IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v157y2014icp177-189.html
   My bibliography  Save this article

Lead-time investigation and estimation in divergent supply chains

Author

Listed:
  • Berling, Peter
  • Farvid, Mojtaba

Abstract

This paper investigates the delay experienced by retailers in a distribution system due to shortages at the central warehouse. Simple formulae are developed to estimate the mean and variance of this delay. The formulae are based on replacing the stochastic lead-time demand with a stochastic demand rate, and they differ in how this demand rate is estimated. An extensive numerical study shows improved accuracy compared to existing methods with similar computational complexity. The numerical study also shows that the batch quantities and the service level have a large influence on the delay. Both the mean and variance of a retailer’s delay decrease with the service level and increase with the batch quantities used at the warehouse and at the retailer. No other variables seem to have a significant impact on the delay.

Suggested Citation

  • Berling, Peter & Farvid, Mojtaba, 2014. "Lead-time investigation and estimation in divergent supply chains," International Journal of Production Economics, Elsevier, vol. 157(C), pages 177-189.
  • Handle: RePEc:eee:proeco:v:157:y:2014:i:c:p:177-189
    DOI: 10.1016/j.ijpe.2014.04.030
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731400156X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.04.030?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kiesmuller, G.P. & de Kok, A.G., 2006. "The customer waiting time in an (R, s, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 104(2), pages 354-364, December.
    2. Antony Svoronos & Paul Zipkin, 1988. "Estimating the Performance of Multi-Level Inventory Systems," Operations Research, INFORMS, vol. 36(1), pages 57-72, February.
    3. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    4. W. Karl Kruse, 1980. "Waiting Time in an S − 1, S Inventory System with Arbitrarily Distributed Lead Times," Operations Research, INFORMS, vol. 28(2), pages 348-352, April.
    5. Monthatipkul, Chumpol & Yenradee, Pisal, 2008. "Inventory/distribution control system in a one-warehouse/multi-retailer supply chain," International Journal of Production Economics, Elsevier, vol. 114(1), pages 119-133, July.
    6. Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
    7. Andersson, Jonas & Marklund, Johan, 2000. "Decentralized inventory control in a two-level distribution system," European Journal of Operational Research, Elsevier, vol. 127(3), pages 483-506, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Hill, R.M. & Seifbarghy, M. & Smith, D.K., 2007. "A two-echelon inventory model with lost sales," European Journal of Operational Research, Elsevier, vol. 181(2), pages 753-766, September.
    3. Kull, Thomas & Closs, David, 2008. "The risk of second-tier supplier failures in serial supply chains: Implications for order policies and distributor autonomy," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1158-1174, May.
    4. Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
    5. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.
    6. Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
    7. Berling, Peter & Marklund, Johan, 2013. "A model for heuristic coordination of real life distribution inventory systems with lumpy demand," European Journal of Operational Research, Elsevier, vol. 230(3), pages 515-526.
    8. Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
    9. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    10. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    11. Geng, Wei & Qiu, Minmin & Zhao, Xiaobo, 2010. "An inventory system with single distributor and multiple retailers: Operating scenarios and performance comparison," International Journal of Production Economics, Elsevier, vol. 128(1), pages 434-444, November.
    12. Fangruo Chen & Rungson Samroengraja, 2004. "Order Volatility and Supply Chain Costs," Operations Research, INFORMS, vol. 52(5), pages 707-722, October.
    13. Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
    14. Yoon, Kyung Bok & Sohn, So Young, 2007. "Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1076-1085, August.
    15. Olsson, Ralph J. & Hill, Roger M., 2007. "A two-echelon base-stock inventory model with Poisson demand and the sequential processing of orders at the upper echelon," European Journal of Operational Research, Elsevier, vol. 177(1), pages 310-324, February.
    16. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
    17. Fangruo Chen & Rungson Samroengraja, 2000. "A Staggered Ordering Policy for One-Warehouse, Multiretailer Systems," Operations Research, INFORMS, vol. 48(2), pages 281-293, April.
    18. Pastore, Erica & Alfieri, Arianna & Zotteri, Giulio, 2019. "An empirical investigation on the antecedents of the bullwhip effect: Evidence from the spare parts industry," International Journal of Production Economics, Elsevier, vol. 209(C), pages 121-133.
    19. Ewerhart, Christian & Cassola, Nuno & Valla, Natacha, 2012. "Overbidding in fixed rate tenders: The role of exposure risk," Journal of Banking & Finance, Elsevier, vol. 36(2), pages 539-549.
    20. Towill, Denis R. & Zhou, Li & Disney, Stephen M., 2007. "Reducing the bullwhip effect: Looking through the appropriate lens," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 444-453, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:157:y:2014:i:c:p:177-189. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.