operational Research, Elsevier, vol. 111(1), pages 75-97, November.
- Basten, R.J.I. & van Houtum, G.J., 2013. "Near-optimal heuristics to set base stock levels in a two-echelon distribution network," International Journal of Production Economics, Elsevier, vol. 143(2), pages 546-552.
- Kaynov, Illya & van Knippenberg, Marijn & Menkovski, Vlado & van Breemen, Albert & van Jaarsveld, Willem, 2024. "Deep Reinforcement Learning for One-Warehouse Multi-Retailer inventory management," International Journal of Production Economics, Elsevier, vol. 267(C).
- Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
- Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
- Song, Dong-Ping, 2006. "Raw material release time control for complex make-to-order products with stochastic processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 371-385, September.
- Tan Wang & L. Jeff Hong, 2023. "Large-Scale Inventory Optimization: A Recurrent Neural Networks–Inspired Simulation Approach," INFORMS Journal on Computing, INFORMS, vol. 35(1), pages 196-215, January.
- Carole Camisullis & Vincent Giard, 2010. "Détermination des stocks de sécurité dans une chaîne logistique-amont dédiée à une production de masse de produits fortement diversifiés," Working Papers hal-00876986, HAL.
- Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
- van der Heijden, Matthieu, 2000. "Near cost-optimal inventory control policies for divergent networks under fill rate constraints," International Journal of Production Economics, Elsevier, vol. 63(2), pages 161-179, January.
- Diwakar Gupta & N. Selvaraju, 2006. "Performance Evaluation and Stock Allocation in Capacitated Serial Supply Systems," Manufacturing & Service Operations Management, INFORMS, vol. 8(2), pages 169-191, July.
- Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
- Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
- Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
- Alexandar Angelus & Evan L. Porteus, 2008. "An Asset Assembly Problem," Operations Research, INFORMS, vol. 56(3), pages 665-680, June.
- Van Foreest, Nicky D. & Teunter, Ruud H. & Syntetos, Aris A., 2018. "Base-stock policies with reservations," Omega, Elsevier, vol. 81(C), pages 48-56.
- Inderfurth, Karl & Minner, Stefan, 1998. "Safety stocks in multi-stage inventory systems under different service measures," European Journal of Operational Research, Elsevier, vol. 106(1), pages 57-73, April.
More about this item
Keywords
planned leadtimes; customer-order-driven; assembly systems;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormsom:v:18:y:2016:i:1:p:122-140. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.