An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy--A case study
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Takahashi, Katsuhiko & Myreshka & Hirotani, Daisuke, 2005. "Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains," International Journal of Production Economics, Elsevier, vol. 93(1), pages 25-40, January.
- Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
- Geraghty, John & Heavey, Cathal, 2004. "A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies," International Journal of Production Economics, Elsevier, vol. 91(1), pages 75-90, September.
- Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
- T Yang & L Tseng, 2002. "Solving a multi-objective simulation model using a hybrid response surface method and lexicographical goal programming approach—a case study on integrated circuit ink-marking machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(2), pages 211-221, February.
- E G A Gaury & J P C Kleijnen & H Pierreval, 2001. "A methodology to customize pull control systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(7), pages 789-799, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Pourvaziri, Hani & Pierreval, Henri, 2017. "Dynamic facility layout problem based on open queuing network theory," European Journal of Operational Research, Elsevier, vol. 259(2), pages 538-553.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Park, Chan-Woo & Lee, Hyo-Seong, 2013. "Performance evaluation of a multi-product CONWIP assembly system with correlated external demands," International Journal of Production Economics, Elsevier, vol. 144(1), pages 334-344.
- Onyeocha, Chukwunonyelum Emmanuel & Wang, Jiayi & Khoury, Joseph & Geraghty, John, 2015. "A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system," Operations Research Perspectives, Elsevier, vol. 2(C), pages 137-149.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
- Pettersen, Jan-Arne & Segerstedt, Anders, 2009. "Restricted work-in-process: A study of differences between Kanban and CONWIP," International Journal of Production Economics, Elsevier, vol. 118(1), pages 199-207, March.
- Othmane Benmoussa, 2022. "Improving Replenishment Flows Using Simulation Results: A Case Study," Logistics, MDPI, vol. 6(2), pages 1-26, May.
- Gosavi, Abhijit & Gosavi, Aparna A., 2024. "CONWIP control in the digitized world: The case of the cyber-physical jobshop," International Journal of Production Economics, Elsevier, vol. 270(C).
- Plaza, Malgorzata & David, Iulian & Shirazi, Farid, 2018. "Management of inventory under market fluctuations the case of a Canadian high tech company," International Journal of Production Economics, Elsevier, vol. 205(C), pages 215-227.
- Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
- Jung, Jung Woo & Lee, Young Hae, 2010. "Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 433-447, April.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Yang, Taho & Chou, Pohung, 2005. "Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 68(1), pages 9-21.
- Kumar Satyam & Ananth Krishnamurthy, 2013. "Performance analysis of CONWIP systems with batch size constraints," Annals of Operations Research, Springer, vol. 209(1), pages 85-114, October.
- Patrick Dallasega & Erwin Rauch, 2017. "Sustainable Construction Supply Chains through Synchronized Production Planning and Control in Engineer-to-Order Enterprises," Sustainability, MDPI, vol. 9(10), pages 1-25, October.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Lauren Xiaoyuan Lu & Jan A. Van Mieghem & R. Canan Savaskan, 2009. "Incentives for Quality Through Endogenous Routing," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 254-273, July.
- Wanzhu Wang & Qazi Salman Khalid & Muhammad Abas & Hao Li & Shakir Azim & Abdur Rehman Babar & Waqas Saleem & Razaullah Khan, 2021. "Implementation of POLCA Integrated QRM Framework for Optimized Production Performance—A Case Study," Sustainability, MDPI, vol. 13(6), pages 1-22, March.
- Sang M. Lee & David L. Olson & Sang-Heui Lee & Taewon Hwang & Matt S. Shin, 2007. "Entrepreneurial applications of the lean approach to service industries," The Service Industries Journal, Taylor & Francis Journals, vol. 28(7), pages 973-987, November.
- Johansen, Soren Glud, 1996. "Transfer pricing of a service department facing random demand," International Journal of Production Economics, Elsevier, vol. 46(1), pages 351-358, December.
- Lin, Yu-Hsin & Lee, Ching-En, 2001. "A total standard WIP estimation method for wafer fabrication," European Journal of Operational Research, Elsevier, vol. 131(1), pages 78-94, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:107:y:2007:i:1:p:104-114. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.