IDEAS home Printed from https://ideas.repec.org/a/eee/energy/v38y2012i1p398-405.html
   My bibliography  Save this article

Integer fuzzy credibility constrained programming for power system management

Author

Listed:
  • Zhang, Y.M.
  • Huang, G.H.
  • Lin, Q.G.
  • Lu, H.W.

Abstract

In this study, an environmentally friendly model of regional power system was developed to minimize the total cost of a regional power system consisting of an independent power grid. SO2 emission is controlled and capacity expansion is scheduled. In the system, the deterministic variables represent the power supplied from different energy conversion facilities. The binary variables refer to expansions for electricity conversion facilities, with three options given to each technology. To solve this model, an integer credibility constrained programming (ICCP) is developed by incorporating the concepts of credibility based chance constrained programming and mixed integer programming within an optimization framework. ICCP can explicitly address planning problems and systematic uncertainties without unrealistic simplifications. In application, a comparative benefit motivated electricity production system is proposed without SO2 control. Results of two cases are compared which show significant effect of emission control. By setting different credibility levels in constraints, it is able to find that the higher the credibility of energy supply satisfying the needs and total SO2 emission being less than its allowance, and the higher the total energy and lower coal-fired electricity supplies, the higher the total operational costs.

Suggested Citation

  • Zhang, Y.M. & Huang, G.H. & Lin, Q.G. & Lu, H.W., 2012. "Integer fuzzy credibility constrained programming for power system management," Energy, Elsevier, vol. 38(1), pages 398-405.
  • Handle: RePEc:eee:energy:v:38:y:2012:i:1:p:398-405
    DOI: 10.1016/j.energy.2011.11.035
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0360544211007663
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.energy.2011.11.035?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Shrestha, Ram M. & Marpaung, Charles O. P., 2005. "Supply- and demand-side effects of power sector planning with demand-side management options and SO2 emission constraints," Energy Policy, Elsevier, vol. 33(6), pages 815-825, April.
    2. Yaisawarng, Suthathip & Klein, J Douglass, 1994. "The Effects of Sulfur Dioxide Controls on Productivity Change in the U.S. Electric Power Industry," The Review of Economics and Statistics, MIT Press, vol. 76(3), pages 447-460, August.
    3. Cooper, W. W. & Hemphill, H. & Huang, Z. & Li, S. & Lelas, V. & Sullivan, D. W., 1997. "Survey of mathematical programming models in air pollution management," European Journal of Operational Research, Elsevier, vol. 96(1), pages 1-35, January.
    4. Jeong, Suk-Jae & Kim, Kyung-Sup & Park, Jin-Won & Lim, Dong-soon & Lee, Seung-moon, 2008. "Economic comparison between coal-fired and liquefied natural gas combined cycle power plants considering carbon tax: Korean case," Energy, Elsevier, vol. 33(8), pages 1320-1330.
    5. Hobbs, Benjamin F., 1995. "Optimization methods for electric utility resource planning," European Journal of Operational Research, Elsevier, vol. 83(1), pages 1-20, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, G.C. & Huang, G.H. & Sun, W. & Ding, X.W., 2014. "An inexact optimization model for energy-environment systems management in the mixed fuzzy, dual-interval and stochastic environment," Renewable Energy, Elsevier, vol. 64(C), pages 153-163.
    2. Li, Mo & Fu, Qiang & Singh, Vijay P. & Liu, Dong & Li, Tianxiao & Zhou, Yan, 2020. "Managing agricultural water and land resources with tradeoff between economic, environmental, and social considerations: A multi-objective non-linear optimization model under uncertainty," Agricultural Systems, Elsevier, vol. 178(C).
    3. Li, X.M. & Lu, H.W. & Li, J. & Du, P. & Xu, M. & He, L., 2015. "A modified fuzzy credibility constrained programming approach for agricultural water resources management—A case study in Urumqi, China," Agricultural Water Management, Elsevier, vol. 156(C), pages 79-89.
    4. Liu, J. & Nie, S. & Shan, B.G. & Li, Y.P. & Huang, G.H. & Liu, Z.P., 2019. "Development of an interval-credibility-chance constrained energy-water nexus system planning model—a case study of Xiamen, China," Energy, Elsevier, vol. 181(C), pages 677-693.
    5. Zhen, J.L. & Huang, G.H. & Li, W. & Liu, Z.P. & Wu, C.B., 2017. "An inexact optimization model for regional electric system steady operation management considering integrated renewable resources," Energy, Elsevier, vol. 135(C), pages 195-209.
    6. Qinliang Tan & Yihong Ding & Yimei Zhang, 2017. "Optimization Model of an Efficient Collaborative Power Dispatching System for Carbon Emissions Trading in China," Energies, MDPI, vol. 10(9), pages 1-19, September.
    7. Zhang, Chenglong & Li, Xuemin & Guo, Ping & Huo, Zailin, 2021. "Balancing irrigation planning and risk preference for sustainable irrigated agriculture: A fuzzy credibility-based optimization model with the Hurwicz criterion under uncertainty," Agricultural Water Management, Elsevier, vol. 254(C).
    8. Xueying Sun & Zhuo Wang & Jingtao Hu, 2018. "Fuzzy Byproduct Gas Scheduling in the Steel Plant Considering Uncertainty and Risk Analysis," Energies, MDPI, vol. 11(10), pages 1-14, October.
    9. Dai, C. & Cai, Y.P. & Li, Y.P. & Sun, W. & Wang, X.W. & Guo, H.C., 2014. "Optimal strategies for carbon capture, utilization and storage based on an inexact mλ-measure fuzzy chance-constrained programming," Energy, Elsevier, vol. 78(C), pages 465-478.
    10. Aghajani, Mojtaba & Torabi, S. Ali & Heydari, Jafar, 2020. "A novel option contract integrated with supplier selection and inventory prepositioning for humanitarian relief supply chains," Socio-Economic Planning Sciences, Elsevier, vol. 71(C).
    11. S.A. Torabi & J. Namdar & S.M. Hatefi & F. Jolai, 2016. "An enhanced possibilistic programming approach for reliable closed-loop supply chain network design," International Journal of Production Research, Taylor & Francis Journals, vol. 54(5), pages 1358-1387, March.
    12. C. Dai & Y. Cai & Y. Liu & W. Wang & H. Guo, 2015. "A Generalized Interval Fuzzy Chance-Constrained Programming Method for Domestic Wastewater Management Under Uncertainty – A Case Study of Kunming, China," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 29(9), pages 3015-3036, July.
    13. Yuan, Jiahai & Xu, Yan & Kang, Junjie & Zhang, Xingping & Hu, Zheng, 2014. "Nonlinear integrated resource strategic planning model and case study in China's power sector planning," Energy, Elsevier, vol. 67(C), pages 27-40.
    14. Zhang, X.Y. & Huang, G.H. & Zhu, H. & Li, Y.P., 2017. "A fuzzy-stochastic power system planning model: Reflection of dual objectives and dual uncertainties," Energy, Elsevier, vol. 123(C), pages 664-676.
    15. Li, Zhong & Huang, Gordon & Zhang, Yimei & Li, Yongping, 2013. "Inexact two-stage stochastic credibility constrained programming for water quality management," Resources, Conservation & Recycling, Elsevier, vol. 73(C), pages 122-132.
    16. Yu, L. & Li, Y.P. & Huang, G.H. & Fan, Y.R. & Yin, S., 2018. "Planning regional-scale electric power systems under uncertainty: A case study of Jing-Jin-Ji region, China," Applied Energy, Elsevier, vol. 212(C), pages 834-849.
    17. Zhang, Chenglong & Li, Xuemin & Guo, Ping & Huo, Zailin, 2020. "An improved interval-based fuzzy credibility-constrained programming approach for supporting optimal irrigation water management under uncertainty," Agricultural Water Management, Elsevier, vol. 238(C).
    18. Changyu Zhou & Guohe Huang & Jiapei Chen, 2018. "A Multi-Objective Energy and Environmental Systems Planning Model: Management of Uncertainties and Risks for Shanxi Province, China," Energies, MDPI, vol. 11(10), pages 1-21, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Reza Nadimi & Masahito Takahashi & Koji Tokimatsu & Mika Goto, 2024. "The Reliability and Profitability of Virtual Power Plant with Short-Term Power Market Trading and Non-Spinning Reserve Diesel Generator," Energies, MDPI, vol. 17(9), pages 1-19, April.
    2. Stavins, Robert & Jaffe, Adam & Newell, Richard, 2000. "Technological Change and the Environment," Working Paper Series rwp00-002, Harvard University, John F. Kennedy School of Government.
    3. Murtough, Greg & Appels, David & Matysek, Anna & Lovell, C.A. Knox, 2001. "Greenhouse Gas Emissions and the Productivity Growth of Electricity Generators," Staff Research Papers 31917, Productivity Commission.
    4. Gómez-Calvet, Roberto & Conesa, David & Gómez-Calvet, Ana Rosa & Tortosa-Ausina, Emili, 2014. "Energy efficiency in the European Union: What can be learned from the joint application of directional distance functions and slacks-based measures?," Applied Energy, Elsevier, vol. 132(C), pages 137-154.
    5. Lynes, Melissa & Featherstone, Allen, 2015. "Economic Efficiency of Utility Plants Under Renewable Energy Policy," 2015 AAEA & WAEA Joint Annual Meeting, July 26-28, San Francisco, California 205674, Agricultural and Applied Economics Association.
    6. Zhao, Xiaoli & Ma, Chunbo, 2013. "Deregulation, vertical unbundling and the performance of China's large coal-fired power plants," Energy Economics, Elsevier, vol. 40(C), pages 474-483.
    7. Sueyoshi, Toshiyuki & Goto, Mika, 2015. "Environmental assessment on coal-fired power plants in U.S. north-east region by DEA non-radial measurement," Energy Economics, Elsevier, vol. 50(C), pages 125-139.
    8. Pineau, Pierre-Olivier & Rasata, Hasina & Zaccour, Georges, 2011. "Impact of some parameters on investments in oligopolistic electricity markets," European Journal of Operational Research, Elsevier, vol. 213(1), pages 180-195, August.
    9. repec:npf:wpaper:27 is not listed on IDEAS
    10. Jamasb, T. & Pollitt, M., 2000. "Benchmarking and regulation: international electricity experience," Utilities Policy, Elsevier, vol. 9(3), pages 107-130, September.
    11. D. Giannakis & T. Jamasb & M. Pollitt, 2003. "Benchmarking and Incentive Regulation of Quality of Service: an Application to the UK Electricity Distribution Utilities," Working Papers EP35, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    12. Fare, Rolf & Grosskopf, Shawna & Pasurka, Carl Jr., 2007. "Pollution abatement activities and traditional productivity," Ecological Economics, Elsevier, vol. 62(3-4), pages 673-682, May.
    13. Lee, Myunghun, 2007. "Measurement of the in situ value of exhaustible resources: An input distance function," Ecological Economics, Elsevier, vol. 62(3-4), pages 490-495, May.
    14. Jaraitė, Jūratė & Di Maria, Corrado, 2012. "Efficiency, productivity and environmental policy: A case study of power generation in the EU," Energy Economics, Elsevier, vol. 34(5), pages 1557-1568.
    15. Färe, Rolf & Grosskopf, Shawna & Pasurka, Carl A., 2014. "Potential gains from trading bad outputs: The case of U.S. electric power plants," Resource and Energy Economics, Elsevier, vol. 36(1), pages 99-112.
    16. Pasurka, Carl Jr., 2006. "Decomposing electric power plant emissions within a joint production framework," Energy Economics, Elsevier, vol. 28(1), pages 26-43, January.
    17. Chae, Yeoungjin & Kim, Myunghwan & Yoo, Seung-Hoon, 2012. "Does natural gas fuel price cause system marginal price, vice-versa, or neither? A causality analysis," Energy, Elsevier, vol. 47(1), pages 199-204.
    18. Ramírez-Sagner, Gonzalo & Muñoz, Francisco D., 2019. "The effect of head-sensitive hydropower approximations on investments and operations in planning models for policy analysis," Renewable and Sustainable Energy Reviews, Elsevier, vol. 105(C), pages 38-47.
    19. Changhee Kim & Soo Wook Kim & Hee Jay Kang & Seung-Min Song, 2017. "What Makes Urban Transportation Efficient? Evidence from Subway Transfer Stations in Korea," Sustainability, MDPI, vol. 9(11), pages 1-18, November.
    20. Inzunza, Andrés & Muñoz, Francisco D. & Moreno, Rodrigo, 2021. "Measuring the effects of environmental policies on electricity markets risk," Energy Economics, Elsevier, vol. 102(C).
    21. Hach, Daniel & Chyong, Chi Kong & Spinler, Stefan, 2016. "Capacity market design options: A dynamic capacity investment model and a GB case study," European Journal of Operational Research, Elsevier, vol. 249(2), pages 691-705.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:38:y:2012:i:1:p:398-405. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.