IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v257y2023ics0925527322003504.html
   My bibliography  Save this article

Non-hierarchical work-in-progress control in manufacturing

Author

Listed:
  • Kasper, T.A. Arno
  • Land, Martin J.
  • Teunter, Ruud H.

Abstract

Reducing Work-In-Process (WIP) in manufacturing systems is associated with advantages such as predictable throughput times and increased manageability. To achieve this, an abundance of WIP control methods have been developed, such as CONWIP11acronym for Constant Work-In-Progress. and Kanban for repetitive manufacturing, and LUMS COR22acronym for Lancaster University Management School Corrected Order Release. and POLCA33acronym for Paired-cell Overlapping Loops of Cards with Authorization. for high-variety manufacturing. These methods take three types of control decisions, viz., release (entry to the manufacturing system), authorization (entry to a work centre) and dispatching (order selection at a work centre). All existing WIP control methods are hierarchical by first deciding on release and authorization before making dispatching decisions, thereby letting the decision whether to produce precede over which order to produce. This hierarchy is traditionally motivated by uncertainty in information between organizational levels, but this is questionable given the advent of Industry 4.0 technologies. We develop a non-hierarchical method – termed DRACO44acronym for Dispatching, Release and Authorization to dynamically Control Order flow. – that simultaneously considers release, authorization and dispatching when deciding. The simulation results show that DRACO significantly outperforms LUMS COR and POLCA on mean WIP and delivery performance measures. Additional analysis also indicates that overall manageability is improved by the non-hierarchical method DRACO.

Suggested Citation

  • Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
  • Handle: RePEc:eee:proeco:v:257:y:2023:i:c:s0925527322003504
    DOI: 10.1016/j.ijpe.2022.108768
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527322003504
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2022.108768?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nuno O. Fernandes & Matthias Thürer & Tatiana M. Pinho & Pedro Torres & Sílvio Carmo-Silva, 2020. "Workload control and optimised order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 58(10), pages 3180-3193, May.
    2. Nico Vandaele & Inneke Van Nieuwenhuyse & Diederik Claerhout & Rony Cremmery, 2008. "Load-Based POLCA: An Integrated Material Control System for Multiproduct, Multimachine Job Shops," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 181-197, September.
    3. Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
    4. Stefan Haeussler & Pia Netzer, 2020. "Comparison between rule- and optimization-based workload control concepts: a simulation optimization approach," International Journal of Production Research, Taylor & Francis Journals, vol. 58(12), pages 3724-3743, June.
    5. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    6. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    7. S. S. Panwalkar & Wafik Iskander, 1977. "A Survey of Scheduling Rules," Operations Research, INFORMS, vol. 25(1), pages 45-61, February.
    8. Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
    9. Bertrand, J. W. M. & Muntslag, D. R., 1993. "Production control in engineer-to-order firms," International Journal of Production Economics, Elsevier, vol. 30(1), pages 3-22, July.
    10. Dalenogare, Lucas Santos & Benitez, Guilherme Brittes & Ayala, Néstor Fabián & Frank, Alejandro Germán, 2018. "The expected contribution of Industry 4.0 technologies for industrial performance," International Journal of Production Economics, Elsevier, vol. 204(C), pages 383-394.
    11. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    12. Missbauer, Hubert, 2020. "Order release planning by iterative simulation and linear programming: Theoretical foundation and analysis of its shortcomings," European Journal of Operational Research, Elsevier, vol. 280(2), pages 495-507.
    13. Thürer, Matthias & Stevenson, Mark, 2021. "Improving superfluous load avoidance release (SLAR): A new load-based SLAR mechanism," International Journal of Production Economics, Elsevier, vol. 231(C).
    14. Frank, Alejandro Germán & Dalenogare, Lucas Santos & Ayala, Néstor Fabián, 2019. "Industry 4.0 technologies: Implementation patterns in manufacturing companies," International Journal of Production Economics, Elsevier, vol. 210(C), pages 15-26.
    15. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    16. Kenneth L. Schultz & David C. Juran & John W. Boudreau, 1999. "The Effects of Low Inventory on the Development of Productivity Norms," Management Science, INFORMS, vol. 45(12), pages 1664-1678, December.
    17. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    18. Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
    19. Fredendall, Lawrence D. & Ojha, Divesh & Wayne Patterson, J., 2010. "Concerning the theory of workload control," European Journal of Operational Research, Elsevier, vol. 201(1), pages 99-111, February.
    20. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    21. Matthias Thürer & Martin J. Land & Mark Stevenson & Lawrence D. Fredendall & Moacir Godinho Filho, 2015. "Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision," Production and Operations Management, Production and Operations Management Society, vol. 24(7), pages 1179-1192, July.
    22. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    23. Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
    24. Matthias Thürer & Mark Stevenson & Cristovao Silva & Martin J. Land & Lawrence D. Fredendall & Steven A. Melnyk, 2014. "Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release," Production and Operations Management, Production and Operations Management Society, vol. 23(3), pages 463-476, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    2. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    3. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
    4. Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
    5. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    6. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    7. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    8. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    9. Thürer, Matthias & Stevenson, Mark, 2021. "Improving superfluous load avoidance release (SLAR): A new load-based SLAR mechanism," International Journal of Production Economics, Elsevier, vol. 231(C).
    10. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    11. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    12. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
    13. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    14. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
    15. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
    16. Thürer, Matthias & Stevenson, Mark & Protzman, Charles W., 2015. "COBACABANA (Control of Balance by Card Based Navigation): An alternative to kanban in the pure flow shop?," International Journal of Production Economics, Elsevier, vol. 166(C), pages 143-151.
    17. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    18. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Ting Qu, 2017. "On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4695-4711, August.
    19. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    20. Matthias Thürer & Mark Stevenson, 2016. "Card-based delivery date promising in pure flow shops with order release control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6798-6811, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:257:y:2023:i:c:s0925527322003504. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.