Production control in a two-stage system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Fleischmann, Bernhard, 1994. "The discrete lot-sizing and scheduling problem with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 75(2), pages 395-404, June.
- Philippe B. Chevalier & Lawrence M. Wein, 1993. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Closed Network," Operations Research, INFORMS, vol. 41(4), pages 743-758, August.
- Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
- Lawrence M. Wein, 1992. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs," Operations Research, INFORMS, vol. 40(3-supplem), pages 312-334, June.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Izak Duenyas, 1994. "A Simple Release Policy for Networks of Queues with Controllable Inputs," Operations Research, INFORMS, vol. 42(6), pages 1162-1171, December.
- Lawrence M. Wein, 1990. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs," Operations Research, INFORMS, vol. 38(6), pages 1065-1078, December.
- Mark L. Spearman, 1991. "An Analytic Congestion Model for Closed Production Systems with IFR Processing Times," Management Science, INFORMS, vol. 37(8), pages 1015-1029, August.
- Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
- Kim, Eungab, 2012. "Centralized admission and production control in a two-stage supply chain with single component and customized products," International Journal of Production Economics, Elsevier, vol. 140(1), pages 530-540.
- Ahadi, Amir & Kang, Sang-Kyun & Lee, Jang-Ho, 2016. "A novel approach for optimal combinations of wind, PV, and energy storage system in diesel-free isolated communities," Applied Energy, Elsevier, vol. 170(C), pages 101-115.
- Hsing-Ming Chang & James C. Fu, 2022. "On Distribution and Average Run Length of a Two-Stage Control Process," Methodology and Computing in Applied Probability, Springer, vol. 24(4), pages 2723-2742, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wendell G. Gilland, 2001. "Effective Sequencing Rules for Closed Manufacturing Networks," Operations Research, INFORMS, vol. 49(5), pages 759-770, October.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Carsten Jordan & Andreas Drexl, 1998. "Discrete Lotsizing and Scheduling by Batch Sequencing," Management Science, INFORMS, vol. 44(5), pages 698-713, May.
- Barış Ata, 2006. "Dynamic Control of a Multiclass Queue with Thin Arrival Streams," Operations Research, INFORMS, vol. 54(5), pages 876-892, October.
- Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
- Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
- Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
- Jordan, Carsten & Drexl, Andreas, 1997. "Discrete lotsizing and scheduling by batch sequencing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 438, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Boonmee, Atiwat & Sethanan, Kanchana, 2016. "A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry," European Journal of Operational Research, Elsevier, vol. 250(2), pages 652-665.
- Sanja Petrovic & Carole Fayad & Dobrila Petrovic & Edmund Burke & Graham Kendall, 2008. "Fuzzy job shop scheduling with lot-sizing," Annals of Operations Research, Springer, vol. 159(1), pages 275-292, March.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- Fink, Jiří & Hurink, Johann L., 2015. "Minimizing costs is easier than minimizing peaks when supplying the heat demand of a group of houses," European Journal of Operational Research, Elsevier, vol. 242(2), pages 644-650.
- van Norden, Linda & van de Velde, Steef, 2005. "Multi-product lot-sizing with a transportation capacity reservation contract," European Journal of Operational Research, Elsevier, vol. 165(1), pages 127-138, August.
- Almeder, Christian & Klabjan, Diego & Traxler, Renate & Almada-Lobo, Bernardo, 2015. "Lead time considerations for the multi-level capacitated lot-sizing problem," European Journal of Operational Research, Elsevier, vol. 241(3), pages 727-738.
- Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
- Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.
- Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:174:y:2006:i:2:p:887-904. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.