Job Shop Scheduling with Due Dates and Overtime Capability

Author

Listed:
  • C. A. Holloway

    (Stanford University)

  • R. T. Nelson

    (University of California, Los Angeles)

Abstract

A scheduling procedure is proposed for the static job shop problem with job due dates and overtime capability. An example is used to demonstrate the procedure and the generation of trade-off curves relating overtime and total tardiness for use in managerial evaluation of alternative schedules. Results are reported for a set of trial problems having 30 to 98 processing operations. An extension of the procedure is described for dynamic job shop scheduling.

Suggested Citation

  • C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Overtime Capability," Management Science, INFORMS, vol. 21(1), pages 68-78, September.
  • Handle: RePEc:inm:ormnsc:v:21:y:1974:i:1:p:68-78
    DOI: 10.1287/mnsc.21.1.68
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.21.1.68
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.21.1.68?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    2. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    3. Chung, Daeyoung & Lee, Kichang & Shin, Kitae & Park, Jinwoo, 2005. "A new approach to job shop scheduling problems with due date constraints considering operation subcontracts," International Journal of Production Economics, Elsevier, vol. 98(2), pages 238-250, November.
    4. van Ooijen, Henny & Bertrand, J. Will M. & Buyukkaramikli, Nasuh C., 2019. "Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods," International Journal of Production Economics, Elsevier, vol. 208(C), pages 29-42.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:21:y:1974:i:1:p:68-78. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.