Applying work flow control in make-to-order job shops

Author

Listed:
  • Harrod, Steven
  • Kanet, John J.

Abstract

This paper considers work flow control within a make-to-order job shop, which in this presentation differs from either a just-in-time (JIT) or make-to-inventory system because finished goods due dates are externally determined and early delivery of finished goods is prohibited. In particular, this paper considers the cross-effects of both choice of work flow control method and queue discipline at each work center. An experimental approach, using discrete event simulation, evaluates a five work center job shop with independent, randomly selected process sequences and process times over an experimental matrix of four work flow controls (uncontrolled, Kanban, CONWIP, and POLCA) and three queuing disciplines (first come first serve, shortest operation processing time, and earliest operation due date).

Suggested Citation

  • Harrod, Steven & Kanet, John J., 2013. "Applying work flow control in make-to-order job shops," International Journal of Production Economics, Elsevier, vol. 143(2), pages 620-626.
  • Handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:620-626
    DOI: 10.1016/j.ijpe.2012.02.017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312000758
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.02.017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fernandes, Nuno Octavio & do Carmo-Silva, Silvio, 2006. "Generic POLCA--A production and materials flow control mechanism for quick response manufacturing," International Journal of Production Economics, Elsevier, vol. 104(1), pages 74-84, November.
    2. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    2. Maico Roris Severino & Moacir Godinho Filho, 2019. "POLCA system for supply chain management: simulation in the automotive industry," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1271-1289, March.
    3. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    4. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Cristovao Silva & Silvio Carmo-Silva, 2019. "POLC-A: an assessment of POLCA’s authorization element," Journal of Intelligent Manufacturing, Springer, vol. 30(6), pages 2435-2447, August.
    5. Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
    6. Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
    7. Guodong Huang & Jie Chen & Yacob Khojasteh, 2021. "A cyber-physical system deployment based on pull strategies for one-of-a-kind production with limited resources," Journal of Intelligent Manufacturing, Springer, vol. 32(2), pages 579-596, February.
    8. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Maico Roris Severino & Moacir Godinho Filho, 2019. "POLCA system for supply chain management: simulation in the automotive industry," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1271-1289, March.
    2. Scherrer-Rathje, Maike & Boyle, Todd A. & Deflorin, Patricia, 2009. "Lean, take two! Reflections from the second attempt at lean implementation," Business Horizons, Elsevier, vol. 52(1), pages 79-88.
    3. Miriam Pekarcikova & Peter Trebuna & Marek Kliment & Michal Dic, 2021. "Solution of Bottlenecks in the Logistics Flow by Applying the Kanban Module in the Tecnomatix Plant Simulation Software," Sustainability, MDPI, vol. 13(14), pages 1-21, July.
    4. Kroes, James R. & Manikas, Andrew S. & Gattiker, Thomas F., 2018. "Operational leanness and retail firm performance since 1980," International Journal of Production Economics, Elsevier, vol. 197(C), pages 262-274.
    5. Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
    6. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Cristovao Silva & Silvio Carmo-Silva, 2019. "POLC-A: an assessment of POLCA’s authorization element," Journal of Intelligent Manufacturing, Springer, vol. 30(6), pages 2435-2447, August.
    7. Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
    8. Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
    9. Land, Martin J., 2009. "Cobacabana (control of balance by card-based navigation): A card-based system for job shop control," International Journal of Production Economics, Elsevier, vol. 117(1), pages 97-103, January.
    10. Munyaradzi Bvuchete & Sara Saartjie Grobbelaar & Joubert van Eeden, 2021. "A Network Maturity Mapping Tool for Demand-Driven Supply Chain Management: A Case for the Public Healthcare Sector," Sustainability, MDPI, vol. 13(21), pages 1-29, October.
    11. Michael Freeman & Nicos Savva & Stefan Scholtes, 2021. "Economies of Scale and Scope in Hospitals: An Empirical Study of Volume Spillovers," Management Science, INFORMS, vol. 67(2), pages 673-697, February.
    12. Michal Medonos & Marie Jurová, 2016. "Implementing Lean Production - Application of Little's Law," Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis, Mendel University Press, vol. 64(3), pages 1013-1019.
    13. Peter M. Bernegger & Scott Webster, 2014. "Fixed-Cycle Smoothed Production Improves Lean Performance for Make-to-Stock Manufacturing," Interfaces, INFORMS, vol. 44(4), pages 411-427, August.
    14. Michael F. Gorman & Jayden Hoff & Robert Kinion, 2009. "ASP, The Art and Science of Practice: Tales from the Front: Case Studies Indicate the Potential Pitfalls of Misapplication of Lean Improvement Programs," Interfaces, INFORMS, vol. 39(6), pages 540-548, December.
    15. Alireza Farnoush & Magnus Wiktorsson, 2013. "POLCA and CONWIP performance in a divergent production line: an automotive case study," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 159-186, July.
    16. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Ting Qu, 2017. "On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4695-4711, August.
    17. Bárbara Pedó & Carlos T. Formoso & Daniela D. Viana & Patricia Tzortzopoulos & Fernanda M. P. Brandalise & Andrew Whitelock-Wainwright, 2022. "Visual Management Requirements to Support Design Planning and Control within Digital Contexts," Sustainability, MDPI, vol. 14(17), pages 1-27, September.
    18. Oskar P. Roemeling & Martin J. Land & Kees Ahaus & Jannes Slomp & Wouter van den Bijllaardt, 2017. "Impact of lean interventions on time buffer reduction in a hospital setting," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4802-4815, August.
    19. Serel, Doğan A., 2012. "Multi-item quick response system with budget constraint," International Journal of Production Economics, Elsevier, vol. 137(2), pages 235-249.
    20. Wayne Fu & Basak Kalkanci & Ravi Subramanian, 2019. "Are Hazardous Substance Rankings Effective? An Empirical Investigation of Information Dissemination About the Relative Hazards of Chemicals and Emissions Reductions," Manufacturing & Service Operations Management, INFORMS, vol. 21(3), pages 602-619, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:620-626. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.