The added value of advance demand information for the planning of a repair kit
Author
Abstract
Suggested Citation
DOI: 10.1007/s10100-022-00809-1
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Stephen C. Graves, 1982. "Note---A Multiple-Item Inventory Model with a Job Completion Criterion," Management Science, INFORMS, vol. 28(11), pages 1334-1337, November.
- Salvatore T. March & Gary D. Scudder, 1984. "Note---On "Optimizing Field Repair Kits Based on Job Completion Rate"," Management Science, INFORMS, vol. 30(8), pages 1025-1028, August.
- Özalp Özer & Wei Wei, 2004. "Inventory Control with Limited Capacity and Advance Demand Information," Operations Research, INFORMS, vol. 52(6), pages 988-1000, December.
- Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
- John W. Mamer & Stephen A. Smith, 1985. "Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines," Management Science, INFORMS, vol. 31(6), pages 703-718, June.
- Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
- Shelby Brumelle & Daniel Granot, 1993. "The Repair Kit Problem Revisited," Operations Research, INFORMS, vol. 41(5), pages 994-1006, October.
- Stephen A. Smith & John C. Chambers & Eli Shlifer, 1980. "Note---Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items," Management Science, INFORMS, vol. 26(8), pages 849-854, August.
- Guillermo Gallego & Özalp Özer, 2001. "Integrating Replenishment Decisions with Advance Demand Information," Management Science, INFORMS, vol. 47(10), pages 1344-1360, October.
- John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
- Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
- Johan Marklund, 2006. "Controlling Inventories in Divergent Supply Chains with Advance-Order Information," Operations Research, INFORMS, vol. 54(5), pages 988-1010, October.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
- Alexandar Angelus & Özalp Özer, 2016. "Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information," Operations Research, INFORMS, vol. 64(6), pages 1338-1371, December.
- Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
- Özalp Özer, 2003. "Replenishment Strategies for Distribution Systems Under Advance Demand Information," Management Science, INFORMS, vol. 49(3), pages 255-272, March.
- John W. Mamer & Andrew W. Shogan, 1987. "A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection," Management Science, INFORMS, vol. 33(6), pages 800-806, June.
- Rema Hariharan & Paul Zipkin, 1995. "Customer-Order Information, Leadtimes, and Inventories," Management Science, INFORMS, vol. 41(10), pages 1599-1607, October.
- Teunter, Ruud H., 2006. "The multiple-job repair kit problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1103-1116, December.
- Guillermo Gallego & Özalp Özer, 2003. "Optimal Replenishment Policies for Multiechelon Inventory Problems Under Advance Demand Information," Manufacturing & Service Operations Management, INFORMS, vol. 5(2), pages 157-175, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Dursun, İpek & Grishina, Anastasiia & Akcay, Alp & van Houtum, Geert-Jan, 2024. "Spare parts recommendation for corrective maintenance of capital goods considering demand dependency," European Journal of Operational Research, Elsevier, vol. 318(1), pages 71-86.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
- Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
- Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
- Alım, Muzaffer & Beullens, Patrick, 2022. "Improving inventory system performance by selective purchasing of buyers’ willingness to wait," European Journal of Operational Research, Elsevier, vol. 300(1), pages 124-136.
- Alexandar Angelus & Özalp Özer, 2016. "Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information," Operations Research, INFORMS, vol. 64(6), pages 1338-1371, December.
- Dursun, İpek & Grishina, Anastasiia & Akcay, Alp & van Houtum, Geert-Jan, 2024. "Spare parts recommendation for corrective maintenance of capital goods considering demand dependency," European Journal of Operational Research, Elsevier, vol. 318(1), pages 71-86.
- Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
- Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
- Rachel Q. Zhang, 1999. "Expected time delay in multi‐item inventory systems with correlated demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 671-688, September.
- Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
- Du, Bisheng & Larsen, Christian, 2017. "Reservation policies of advance orders in the presence of multiple demand classes," European Journal of Operational Research, Elsevier, vol. 256(2), pages 430-438.
- Oguzhan Vicil, 2021. "Optimizing stock levels for service-differentiated demand classes with inventory rationing and demand lead times," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 381-424, June.
- Bijvank, Marco & Koole, Ger & Vis, Iris F.A., 2010. "Optimising a general repair kit problem with a service constraint," European Journal of Operational Research, Elsevier, vol. 204(1), pages 76-85, July.
- Felix Papier & Ulrich W. Thonemann, 2010. "Capacity Rationing in Stochastic Rental Systems with Advance Demand Information," Operations Research, INFORMS, vol. 58(2), pages 274-288, April.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
- K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
- Liu, Ke & Li, Jing-An & Lai, Kin Keung, 2004. "Single period, single product newsvendor model with random supply shock," European Journal of Operational Research, Elsevier, vol. 158(3), pages 609-625, November.
- Fernando Bernstein & Gregory A. DeCroix & Yulan Wang, 2011. "The Impact of Demand Aggregation Through Delayed Component Allocation in an Assemble-to-Order System," Management Science, INFORMS, vol. 57(6), pages 1154-1171, June.
More about this item
Keywords
Inventory; Repair kit; Spare parts; Advance demand information;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:31:y:2023:i:1:d:10.1007_s10100-022-00809-1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.