IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v40y1992i3p521-532.html
   My bibliography  Save this item

Push and Pull Production Systems: Issues and Comparisons

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
  2. Park, Chan-Woo & Lee, Hyo-Seong, 2013. "Performance evaluation of a multi-product CONWIP assembly system with correlated external demands," International Journal of Production Economics, Elsevier, vol. 144(1), pages 334-344.
  3. Xiaobo, Zhao & Zhou, Zhaoying, 1999. "A semi-open decomposition approach for an open queueing network in a general configuration with a kanban blocking mechanism," International Journal of Production Economics, Elsevier, vol. 60(1), pages 375-380, April.
  4. Nha-Nghi Cruz & Hans Daduna, 2019. "Optimal capacity allocation in a production–inventory system with base stock," Annals of Operations Research, Springer, vol. 277(2), pages 329-344, June.
  5. Lauren Xiaoyuan Lu & Jan A. Van Mieghem & R. Canan Savaskan, 2009. "Incentives for Quality Through Endogenous Routing," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 254-273, July.
  6. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
  7. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
  8. Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
  9. Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
  10. Fernandes, Nuno Octavio & do Carmo-Silva, Silvio, 2006. "Generic POLCA--A production and materials flow control mechanism for quick response manufacturing," International Journal of Production Economics, Elsevier, vol. 104(1), pages 74-84, November.
  11. Tappia, Elena & Roy, Debjit & Melacini, Marco & De Koster, René, 2019. "Integrated storage-order picking systems: Technology, performance models, and design insights," European Journal of Operational Research, Elsevier, vol. 274(3), pages 947-965.
  12. Kumar Satyam & Ananth Krishnamurthy, 2013. "Performance analysis of CONWIP systems with batch size constraints," Annals of Operations Research, Springer, vol. 209(1), pages 85-114, October.
  13. Onyeocha, Chukwunonyelum Emmanuel & Wang, Jiayi & Khoury, Joseph & Geraghty, John, 2015. "A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system," Operations Research Perspectives, Elsevier, vol. 2(C), pages 137-149.
  14. Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
  15. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
  16. Wanzhu Wang & Qazi Salman Khalid & Muhammad Abas & Hao Li & Shakir Azim & Abdur Rehman Babar & Waqas Saleem & Razaullah Khan, 2021. "Implementation of POLCA Integrated QRM Framework for Optimized Production Performance—A Case Study," Sustainability, MDPI, vol. 13(6), pages 1-22, March.
  17. João Dias-Ferreira & Luis Ribeiro & Hakan Akillioglu & Pedro Neves & Mauro Onori, 2018. "BIOSOARM: a bio-inspired self-organising architecture for manufacturing cyber-physical shopfloors," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1659-1682, October.
  18. Sergei P. Kazakov, 2016. "Market Orientation and Company Performance: A Russian Service Industry Perspective," HSE Working papers WP BRP 51/MAN/2016, National Research University Higher School of Economics.
  19. Yang, Taho & Fu, Hsin-Pin & Yang, Kuang-Yi, 2007. "An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy--A case study," International Journal of Production Economics, Elsevier, vol. 107(1), pages 104-114, May.
  20. Jérémie Gallien & Théophane Weber, 2010. "To Wave or Not to Wave? Order Release Policies for Warehouses with an Automated Sorter," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 642-662, September.
  21. Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
  22. Plaza, Malgorzata & David, Iulian & Shirazi, Farid, 2018. "Management of inventory under market fluctuations the case of a Canadian high tech company," International Journal of Production Economics, Elsevier, vol. 205(C), pages 215-227.
  23. Othmane Benmoussa, 2022. "Improving Replenishment Flows Using Simulation Results: A Case Study," Logistics, MDPI, vol. 6(2), pages 1-26, May.
  24. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
  25. Segerstedt, Anders, 1995. "Cover-Time Planning, a method for calculation of material requirements," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 355-368, October.
  26. Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
  27. Wallace J. Hopp & Seyed M.R. Iravani & Biying Shou & Robert Lien, 2009. "Design and control of agile automated CONWIP production lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 42-56, February.
  28. Johansen, Soren Glud, 1996. "Transfer pricing of a service department facing random demand," International Journal of Production Economics, Elsevier, vol. 46(1), pages 351-358, December.
  29. John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
  30. Sameer Prasad & Jason Woldt & Harish Borra & Nezih Altay, 2022. "Migrant supply chain networks: an empirically based typology," Annals of Operations Research, Springer, vol. 319(1), pages 1331-1358, December.
  31. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
  32. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
  33. Xiaobo, Zhao & Xu, Deju & Zhang, Hanqin & He, Qi-Ming, 2007. "Modeling and analysis of a supply-assembly-store chain," European Journal of Operational Research, Elsevier, vol. 176(1), pages 275-294, January.
  34. Li, Hui & Liu, Liming, 2006. "Production control in a two-stage system," European Journal of Operational Research, Elsevier, vol. 174(2), pages 887-904, October.
  35. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
  36. Lin, Yu-Hsin & Lee, Ching-En, 2001. "A total standard WIP estimation method for wafer fabrication," European Journal of Operational Research, Elsevier, vol. 131(1), pages 78-94, May.
  37. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
  38. Fredendall, Lawrence D. & Ojha, Divesh & Wayne Patterson, J., 2010. "Concerning the theory of workload control," European Journal of Operational Research, Elsevier, vol. 201(1), pages 99-111, February.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.