A neural-network-based approach for estimating the cost of assembly systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Schikora, Paul F. & Godfrey, Michael R., 2003. "Efficacy of end-user neural network and data mining software for predicting complex system performance," International Journal of Production Economics, Elsevier, vol. 84(3), pages 231-253, June.
- Hanukov, Gabi, 2022. "A service system where junior servers approach a senior server on behalf of customers," International Journal of Production Economics, Elsevier, vol. 244(C).
- Junlong Peng & Jing Zhou & Fanyi Meng & Yan Yu, 2021. "Analysis on the hidden cost of prefabricated buildings based on FISM-BN," PLOS ONE, Public Library of Science, vol. 16(6), pages 1-20, June.
- Wang, Qing, 2007. "Artificial neural networks as cost engineering methods in a collaborative manufacturing environment," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 53-64, September.
- Cavalieri, Sergio & Maccarrone, Paolo & Pinto, Roberto, 2004. "Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry," International Journal of Production Economics, Elsevier, vol. 91(2), pages 165-177, September.
- Shtub, Avraham & Versano, Ronen, 1999. "Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis," International Journal of Production Economics, Elsevier, vol. 62(3), pages 201-207, September.
- Mengwei Ye & Junwu Wang & Xiang Si & Shiman Zhao & Qiyun Huang, 2022. "Analysis on Dynamic Evolution of the Cost Risk of Prefabricated Building Based on DBN," Sustainability, MDPI, vol. 14(3), pages 1-19, February.
- Caputo, Antonio C. & Pelagagge, Pacifico M., 2008. "Parametric and neural methods for cost estimation of process vessels," International Journal of Production Economics, Elsevier, vol. 112(2), pages 934-954, April.
- H'mida, Fehmi & Martin, Patrick & Vernadat, Francois, 2006. "Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering," International Journal of Production Economics, Elsevier, vol. 103(1), pages 17-35, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:32:y:1993:i:2:p:189-207. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.