IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v34y1986i2p311-319.html
   My bibliography  Save this item

VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
  2. Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
  3. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
  4. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
  5. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
  6. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
  7. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
  8. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
  9. Berling, Peter & Farvid, Mojtaba, 2014. "Lead-time investigation and estimation in divergent supply chains," International Journal of Production Economics, Elsevier, vol. 157(C), pages 177-189.
  10. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
  11. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
  12. Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
  13. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
  14. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
  15. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
  16. Sheng, Jingyu & Prescott, Darren, 2019. "Using a novel hierarchical coloured Petri net to model and optimise fleet spare inventory, cannibalisation and preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
  17. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
  18. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
  19. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
  20. Huaxiao Shen & Tian Tian & Han Zhu, 2019. "A Two-Echelon Inventory System with a Minimum Order Quantity Requirement," Sustainability, MDPI, vol. 11(18), pages 1-22, September.
  21. Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
  22. Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
  23. Sheikh-Zadeh, Alireza & Rossetti, Manuel D., 2020. "Classification methods for problem size reduction in spare part provisioning," International Journal of Production Economics, Elsevier, vol. 219(C), pages 99-114.
  24. Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
  25. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
  26. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
  27. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
  28. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
  29. Amin Yazdekhasti & Yahia Zare Mehrjardi, 2020. "Two-echelon three-indenture warranty distribution network: a hybrid branch and bound, Monte-Carlo approach," Operational Research, Springer, vol. 20(2), pages 1113-1158, June.
  30. Yoon, Kyung Bok & Sohn, So Young, 2007. "Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1076-1085, August.
  31. Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
  32. D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
  33. Seongmin Moon & Ui Jun Kim, 2017. "The Development of a Concurrent Spare-Parts Optimization Model for Weapon Systems in the South Korean Military Forces," Interfaces, INFORMS, vol. 47(2), pages 122-136, April.
  34. Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
  35. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
  36. Joo, Seong-Jong, 2009. "Scheduling preventive maintenance for modular designed components: A dynamic approach," European Journal of Operational Research, Elsevier, vol. 192(2), pages 512-520, January.
  37. Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.