Inventory control of service parts in the final phase: A central depot and repair kits
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
- John W. Mamer & Stephen A. Smith, 1985. "Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines," Management Science, INFORMS, vol. 31(6), pages 703-718, June.
- Stephen C. Graves, 1982. "Note---A Multiple-Item Inventory Model with a Job Completion Criterion," Management Science, INFORMS, vol. 28(11), pages 1334-1337, November.
- John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
- Shelby Brumelle & Daniel Granot, 1993. "The Repair Kit Problem Revisited," Operations Research, INFORMS, vol. 41(5), pages 994-1006, October.
- Stephen A. Smith & John C. Chambers & Eli Shlifer, 1980. "Note---Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items," Management Science, INFORMS, vol. 26(8), pages 849-854, August.
- Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
- Behfard, S. & van der Heijden, M.C. & Al Hanbali, A. & Zijm, W.H.M., 2015. "Last time buy and repair decisions for spare parts," European Journal of Operational Research, Elsevier, vol. 244(2), pages 498-510.
- Pinçe, Çerag & Dekker, Rommert, 2011.
"An inventory model for slow moving items subject to obsolescence,"
European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
- Pinçe, C. & Dekker, R., 2009. "An Inventory Model for Slow Moving Items Subject to Obsolescence," ERIM Report Series Research in Management ERS-2009-053-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
- Güllü, Refik & Köksalan, Murat, 2013. "A model for performance evaluation and stock optimization in a kit management problem," International Journal of Production Economics, Elsevier, vol. 143(2), pages 527-535.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
- Shuang Chen & Joseph Geunes, 2013. "Optimal allocation of stock levels and stochastic customer demands to a capacitated resource," Annals of Operations Research, Springer, vol. 203(1), pages 33-54, March.
- J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
- Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
- Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
- Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
- Bijvank, Marco & Koole, Ger & Vis, Iris F.A., 2010. "Optimising a general repair kit problem with a service constraint," European Journal of Operational Research, Elsevier, vol. 204(1), pages 76-85, July.
- Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
- Rachel Q. Zhang, 1999. "Expected time delay in multi‐item inventory systems with correlated demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 671-688, September.
- Michael F. Gorman, 2023. "Case Article—Swirltubs After-Market Product Inventory and Service Case," INFORMS Transactions on Education, INFORMS, vol. 23(3), pages 149-151, May.
- Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
- Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
- Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
- Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
- K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
- Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
- Liu, Ke & Li, Jing-An & Lai, Kin Keung, 2004. "Single period, single product newsvendor model with random supply shock," European Journal of Operational Research, Elsevier, vol. 158(3), pages 609-625, November.
- Stephen A. Smith & Narendra Agrawal, 2000. "Management of Multi-Item Retail Inventory Systems with Demand Substitution," Operations Research, INFORMS, vol. 48(1), pages 50-64, February.
- Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
- Narendra Agrawal & Stephen A. Smith, 2003. "Optimal retail assortments for substitutable items purchased in sets," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 793-822, October.
- Shuang Chen & Joseph Geunes, 2013. "Optimal allocation of stock levels and stochastic customer demands to a capacitated resource," Annals of Operations Research, Springer, vol. 203(1), pages 33-54, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:138:y:2002:i:1:p:76-86. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.