IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v188y2017icp116-127.html
   My bibliography  Save this article

Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation

Author

Listed:
  • Thürer, Matthias
  • Stevenson, Mark
  • Silva, Cristovao
  • Qu, Ting

Abstract

Two key concepts in the production planning and control literature that incorporate an order release function are the Theory of Constraints, with its drum-buffer-rope release method, and Workload Control, with its load-based release methods. When order release is applied, jobs are not directly released to the shop floor – release is controlled to realize certain performance measures. The performance impacts of drum-buffer-rope and Workload Control order release have been assessed separately, but the two approaches have not been directly compared in one study. This is a major shortcoming that leaves practitioners without guidance on which release method to select. This study assesses the performance of drum-buffer-rope and Workload Control release in a pure job shop and a general flow shop with varying levels of bottleneck severity. Both bottleneck oriented and non-bottleneck oriented Workload Control release methods are included. Simulation results show that Workload Control release methods lead to better performance than drum-buffer-rope if bottleneck severity is low. But Workload Control, including its bottleneck oriented release methods, is outperformed by drum-buffer-rope if a strong bottleneck exists. Workload Control gains an advantage in balanced shops due to its unique load balancing function, which attempts to evenly distribute workloads across resources. But this becomes functionless when there is a strong bottleneck. Our sensitivity analysis suggests that the performance differences between release methods are not affected by routing characteristics or the proportion of jobs that visit the bottleneck.

Suggested Citation

  • Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
  • Handle: RePEc:eee:proeco:v:188:y:2017:i:c:p:116-127
    DOI: 10.1016/j.ijpe.2017.03.025
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527317301196
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.03.025?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
    2. Craighead, Christopher W. & Patterson, J. Wayne & Fredendall, Lawrence D., 2001. "Protective capacity positioning: Impact on manufacturing cell performance," European Journal of Operational Research, Elsevier, vol. 134(2), pages 425-438, October.
    3. Radovilsky, Zinovy D., 1998. "A quantitative approach to estimate the size of the time buffer in the theory of constraints," International Journal of Production Economics, Elsevier, vol. 55(2), pages 113-119, July.
    4. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    5. Chakravorty, Satya S., 2001. "An evaluation of the DBR control mechanism in a job shop environment," Omega, Elsevier, vol. 29(4), pages 335-342, August.
    6. Chakravorty, Satya S. & Atwater, J. Brian, 2005. "The impact of free goods on the performance of drum-buffer-rope scheduling systems," International Journal of Production Economics, Elsevier, vol. 95(3), pages 347-357, March.
    7. Duclos, Leslie K. & Spencer, Michael S., 1995. "The impact of a constraint buffer in a flow shop," International Journal of Production Economics, Elsevier, vol. 42(2), pages 175-185, December.
    8. Fernandes, Nuno O. & Carmo-Silva, S., 2011. "Workload control under continuous order release," International Journal of Production Economics, Elsevier, vol. 131(1), pages 257-262, May.
    9. Matthias Thürer & Mark Stevenson & Cristovao Silva & Martin J. Land & Lawrence D. Fredendall & Steven A. Melnyk, 2014. "Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release," Production and Operations Management, Production and Operations Management Society, vol. 23(3), pages 463-476, March.
    10. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    11. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    12. Fredendall, Lawrence D. & Ojha, Divesh & Wayne Patterson, J., 2010. "Concerning the theory of workload control," European Journal of Operational Research, Elsevier, vol. 201(1), pages 99-111, February.
    13. Ashcroft, S. H., 1989. "Applying the principles of optimized production technology in a small manufacturing company," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 79-88, August.
    14. Kenneth R. Baker, 1984. "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, INFORMS, vol. 30(9), pages 1093-1104, September.
    15. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Unai Apaolaza & Aitor Orue & Aitor Lizarralde & Aitor Oyarbide-Zubillaga, 2022. "Competitive Improvement through Integrated Management of Sales and Operations," Sustainability, MDPI, vol. 14(5), pages 1-18, February.
    2. Habib Zare & Mahyar Kamali Saraji & Madjid Tavana & Dalia Streimikiene & Fausto Cavallaro, 2021. "An Integrated Fuzzy Goal Programming—Theory of Constraints Model for Production Planning and Optimization," Sustainability, MDPI, vol. 13(22), pages 1-15, November.
    3. Yarong Chen & Hongming Zhou & Peiyu Huang & FuhDer Chou & Shenquan Huang, 2022. "A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance," Annals of Operations Research, Springer, vol. 311(1), pages 65-79, April.
    4. Telles, Eduardo Santos & Lacerda, Daniel Pacheco & Morandi, Maria Isabel Wolf Motta & Piran, Fabio Antonio Sartori, 2020. "Drum-buffer-rope in an engineering-to-order system: An analysis of an aerospace manufacturer using data envelopment analysis (DEA)," International Journal of Production Economics, Elsevier, vol. 222(C).
    5. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    6. Thürer, Matthias & Stevenson, Mark, 2018. "Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 197(C), pages 275-282.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Thürer, Matthias & Stevenson, Mark, 2018. "Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 197(C), pages 275-282.
    2. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    3. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    4. Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
    5. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
    6. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    7. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    8. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    9. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
    10. Yarong Chen & Hongming Zhou & Peiyu Huang & FuhDer Chou & Shenquan Huang, 2022. "A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance," Annals of Operations Research, Springer, vol. 311(1), pages 65-79, April.
    11. Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
    12. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    13. Golmohammadi, Davood, 2015. "A study of scheduling under the theory of constraints," International Journal of Production Economics, Elsevier, vol. 165(C), pages 38-50.
    14. Matthias Thürer & Mark Stevenson & Ting Qu, 2016. "Job sequencing and selection within workload control order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1061-1075, February.
    15. Federica Costa & Kaustav Kundu & Matteo Rossini & Alberto Portioli-Staudacher, 2023. "Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation," Operations Management Research, Springer, vol. 16(1), pages 33-48, March.
    16. Matthias Thürer & Mark Stevenson, 2016. "Card-based delivery date promising in pure flow shops with order release control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6798-6811, November.
    17. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    18. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
    19. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
    20. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:188:y:2017:i:c:p:116-127. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.