Setting preventive maintenance schedules when data are sparse
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- אסתר טולידנו, 1996. "מקבלי דמי אבטלה בשנת 1995," Working Papers 509, National Insurance Institute of Israel.
- חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
- אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
- הנק הבסי ובלהה זיסלין, 1996. "תב"ל - תעסוקת בית למרותקים," Working Papers 162, National Insurance Institute of Israel.
- Geraerds, W. M. J., 1992. "The EUT maintenance model," International Journal of Production Economics, Elsevier, vol. 24(3), pages 209-216, March.
- תמר אליאב, 1996. "גמלאות אמהות 1995-1992," Working Papers 395, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rajkumar Bhimgonda Patil & Basavraj S Kothavale & Laxman Yadu Waghmode, 2019. "Selection of time-to-failure model for computerized numerical control turning center based on the assessment of trends in maintenance data," Journal of Risk and Reliability, , vol. 233(2), pages 105-117, April.
- Oleg Gubarevych & Stanisław Duer & Inna Melkonova & Marek Woźniak & Jacek Paś & Marek Stawowy & Krzysztof Rokosz & Konrad Zajkowski & Dariusz Bernatowicz, 2023. "Research on and Assessment of the Reliability of Railway Transport Systems with Induction Motors," Energies, MDPI, vol. 16(19), pages 1-21, September.
- Percy, David F., 2002. "Bayesian enhanced strategic decision making for reliability," European Journal of Operational Research, Elsevier, vol. 139(1), pages 133-145, May.
- Percy, David F. & Kobbacy, Khairy A. H., 2000. "Determining economical maintenance intervals," International Journal of Production Economics, Elsevier, vol. 67(1), pages 87-94, August.
- Louit, D.M. & Pascual, R. & Jardine, A.K.S., 2009. "A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 94(10), pages 1618-1628.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014.
"Network DEA II,"
International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327,
Springer.
- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2007. "Network DEA," Springer Books, in: Joe Zhu & Wade D. Cook (ed.), Modeling Data Irregularities and Structural Complexities in Data Envelopment Analysis, chapter 0, pages 209-240, Springer.
- Fare, Rolf & Grosskopf, Shawna, 2000. "Network DEA," Socio-Economic Planning Sciences, Elsevier, vol. 34(1), pages 35-49, March.
- Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
- de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
- Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
- Ammar, Salwa & Wright, Ronald, 2000. "Applying fuzzy-set theory to performance evaluation," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 285-302, December.
- Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
- Lillrank, Paul & Holopainen, Sami & Paavola, Teemu, 2002. "Analyzing productivity with the enabler-effect map," International Journal of Production Economics, Elsevier, vol. 78(1), pages 69-78, July.
- Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
- Kim, Bowon, 1998. "Optimal development of production technology when autonomous and induced learning are present," International Journal of Production Economics, Elsevier, vol. 55(1), pages 39-52, June.
- Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
- Schmidt, Gunter, 2000. "Performance guarantee of two simple priority rules for production scheduling," International Journal of Production Economics, Elsevier, vol. 68(2), pages 151-159, November.
- Levitin, G. & Meizin, L., 2001. "Structure optimization for continuous production systems with buffers under reliability constraints," International Journal of Production Economics, Elsevier, vol. 70(1), pages 77-87, March.
- Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
- Bailey, Keiron & Grossardt, Ted & Pride-Wells, Michaele, 2007. "Community design of a light rail transit-oriented development using casewise visual evaluation (CAVE)," Socio-Economic Planning Sciences, Elsevier, vol. 41(3), pages 235-254, September.
- Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
- Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
- Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
- A.M. Lima, Marcos & Resende, Marcelo & Hasenclever, Lia, 2000. "Quality certification and performance of Brazilian firms: An empirical study," International Journal of Production Economics, Elsevier, vol. 66(2), pages 143-147, June.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Hinterhuber, Hans H. & Friedrich, Stephan A., 2002. "The technology dimension of strategic leadership : The leadership challenge for production economists," International Journal of Production Economics, Elsevier, vol. 77(3), pages 191-203, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:51:y:1997:i:3:p:223-234. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.