Capacitated selection problem
Author
Abstract
Suggested Citation
DOI: 10.1002/(SICI)1520-6750(199902)46:13.0.CO;2-L
Download full text from publisher
References listed on IDEAS
- Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
- Stephen C. Graves, 1982. "Note---A Multiple-Item Inventory Model with a Job Completion Criterion," Management Science, INFORMS, vol. 28(11), pages 1334-1337, November.
- John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
- Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants," Operations Research, INFORMS, vol. 36(5), pages 778-784, October.
- Marshall L. Fisher, 1981. "The Lagrangian Relaxation Method for Solving Integer Programming Problems," Management Science, INFORMS, vol. 27(1), pages 1-18, January.
- Crama, Yves & Oerlemans, Alwin G., 1994. "A column generation approach to job grouping for flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 78(1), pages 58-80, October.
- J. M. W. Rhys, 1970. "A Selection Problem of Shared Fixed Costs and Network Flows," Management Science, INFORMS, vol. 17(3), pages 200-207, November.
- Shelby Brumelle & Daniel Granot, 1993. "The Repair Kit Problem Revisited," Operations Research, INFORMS, vol. 41(5), pages 994-1006, October.
- Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches," Operations Research, INFORMS, vol. 36(5), pages 767-777, October.
- Stephen A. Smith & John C. Chambers & Eli Shlifer, 1980. "Note---Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items," Management Science, INFORMS, vol. 26(8), pages 849-854, August.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
- Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
- Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
- Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
- Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
- Furrer, Martina & Mütze, Torsten, 2017. "An algorithmic framework for tool switching problems with multiple objectives," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1003-1016.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
- Marc Peeters & Zeger Degraeve, 2004. "The Co-Printing Problem: A Packing Problem with a Color Constraint," Operations Research, INFORMS, vol. 52(4), pages 623-638, August.
- Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
- Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
- Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
- Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
- Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
- Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
- Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1995. "Impact of job-sequence on the down-time of a deteriorating flexible machine," European Journal of Operational Research, Elsevier, vol. 87(2), pages 299-315, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:46:y:1999:i:1:p:19-37. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.