An optimal batch size for a production system operating under a just-in-time delivery system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
- Cao, Qing & Schniederjans, Marc J., 2004. "A revised EMQ/JIT production-run model: An examination of inventory and production costs," International Journal of Production Economics, Elsevier, vol. 87(1), pages 83-95, January.
- Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
- Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
- Kelle, Peter & Transchel, Sandra & Minner, Stefan, 2009. "Buyer-supplier cooperation and negotiation support with random yield consideration," International Journal of Production Economics, Elsevier, vol. 118(1), pages 152-159, March.
- Sarker, Bhaba R. & Balan, Chidambaram V., 1999. "Operations planning for a multi-stage kanban system," European Journal of Operational Research, Elsevier, vol. 112(2), pages 284-303, January.
- Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo, 2001. "Note on: "An optimal batch size for a production system operating under a just-in-time delivery system"," International Journal of Production Economics, Elsevier, vol. 72(1), pages 99-99, June.
- Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
- Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
- Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
- Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:32:y:1993:i:2:p:255-260. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.