IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v158y2004i3p609-625.html
   My bibliography  Save this article

Single period, single product newsvendor model with random supply shock

Author

Listed:
  • Liu, Ke
  • Li, Jing-An
  • Lai, Kin Keung

Abstract

No abstract is available for this item.

Suggested Citation

  • Liu, Ke & Li, Jing-An & Lai, Kin Keung, 2004. "Single period, single product newsvendor model with random supply shock," European Journal of Operational Research, Elsevier, vol. 158(3), pages 609-625, November.
  • Handle: RePEc:eee:ejores:v:158:y:2004:i:3:p:609-625
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00382-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Parlar, Mahmut & Wang, Dan, 1993. "Diversification under yield randomness in inventory models," European Journal of Operational Research, Elsevier, vol. 66(1), pages 52-64, April.
    2. John W. Mamer & Stephen A. Smith, 1985. "Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines," Management Science, INFORMS, vol. 31(6), pages 703-718, June.
    3. Stephen C. Graves, 1982. "Note---A Multiple-Item Inventory Model with a Job Completion Criterion," Management Science, INFORMS, vol. 28(11), pages 1334-1337, November.
    4. Khouja, Moutaz, 1999. "The single-period (news-vendor) problem: literature review and suggestions for future research," Omega, Elsevier, vol. 27(5), pages 537-553, October.
    5. Lau, Hon-Shiang & Hing-Ling Lau, Amy, 1996. "The newsstand problem: A capacitated multiple-product single-period inventory problem," European Journal of Operational Research, Elsevier, vol. 94(1), pages 29-42, October.
    6. Salvatore T. March & Gary D. Scudder, 1984. "Note---On "Optimizing Field Repair Kits Based on Job Completion Rate"," Management Science, INFORMS, vol. 30(8), pages 1025-1028, August.
    7. John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
    8. Ravi Anupindi & Ram Akella, 1993. "Diversification Under Supply Uncertainty," Management Science, INFORMS, vol. 39(8), pages 944-963, August.
    9. George Tagaras & Hau L. Lee, 1996. "Economic Models for Vendor Evaluation with Quality Cost Analysis," Management Science, INFORMS, vol. 42(11), pages 1531-1543, November.
    10. John W. Mamer & Andrew W. Shogan, 1987. "A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection," Management Science, INFORMS, vol. 33(6), pages 800-806, June.
    11. David W. Pentico, 1974. "The Assortment Problem with Probabilistic Demands," Management Science, INFORMS, vol. 21(3), pages 286-290, November.
    12. Arthur F. Veinott, Jr., 1966. "The Status of Mathematical Inventory Theory," Management Science, INFORMS, vol. 12(11), pages 745-777, July.
    13. Yehuda Bassok & Ravi Anupindi & Ram Akella, 1999. "Single-Period Multiproduct Inventory Models with Substitution," Operations Research, INFORMS, vol. 47(4), pages 632-642, August.
    14. Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
    15. Arthur F. Veinott, Jr., 1965. "Optimal Policy for a Multi-Product, Dynamic, Nonstationary Inventory Problem," Management Science, INFORMS, vol. 12(3), pages 206-222, November.
    16. Steven A. Lippman & Kevin F. McCardle, 1997. "The Competitive Newsboy," Operations Research, INFORMS, vol. 45(1), pages 54-65, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Choi, Sangdo & Ketzenberg, Michael, 2018. "An inverse newsvendor model to set the optimal number of customers in a capacitated environment," International Journal of Production Economics, Elsevier, vol. 196(C), pages 188-197.
    2. Wagner, Laura & Gürbüz, Mustafa Ҫagri & Parlar, Mahmut, 2019. "Is it fake? Using potentially low quality suppliers as back-up when genuine suppliers are unavailable," International Journal of Production Economics, Elsevier, vol. 213(C), pages 185-200.
    3. K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
    4. Hu, Shu & Fu, Ke & Wu, Tong, 2021. "The role of consumer behavior and power structures in coping with shoddy goods," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 155(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
    2. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    3. Rachel Q. Zhang, 1999. "Expected time delay in multi‐item inventory systems with correlated demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 671-688, September.
    4. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    5. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    6. Khouja, Moutaz, 1999. "The single-period (news-vendor) problem: literature review and suggestions for future research," Omega, Elsevier, vol. 27(5), pages 537-553, October.
    7. Baloch, Gohram & Gzara, Fatma, 2020. "Capacity and assortment planning under one-way supplier-driven substitution for pharmacy kiosks with low drug demand," European Journal of Operational Research, Elsevier, vol. 282(1), pages 108-128.
    8. Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
    9. Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
    10. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    11. Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
    12. Dada, Maqbool & Petruzzi, Nicholas C. & Schwarz, Leroy B., 2003. "A Newsvendor Model with Unreliable Suppliers," Working Papers 03-0112, University of Illinois at Urbana-Champaign, College of Business.
    13. Dorothée Honhon & Vishal Gaur & Sridhar Seshadri, 2010. "Assortment Planning and Inventory Decisions Under Stockout-Based Substitution," Operations Research, INFORMS, vol. 58(5), pages 1364-1379, October.
    14. Xue, Weili & Choi, Tsan-Ming & Ma, Lijun, 2016. "Diversification strategy with random yield suppliers for a mean–variance risk-sensitive manufacturer," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 90(C), pages 90-107.
    15. Maqbool Dada & Nicholas C. Petruzzi & Leroy B. Schwarz, 2007. "A Newsvendor's Procurement Problem when Suppliers Are Unreliable," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 9-32, August.
    16. Hübner, Alexander & Kuhn, Heinrich & Kühn, Sandro, 2016. "An efficient algorithm for capacitated assortment planning with stochastic demand and substitution," European Journal of Operational Research, Elsevier, vol. 250(2), pages 505-520.
    17. Qi Feng & Justin Jia & J. George Shanthikumar, 2019. "Dynamic Multisourcing with Dependent Supplies," Management Science, INFORMS, vol. 67(6), pages 2770-2786, June.
    18. Zhu, Stuart X., 2015. "Dynamic replenishment from two sources with different yields, costs, and leadtimes," International Journal of Production Economics, Elsevier, vol. 165(C), pages 79-89.
    19. Pritee Ray & Mamata Jenamani, 2016. "Sourcing decision under disruption risk with supply and demand uncertainty: A newsvendor approach," Annals of Operations Research, Springer, vol. 237(1), pages 237-262, February.
    20. Huang, Di & Zhou, Hong & Zhao, Qiu-Hong, 2011. "A competitive multiple-product newsboy problem with partial product substitution," Omega, Elsevier, vol. 39(3), pages 302-312, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:158:y:2004:i:3:p:609-625. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.