Applying work flow control in make-to-order job shops
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2012.02.017
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Fernandes, Nuno Octavio & do Carmo-Silva, Silvio, 2006. "Generic POLCA--A production and materials flow control mechanism for quick response manufacturing," International Journal of Production Economics, Elsevier, vol. 104(1), pages 74-84, November.
- Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
- Maico Roris Severino & Moacir Godinho Filho, 2019. "POLCA system for supply chain management: simulation in the automotive industry," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1271-1289, March.
- Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Cristovao Silva & Silvio Carmo-Silva, 2019. "POLC-A: an assessment of POLCA’s authorization element," Journal of Intelligent Manufacturing, Springer, vol. 30(6), pages 2435-2447, August.
- Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
- Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
- Guodong Huang & Jie Chen & Yacob Khojasteh, 2021. "A cyber-physical system deployment based on pull strategies for one-of-a-kind production with limited resources," Journal of Intelligent Manufacturing, Springer, vol. 32(2), pages 579-596, February.
- Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Maico Roris Severino & Moacir Godinho Filho, 2019. "POLCA system for supply chain management: simulation in the automotive industry," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1271-1289, March.
- Scherrer-Rathje, Maike & Boyle, Todd A. & Deflorin, Patricia, 2009. "Lean, take two! Reflections from the second attempt at lean implementation," Business Horizons, Elsevier, vol. 52(1), pages 79-88.
- Miriam Pekarcikova & Peter Trebuna & Marek Kliment & Michal Dic, 2021. "Solution of Bottlenecks in the Logistics Flow by Applying the Kanban Module in the Tecnomatix Plant Simulation Software," Sustainability, MDPI, vol. 13(14), pages 1-21, July.
- Kroes, James R. & Manikas, Andrew S. & Gattiker, Thomas F., 2018. "Operational leanness and retail firm performance since 1980," International Journal of Production Economics, Elsevier, vol. 197(C), pages 262-274.
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Cristovao Silva & Silvio Carmo-Silva, 2019. "POLC-A: an assessment of POLCA’s authorization element," Journal of Intelligent Manufacturing, Springer, vol. 30(6), pages 2435-2447, August.
- Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
- Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
- Land, Martin J., 2009. "Cobacabana (control of balance by card-based navigation): A card-based system for job shop control," International Journal of Production Economics, Elsevier, vol. 117(1), pages 97-103, January.
- Alireza Farnoush & Magnus Wiktorsson, 2013. "POLCA and CONWIP performance in a divergent production line: an automotive case study," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 159-186, July.
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Ting Qu, 2017. "On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4695-4711, August.
- Wayne Fu & Basak Kalkanci & Ravi Subramanian, 2019. "Are Hazardous Substance Rankings Effective? An Empirical Investigation of Information Dissemination About the Relative Hazards of Chemicals and Emissions Reductions," Manufacturing & Service Operations Management, INFORMS, vol. 21(3), pages 602-619, July.
- Roh, James & Hong, Paul & Min, Hokey, 2014. "Implementation of a responsive supply chain strategy in global complexity: The case of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 198-210.
- Fernando José Gómez Paredes & Moacir Godinho Filho & Matthias Thürer & Nuno O. Fernandes & Charbel José Chiappeta Jabbour, 2022. "Factors for choosing production control systems in make-to-order shops: a systematic literature review," Journal of Intelligent Manufacturing, Springer, vol. 33(3), pages 639-674, March.
- Wolfgang Seiringer & Balwin Bokor & Klaus Altendorfer, 2024. "Evaluating Production Planning and Control Systems in Different Environments: A Comparative Simulation Study," Papers 2405.02015, arXiv.org, revised Nov 2024.
- Arnaldo Camuffo & Fabrizio Gerli, 2012. "What do lean managers do? Modeling management behaviors in lean production environments," Working Papers 13, Venice School of Management - Department of Management, Università Ca' Foscari Venezia.
- Jos A. C. Bokhorst & Jannes Slomp, 2010. "Lean Production Control at a High-Variety, Low-Volume Parts Manufacturer," Interfaces, INFORMS, vol. 40(4), pages 303-312, August.
- Ngai-Hang Z Leung & Ana Chen & Prashant Yadav & Jérémie Gallien, 2016. "The Impact of Inventory Management on Stock-Outs of Essential Drugs in Sub-Saharan Africa: Secondary Analysis of a Field Experiment in Zambia," PLOS ONE, Public Library of Science, vol. 11(5), pages 1-18, May.
- Roberto Vona & Nadia Di Paola, 2014. "Lean thinking in sanit?: il caso della logistica degli approvvigionamenti e della distribuzione ospedaliera dei farmaci," MECOSAN, FrancoAngeli Editore, vol. 2014(91), pages 105-122.
- Muhammad Shafiq & Adeel Akhtar & Muhammad Ismail & Muhammad Awais, 2021. "Lean Management Readiness Assessment Framework For Humanitarian Organizations Supply Chain Management," Bulletin of Business and Economics (BBE), Research Foundation for Humanity (RFH), vol. 10(3), pages 151-171.
- Huay Ling Tay & Prakash J. Singh & Vikram Bhakoo & Shahid Al-Balushi, 2017. "Contextual factors: assessing their influence on flow or resource efficiency orientations in healthcare lean projects," Operations Management Research, Springer, vol. 10(3), pages 118-136, December.
More about this item
Keywords
WIP control; Job shops; Simulation; Experimental approach; Priority rules; Forbidden early shipment;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:620-626. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.