Bayesian enhanced strategic decision making for reliability
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Percy, David F. & Kobbacy, Khairy A. H. & Fawzi, Bahir B., 1997. "Setting preventive maintenance schedules when data are sparse," International Journal of Production Economics, Elsevier, vol. 51(3), pages 223-234, September.
- Scarf, Philip A., 1997. "On the application of mathematical models in maintenance," European Journal of Operational Research, Elsevier, vol. 99(3), pages 493-506, June.
- W Wang & P A Scarf & M A J Smith, 2000. "On the application of a model of condition-based maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(11), pages 1218-1227, November.
- F P A Coolen & P Coolen-Schrijner, 2000. "Condition monitoring: a new perspective," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(3), pages 311-319, March.
- A H Christer, 1999. "Developments in delay time analysis for modelling plant maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(11), pages 1120-1137, November.
- M I Desa & A H Christer, 2001. "Modelling in the absence of data: a case study of fleet maintenance in a developing country," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(3), pages 247-260, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- P Coolen-Schrijner & F P A Coolen & S C Shaw, 2006. "Nonparametric adaptive opportunity-based age replacement strategies," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(1), pages 63-81, January.
- A K Suzuki & L E B Salasar & J G Leite & F Louzada-Neto, 2010. "A Bayesian approach for predicting match outcomes: The 2006 (Association) Football World Cup," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(10), pages 1530-1539, October.
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2015. "Optimal loading of system with random repair time," European Journal of Operational Research, Elsevier, vol. 247(1), pages 137-143.
- Sun, Yong & Ma, Lin & Mathew, Joseph & Zhang, Sheng, 2006. "An analytical model for interactive failures," Reliability Engineering and System Safety, Elsevier, vol. 91(5), pages 495-504.
- de Jonge, Bram & Klingenberg, Warse & Teunter, Ruud & Tinga, Tiedo, 2015. "Optimum maintenance strategy under uncertainty in the lifetime distribution," Reliability Engineering and System Safety, Elsevier, vol. 133(C), pages 59-67.
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2015. "Optimal backup frequency in system with random repair time," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 12-22.
- Werner, Christoph & Bedford, Tim & Cooke, Roger M. & Hanea, Anca M. & Morales-Nápoles, Oswaldo, 2017. "Expert judgement for dependence in probabilistic modelling: A systematic literature review and future research directions," European Journal of Operational Research, Elsevier, vol. 258(3), pages 801-819.
- Insua, David Rios & Ruggeri, Fabrizio & Soyer, Refik & Wilson, Simon, 2020. "Advances in Bayesian decision making in reliability," European Journal of Operational Research, Elsevier, vol. 282(1), pages 1-18.
- M Rahrouh & F. P. A. Coolen & P Coolen-Schrijner, 2006. "Bayesian reliability demonstration for systems with redundancy," Journal of Risk and Reliability, , vol. 220(2), pages 137-145, December.
- Yeu‐Shiang Huang & Chi‐Chang Hung & Chih‐Chiang Fang, 2008. "Bayesian enhanced decision making for deteriorating repairable systems with preventive maintenance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 105-115, March.
- E K Doyle & C-G Lee & D I Cho, 2009. "Justification for the next generation of maintenance modelling techniques," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 461-470, April.
- Si, Xiao-Sheng & Wang, Wenbin & Hu, Chang-Hua & Zhou, Dong-Hua, 2011. "Remaining useful life estimation - A review on the statistical data driven approaches," European Journal of Operational Research, Elsevier, vol. 213(1), pages 1-14, August.
- Zu‐Liang Lin & Yeu‐Shiang Huang, 2010. "Nonperiodic preventive maintenance for repairable systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(7), pages 615-625, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cavalcante, C.A.V. & Lopes, R.S. & Scarf, P.A., 2018. "A general inspection and opportunistic replacement policy for one-component systems of variable quality," European Journal of Operational Research, Elsevier, vol. 266(3), pages 911-919.
- van Oosterom, C.D. & Elwany, A.H. & Çelebi, D. & van Houtum, G.J., 2014. "Optimal policies for a delay time model with postponed replacement," European Journal of Operational Research, Elsevier, vol. 232(1), pages 186-197.
- Rajkumar Bhimgonda Patil & Basavraj S Kothavale & Laxman Yadu Waghmode, 2019. "Selection of time-to-failure model for computerized numerical control turning center based on the assessment of trends in maintenance data," Journal of Risk and Reliability, , vol. 233(2), pages 105-117, April.
- Louit, D.M. & Pascual, R. & Jardine, A.K.S., 2009. "A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 94(10), pages 1618-1628.
- Wenbin Wang & Wenjuan Zhang, 2005. "A model to predict the residual life of aircraft engines based upon oil analysis data," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(3), pages 276-284, April.
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V. & Scarf, Philip & Silva, André L.O., 2018. "Modelling inspection and replacement quality for a protection system," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 145-153.
- Wang, Wenbin, 2011. "An inspection model based on a three-stage failure process," Reliability Engineering and System Safety, Elsevier, vol. 96(7), pages 838-848.
- Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
- Scarf, P.A. & Cavalcante, C.A.V. & Lopes, R.S., 2019. "Delay-time modelling of a critical system subject to random inspections," European Journal of Operational Research, Elsevier, vol. 278(3), pages 772-782.
- Percy, David F. & Kobbacy, Khairy A. H., 2000. "Determining economical maintenance intervals," International Journal of Production Economics, Elsevier, vol. 67(1), pages 87-94, August.
- Hui-Ying Wang & Zhao-Qiang Wang, 2022. "A condition-based preventive replacement policy with imperfect manual inspection for a two-stage deterioration process," Journal of Risk and Reliability, , vol. 236(2), pages 225-236, April.
- Nafisah, Ibrahim & Shrahili, Mansour & Alotaibi, Naif & Scarf, Phil, 2019. "Virtual series-system models of imperfect repair," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 604-613.
- Chaoqun Duan & Chao Deng & Bingran Wang, 2019. "Multi-phase sequential preventive maintenance scheduling for deteriorating repairable systems," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1779-1793, April.
- Xuejuan Liu & Wenbin Wang & Rui Peng & Fei Zhao, 2015. "A delay-time-based inspection model for parallel systems," Journal of Risk and Reliability, , vol. 229(6), pages 556-567, December.
- Wang, Wenbin, 2013. "Models of inspection, routine service, and replacement for a serviceable one-component system," Reliability Engineering and System Safety, Elsevier, vol. 116(C), pages 57-63.
- Qinming Liu & Ming Dong & Wenyuan Lv & Chunming Ye, 2019. "Manufacturing system maintenance based on dynamic programming model with prognostics information," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1155-1173, March.
- Scarf, Philip A. & Cavalcante, Cristiano A.V., 2010. "Hybrid block replacement and inspection policies for a multi-component system with heterogeneous component lives," European Journal of Operational Research, Elsevier, vol. 206(2), pages 384-394, October.
- Si, Xiao-Sheng & Wang, Wenbin & Hu, Chang-Hua & Zhou, Dong-Hua, 2011. "Remaining useful life estimation - A review on the statistical data driven approaches," European Journal of Operational Research, Elsevier, vol. 213(1), pages 1-14, August.
- Peters, Lennart & Madlener, Reinhard, 2017.
"Economic evaluation of maintenance strategies for ground-mounted solar photovoltaic plants,"
Applied Energy, Elsevier, vol. 199(C), pages 264-280.
- Peters, Lennart & Madlener, Reinhard, 2016. "Economic Evaluation of Maintenance Strategies for Ground-Mounted Solar Photovoltaic Plants," FCN Working Papers 8/2016, E.ON Energy Research Center, Future Energy Consumer Needs and Behavior (FCN).
- Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:139:y:2002:i:1:p:133-145. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.