IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v33y1994i1-3p97-107.html
   My bibliography  Save this article

Quality control through lot sizing for items sold with warranty

Author

Listed:
  • Djamaludin, I.
  • Murthy, D. N. P.
  • Wilson, R. J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Djamaludin, I. & Murthy, D. N. P. & Wilson, R. J., 1994. "Quality control through lot sizing for items sold with warranty," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 97-107, January.
  • Handle: RePEc:eee:proeco:v:33:y:1994:i:1-3:p:97-107
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(94)90123-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Marlin U. Thomas & Sridevi S. Rao, 1999. "Warranty Economic Decision Models: A Summary and Some Suggested Directions for Future Research," Operations Research, INFORMS, vol. 47(6), pages 807-820, December.
    2. Wang, Chih-Hsiung, 2007. "Economic off-line quality control strategy with two types of inspection errors," European Journal of Operational Research, Elsevier, vol. 179(1), pages 132-147, May.
    3. Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
    4. Chen, Hsi-Mei & Huang, Cheng-Hung, 2001. "A system identification problem of estimating parameters in the profit analysis model for a product," International Journal of Production Economics, Elsevier, vol. 72(1), pages 15-26, June.
    5. Lee, Hsu-Hua, 2008. "The investment model in preventive maintenance in multi-level production systems," International Journal of Production Economics, Elsevier, vol. 112(2), pages 816-828, April.
    6. K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
    7. Izzet Sahin & Hakan Polatoglu, 1995. "Distributions of manufacturer's and user's replacement costs under warranty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1233-1250, December.
    8. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    9. Wang, Chih-Hsiung, 2009. "Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 197(1), pages 126-133, August.
    10. B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
    11. Yeh, Ruey Huei & Chen, Tzu-Hui, 2006. "Optimal lot size and inspection policy for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 174(2), pages 766-776, October.
    12. Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
    13. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    14. Murthy, D. N. P. & Djamaludin, I., 2002. "New product warranty: A literature review," International Journal of Production Economics, Elsevier, vol. 79(3), pages 231-260, October.
    15. Jiang, R. & Murthy, D.N.P., 2009. "Impact of quality variations on product reliability," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 490-496.
    16. Wei Huang & Vidyadhar Kulkarni & Jayashankar M. Swaminathan, 2008. "Managing the Inventory of an Item with a Replacement Warranty," Management Science, INFORMS, vol. 54(8), pages 1441-1452, August.
    17. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
    18. Çerağ Pinçe & Mark Ferguson & Beril Toktay, 2016. "Extracting Maximum Value from Consumer Returns: Allocating Between Remarketing and Refurbishing for Warranty Claims," Manufacturing & Service Operations Management, INFORMS, vol. 18(4), pages 475-492, October.
    19. Murthy, D. N. P. & Ravi Kumar, K., 2000. "Total product quality," International Journal of Production Economics, Elsevier, vol. 67(3), pages 253-267, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:33:y:1994:i:1-3:p:97-107. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.