IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v287y2020i1p119-132.html
   My bibliography  Save this article

Push verse pull: Inventory-leadtime tradeoff for managing system variability

Author

Listed:
  • Liu, Liming
  • Xu, He
  • Zhu, Stuart X.

Abstract

We study a two-stage push–pull system in an assemble-to-order manufacturing environment. Modelling the system as an inventory-queue model, we construct a decision model to determine the optimal stock level of the semifinished base product and the optimal leadtime of the finished products that will minimize the total operational cost. We analytically characterize the structure of the optimal policy. For systems with moderate demand and upstream processing time variabilities, there exists a threshold determined purely by the tradeoff of operational costs so that when the upstream utilization is above the threshold, the push–pull strategy is optimal; otherwise the pure-pull strategy is optimal. When the inter-arrival time or the upstream service time follows a general probability distribution, the optimal policy depends on the demand or process variability at the upstream stage. Our results can be used to guide managers in selecting the right inventory and leadtime strategy to cope with system variability. We find that in comparison of the downstream variability, under some mild condition, the upstream variability has a more significant impact on the choice of the optimal policy, the corresponding inventory, and lead time. Further, the guaranteed/constant downstream processing time does not always benefit the supply chain performance.

Suggested Citation

  • Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
  • Handle: RePEc:eee:ejores:v:287:y:2020:i:1:p:119-132
    DOI: 10.1016/j.ejor.2020.04.033
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221720303842
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2020.04.033?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
    2. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    3. Feng Cheng & Markus Ettl & Grace Lin & David D. Yao, 2002. "Inventory-Service Optimization in Configure-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 4(2), pages 114-132, December.
    4. Chee-Chong Teo & Rohit Bhatnagar & Stephen Graves, 2011. "Setting planned lead times for a make-to-order production system with master schedule smoothing," IISE Transactions, Taylor & Francis Journals, vol. 43(6), pages 399-414.
    5. Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
    6. Yong-Joo Lee & Paul Zipkin, 1992. "Tandem Queues with Planned Inventories," Operations Research, INFORMS, vol. 40(5), pages 936-947, October.
    7. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
    8. Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
    9. Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
    10. Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
    11. Ayd{i}n Alptekinou{g}lu & Charles J. Corbett, 2010. "Leadtime-Variety Tradeoff in Product Differentiation," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 569-582, January.
    12. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    13. Feng Cheng* & Markus Ettl & Yingdong Lu & David D. Yao, 2012. "A Production–Inventory Model for a Push–Pull Manufacturing System with Capacity and Service Level Constraints," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 668-681, July.
    14. Olhager, Jan & Ostlund, Bjorn, 1990. "An integrated push-pull manufacturing strategy," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 135-142, April.
    15. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bo Li & Antonio Arreola‐Risa, 2022. "Minimizing conditional value‐at‐risk under a modified basestock policy," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1822-1838, April.
    2. Dieter Fiems & Eline De Cuypere & Koen De Turck & Dieter Claeys, 2020. "Performance Analysis of Hybrid MTS/MTO Systems with Stochastic Demand and Production," Mathematics, MDPI, vol. 8(11), pages 1-16, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jie Chu & Kai Huang, 2020. "Integrating decisions with advance supply information in an assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(1), pages 34-44, February.
    2. Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
    3. Jing-Sheng Song & Yue Zhang, 2020. "Stock or Print? Impact of 3-D Printing on Spare Parts Logistics," Management Science, INFORMS, vol. 66(9), pages 3860-3878, September.
    4. Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
    5. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    6. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    7. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    8. Gunasekaran, Angappa & Ngai, Eric W.T., 2009. "Modeling and analysis of build-to-order supply chains," European Journal of Operational Research, Elsevier, vol. 195(2), pages 319-334, June.
    9. L. Jeff Hong & Barry L. Nelson, 2006. "Discrete Optimization via Simulation Using COMPASS," Operations Research, INFORMS, vol. 54(1), pages 115-129, February.
    10. Slama, Ilhem & Ben-Ammar, Oussama & Thevenin, Simon & Dolgui, Alexandre & Masmoudi, Faouzi, 2022. "Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1183-1198.
    11. Quetschlich, Mathias & Moetz, André & Otto, Boris, 2021. "Optimisation model for multi-item multi-echelon supply chains with nested multi-level products," European Journal of Operational Research, Elsevier, vol. 290(1), pages 144-158.
    12. Yingdong Lu, 2007. "Estimation of average backorders for an assemble‐to‐order system with random batch demands through extreme statistics," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 33-45, February.
    13. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
    14. Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
    15. Susan H. Xu & Zhaolin Li, 2007. "Managing a Single-Product Assemble-to-Order System with Technology Innovations," Management Science, INFORMS, vol. 53(9), pages 1467-1485, September.
    16. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Other publications TiSEM ac7da569-7495-4fc4-a4e1-0, Tilburg University, School of Economics and Management.
    17. Anand Paul & Asoo J. Vakharia, 2006. "Requirements planning for modular products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(5), pages 418-431, August.
    18. Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
    19. Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
    20. Erica L. Plambeck & Amy R. Ward, 2006. "Optimal Control of a High-Volume Assemble-to-Order System," Mathematics of Operations Research, INFORMS, vol. 31(3), pages 453-477, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:287:y:2020:i:1:p:119-132. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.