IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v143y2013i2p527-535.html
   My bibliography  Save this article

A model for performance evaluation and stock optimization in a kit management problem

Author

Listed:
  • Güllü, Refik
  • Köksalan, Murat

Abstract

In this paper we consider a kit planning problem where demand occurrences are not for individual items, but for kits (a group of items). Each kit contains an arbitrary number of items. Kit demands occur according to a Poisson process. Whenever a kit demand occurs, only one item from the kit is used and the rest is returned as unused. The item that will be used from the kit is not known in advance and the whole kit has to stay at the demand site for the whole duration. The used item is replenished through a stochastic supply system, with possible capacity limitation. This model has applications in health care (planning surgical implant inventories), and repair kit management systems. As a demand for a kit triggers simultaneous demands for the items within the kit, the individual demand arrival processes for the items in that kit are correlated. Therefore, finding the joint probability distribution of the number of items that are outstanding, and hence finding the probability of kit availability, is generally difficult. We can obtain these terms in a fairly explicit form under the assumption that an item which is not in stock when a kit demand occurs can be obtained through borrowing from an emergency supply channel. As soon as a unit of such an item becomes available, it is returned back to its original supply source. We also formulate an optimization problem where the expected holding cost of items is minimized, and pre-specified kit availability constraints are satisfied. Since the optimization problem is hard to solve, we provide a heuristic procedure for obtaining the stock levels, and test the quality of the heuristic.

Suggested Citation

  • Güllü, Refik & Köksalan, Murat, 2013. "A model for performance evaluation and stock optimization in a kit management problem," International Journal of Production Economics, Elsevier, vol. 143(2), pages 527-535.
  • Handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:527-535
    DOI: 10.1016/j.ijpe.2012.01.028
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312000308
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.01.028?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    2. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    3. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
    4. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
    5. Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
    6. Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
    7. Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
    8. Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    2. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    3. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    4. Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
    5. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    6. Jing-Sheng Song & Yao Zhao, 2009. "The Value of Component Commonality in a Dynamic Inventory System with Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 11(3), pages 493-508, March.
    7. Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
    8. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
    9. Ana Bušić & Ingrid Vliegen & Alan Scheller-Wolf, 2012. "Comparing Markov Chains: Aggregation and Precedence Relations Applied to Sets of States, with Applications to Assemble-to-Order Systems," Mathematics of Operations Research, INFORMS, vol. 37(2), pages 259-287, May.
    10. Susan H. Xu & Zhaolin Li, 2007. "Managing a Single-Product Assemble-to-Order System with Technology Innovations," Management Science, INFORMS, vol. 53(9), pages 1467-1485, September.
    11. Michael Dreyfuss & Alan Stulman, 2018. "Waiting time distribution for an exchangeable item repair system with up to two failed components," Annals of Operations Research, Springer, vol. 261(1), pages 167-184, February.
    12. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    13. Yingdong Lu & Jing-Sheng Song & Yao Zhao, 2010. "No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems," Operations Research, INFORMS, vol. 58(3), pages 691-705, June.
    14. Savas Dayanik & Jing-Sheng Song & Susan H. Xu, 2003. "The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 230-251, December.
    15. Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
    16. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
    17. Larsen, Christian, 2011. "Derivation of confidence intervals of service measures in a base-stock inventory control system with low-frequent demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 69-75, May.
    18. J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
    19. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    20. Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:527-535. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.