Last time buy and repair decisions for spare parts
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2015.02.003
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
- John R. Moore, Jr., 1971. "Forecasting and Scheduling for Past-Model Replacement Parts," Management Science, INFORMS, vol. 18(4-Part-I), pages 200-213, December.
- Ritchie, E. & Wilcox, P., 1977. "Renewal theory forecasting for stock control," European Journal of Operational Research, Elsevier, vol. 1(2), pages 90-93, March.
- M. Pourakbar & E. Laan & R. Dekker, 2014.
"End-of-Life Inventory Problem with Phaseout Returns,"
Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
- Pourakbar, M. & van der Laan, E.A. & Dekker, R., 2011. "End-of-Life Inventory Problem with Phase-out Returns," Econometric Institute Research Papers EI 2011-12, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Iida, Tetsuo, 2002. "A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand," European Journal of Operational Research, Elsevier, vol. 140(3), pages 670-683, August.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 1998. "The `final orderrs problem," European Journal of Operational Research, Elsevier, vol. 107(1), pages 35-44, May.
- Krikke, H.R. & van der Laan, E., 2009.
"Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems,"
Other publications TiSEM
c1a3c438-6d31-4147-afd7-8, Tilburg University, School of Economics and Management.
- Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Discussion Paper 2009-66, Tilburg University, Center for Economic Research.
- van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
- A. Federgruen & P. Zipkin, 1986. "An Inventory Model with Limited Production Capacity and Uncertain Demands I. The Average-Cost Criterion," Mathematics of Operations Research, INFORMS, vol. 11(2), pages 193-207, May.
- Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
- Mordechai Henig & Yigal Gerchak, 1990. "The Structure of Periodic Review Policies in the Presence of Random Yield," Operations Research, INFORMS, vol. 38(4), pages 634-643, August.
- Teunter, Ruud H. & Fortuin, Leonard, 1999. "End-of-life service," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 487-497, March.
- Nicholas W. Leifker & Philip C. Jones & Timothy J. Lowe, 2014. "Determining Optimal Order Amount for End-of-Life Parts Acquisition with Possibility of Contract Extension," The Engineering Economist, Taylor & Francis Journals, vol. 59(4), pages 259-281, October.
- J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
- Nicholas Leifker & Philip Jones & Timothy Lowe, 2012. "A Continuous-Time Examination of End-of-Life Parts Acquisition With Limited Customer Information," The Engineering Economist, Taylor & Francis Journals, vol. 57(4), pages 284-301.
- Teunter, Ruud H. & Fortuin, Leonard, 1998. "End-of-life service: A case study," European Journal of Operational Research, Elsevier, vol. 107(1), pages 19-34, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ta-Yu Chen & Woo-Tsong Lin & Chwen Sheu, 2018. "A Dynamic Failure Rate Forecasting Model for Service Parts Inventory," Sustainability, MDPI, vol. 10(7), pages 1-23, July.
- Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
- Hu, Qiwei & Chakhar, Salem & Siraj, Sajid & Labib, Ashraf, 2017. "Spare parts classification in industrial manufacturing using the dominance-based rough set approach," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1136-1163.
- Binoy Debnath & Md Shihab Shakur & Fahmida Tanjum & M. Azizur Rahman & Ziaul Haq Adnan, 2022. "Impact of Additive Manufacturing on the Supply Chain of Aerospace Spare Parts Industry—A Review," Logistics, MDPI, vol. 6(2), pages 1-25, April.
- Yongquan, Sun & Xi, Chen & He, Ren & Yingchao, Jin & Quanwu, Liu, 2016. "Ordering decision-making methods on spare parts for a new aircraft fleet based on a two-sample prediction," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 40-50.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
- Christopher A. Boone & Benjamin T. Hazen & Joseph B. Skipper & Robert E. Overstreet, 2018. "A framework for investigating optimization of service parts performance with big data," Annals of Operations Research, Springer, vol. 270(1), pages 65-74, November.
- Kleber, Rainer & Quariguasi Frota Neto, João & Reimann, Marc, 2023. "The role of part failure rates asymmetry and spare part proprietariness on remanufacturing decision making," European Journal of Operational Research, Elsevier, vol. 310(1), pages 185-200.
- Lin, Junyi & Naim, Mohamed M. & Tang, Ou, 2024. "In-house or outsourcing? The impact of remanufacturing strategies on the dynamics of component remanufacturing systems under lifecycle demand and returns," European Journal of Operational Research, Elsevier, vol. 315(3), pages 965-979.
- Sheikh-Zadeh, Alireza & Rossetti, Manuel D., 2020. "Classification methods for problem size reduction in spare part provisioning," International Journal of Production Economics, Elsevier, vol. 219(C), pages 99-114.
- Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
- Ozyoruk, Emin & Erkip, Nesim Kohen & Ararat, Çağın, 2022. "End-of-life inventory management problem: Results and insights," International Journal of Production Economics, Elsevier, vol. 243(C).
- Pourakbar, Morteza & Dekker, Rommert, 2012.
"Customer differentiated end-of-life inventory problem,"
European Journal of Operational Research, Elsevier, vol. 222(1), pages 44-53.
- Pourakbar, M. & Dekker, R., 2011. "Customer Differentiated End-of-Life Inventory Problem," Econometric Institute Research Papers EI 2011-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- J. B. G. Frenk & Sonya Javadi & Semih O. Sezer, 2019. "An optimal stopping approach for the end-of-life inventory problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 329-363, December.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Frenk, J.B.G. & Javadi, S. & Pourakbar, M. & Sezer, S.O., 2019. "An exact static solution approach for the service parts end-of-life inventory problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 496-504.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
- Shi, Zhenyang & Liu, Shaoxuan, 2020. "Optimal inventory control and design refresh selection in managing part obsolescence," European Journal of Operational Research, Elsevier, vol. 287(1), pages 133-144.
- van der Heijden, Matthieu & Iskandar, Bermawi P., 2013. "Last time buy decisions for products sold under warranty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 302-312.
- M. Pourakbar & E. Laan & R. Dekker, 2014.
"End-of-Life Inventory Problem with Phaseout Returns,"
Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1561-1576, September.
- Pourakbar, M. & van der Laan, E.A. & Dekker, R., 2011. "End-of-Life Inventory Problem with Phase-out Returns," Econometric Institute Research Papers EI 2011-12, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- J. B. G. Frenk & Canan Pehlivan & Semih O. Sezer, 2019. "Order and exit decisions under non-increasing price curves for products with short life cycles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(3), pages 365-397, December.
- Pourakbar, M. & Frenk, J.B.G. & Dekker, R., 2010. "End-of-Life Inventory Decisions for Consumer Electronics Service Parts," Econometric Institute Research Papers EI 2009-48, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Dwayne Cole & Burak Kazaz & Scott Webster, 2016. "Final purchase and trade-in decisions in response to a component phase-out announcement: a deterministic analysis," International Journal of Production Research, Taylor & Francis Journals, vol. 54(5), pages 1257-1272, March.
- Pinçe, Çerag & Dekker, Rommert, 2011.
"An inventory model for slow moving items subject to obsolescence,"
European Journal of Operational Research, Elsevier, vol. 213(1), pages 83-95, August.
- Pinçe, C. & Dekker, R., 2009. "An Inventory Model for Slow Moving Items Subject to Obsolescence," ERIM Report Series Research in Management ERS-2009-053-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- J P J van Kooten & T Tan, 2009. "The final order problem for repairable spare parts under condemnation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(10), pages 1449-1461, October.
- Shen, Yuelin & Willems, Sean P., 2014. "Modeling sourcing strategies to mitigate part obsolescence," European Journal of Operational Research, Elsevier, vol. 236(2), pages 522-533.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase," European Journal of Operational Research, Elsevier, vol. 137(3), pages 497-511, March.
- Krikke, H.R. & van der Laan, E., 2009.
"Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems,"
Discussion Paper
2009-66, Tilburg University, Center for Economic Research.
- Krikke, H.R. & van der Laan, E., 2009. "Last Time Buy and Control Policies With Phase-Out Returns : A Case Study in Plant Control Systems," Other publications TiSEM c1a3c438-6d31-4147-afd7-8, Tilburg University, School of Economics and Management.
- Karl Inderfurth & Rainer Kleber, 2010. "An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production," FEMM Working Papers 100005, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
More about this item
Keywords
Inventory; Stochastic processes; Spare parts; Last time buy; Repair;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:244:y:2015:i:2:p:498-510. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.