Optimal backup frequency in system with random repair time
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2015.06.014
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Castro, I.T. & Pérez-Ocón, R., 2006. "Reward optimization of a repairable system," Reliability Engineering and System Safety, Elsevier, vol. 91(3), pages 311-319.
- Percy, David F., 2002. "Bayesian enhanced strategic decision making for reliability," European Journal of Operational Research, Elsevier, vol. 139(1), pages 133-145, May.
- Soro, Isaac W. & Nourelfath, Mustapha & Aït-Kadi, Daoud, 2010. "Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 95(2), pages 65-69.
- Bloch-Mercier, Sophie, 2002. "A preventive maintenance policy with sequential checking procedure for a Markov deteriorating system," European Journal of Operational Research, Elsevier, vol. 142(3), pages 548-576, November.
- Yeh, Ruey Huei & Chen, Ming-Yuh & Lin, Chen-Yi, 2007. "Optimal periodic replacement policy for repairable products under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1678-1686, February.
- Taghipour, Sharareh & Banjevic, Dragan & Jardine, Andrew K.S., 2010. "Periodic inspection optimization model for a complex repairable system," Reliability Engineering and System Safety, Elsevier, vol. 95(9), pages 944-952.
- Yuan, Li & Xu, Jian, 2011. "An optimal replacement policy for a repairable system based on its repairman having vacations," Reliability Engineering and System Safety, Elsevier, vol. 96(7), pages 868-875.
- Taghipour, Sharareh & Banjevic, Dragan, 2012. "Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements," European Journal of Operational Research, Elsevier, vol. 220(3), pages 649-660.
- Yeh, Ruey Huei & Lo, Hui-Chiung, 2001. "Optimal preventive-maintenance warranty policy for repairable products," European Journal of Operational Research, Elsevier, vol. 134(1), pages 59-69, October.
- Zhang, Yuan Lin & Wang, Guan Jun, 2007. "A deteriorating cold standby repairable system with priority in use," European Journal of Operational Research, Elsevier, vol. 183(1), pages 278-295, November.
- Sharareh Taghipour & Dragan Banjevic, 2012. "Optimum inspection interval for a system under periodic and opportunistic inspections," IISE Transactions, Taylor & Francis Journals, vol. 44(11), pages 932-948.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2018. "Co-optimization of state dependent loading and mission abort policy in heterogeneous warm standby systems," Reliability Engineering and System Safety, Elsevier, vol. 172(C), pages 151-158.
- Levitin, Gregory & Finkelstein, Maxim, 2017. "Optimal backup in heterogeneous standby systems exposed to shocks," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 336-344.
- Chatterjee, Debolina & Sarkar, Jyotirmoy, 2020. "Computing limiting average availability of a repairable system through discretization," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Levitin, Gregory & Xing, Liudong & Huang, Hong Zhong, 2019. "Dynamic availability and performance deficiency of common bus systems with imperfectly repairable components," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 58-66.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2015. "Optimal loading of system with random repair time," European Journal of Operational Research, Elsevier, vol. 247(1), pages 137-143.
- Hajipour, Yassin & Taghipour, Sharareh, 2016. "Non-periodic inspection optimization of multi-component and k-out-of-m systems," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 228-243.
- Shen, Jingyuan & Hu, Jiawen & Ma, Yizhong, 2020. "Two preventive replacement strategies for systems with protective auxiliary parts subject to degradation and economic dependence," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Yu, Miaomiao & Tang, Yinghui & Liu, Liping & Cheng, Jiang, 2013. "A phase-type geometric process repair model with spare device procurement and repairman’s multiple vacations," European Journal of Operational Research, Elsevier, vol. 225(2), pages 310-323.
- Yang, Li & Ma, Xiaobing & Zhai, Qingqing & Zhao, Yu, 2016. "A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement," Reliability Engineering and System Safety, Elsevier, vol. 150(C), pages 96-104.
- Seyedhosseini, Seyed Mohammad & Moakedi, Hamid & Shahanaghi, Kamran, 2018. "Imperfect inspection optimization for a two-component system subject to hidden and two-stage revealed failures over a finite time horizon," Reliability Engineering and System Safety, Elsevier, vol. 174(C), pages 141-156.
- Bjarnason, Erik T.S. & Taghipour, Sharareh & Banjevic, Dragan, 2014. "Joint optimal inspection and inventory for a k-out-of-n system," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 203-215.
- Chien, Yu-Hung, 2010. "Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty," International Journal of Production Economics, Elsevier, vol. 124(1), pages 198-205, March.
- Zhang, Nan & Cai, Kaiquan & Zhang, Jun & Wang, Tian, 2022. "A condition-based maintenance policy considering failure dependence and imperfect inspection for a two-component system," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
- Cha, Ji Hwan & Finkelstein, Maxim, 2016. "On information-based warranty policy for repairable products from heterogeneous populationAuthor-Name: Lee, Hyunju," European Journal of Operational Research, Elsevier, vol. 253(1), pages 204-215.
- Levitin, Gregory & Finkelstein, Maxim & Huang, Hong-Zhong, 2019. "Scheduling of imperfect inspections for reliability critical systems with shock-driven defects and delayed failures," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 89-98.
- Guan Jun Wang & Yuan Lin Zhang, 2016. "Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1021-1031, April.
- J-A Chen & Y-H Chien, 2007. "Optimal age-replacement policy for renewing warranted products," Journal of Risk and Reliability, , vol. 221(4), pages 229-237, December.
- Wang, Wei & Wu, Zhiying & Xiong, Junlin & Xu, Yaofeng, 2018. "Redundancy optimization of cold-standby systems under periodic inspection and maintenance," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 394-402.
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V., 2017. "A study of postponed replacement in a delay time model," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 70-79.
- Chien, Yu-Hung & Zhang, Zhe George & Yin, Xiaoling, 2019. "On optimal preventive-maintenance policy for generalized Polya process repairable products under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 279(1), pages 68-78.
- Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
- Chien, Yu-Hung, 2019. "The optimal preventive-maintenance policy for a NHPBP repairable system under free-repair warranty," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 444-453.
- Huang, Yeu-Shiang & Gau, Wei-Yo & Ho, Jyh-Wen, 2015. "Cost analysis of two-dimensional warranty for products with periodic preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 134(C), pages 51-58.
- Liu, Baoliang & Cui, Lirong & Wen, Yanqing & Shen, Jingyuan, 2015. "A cold standby repairable system with working vacations and vacation interruption following Markovian arrival process," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 1-8.
More about this item
Keywords
Backup; Repair; Mission reliability; Mission cost; Mission time;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:144:y:2015:i:c:p:12-22. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.