IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v10y2018i1p1747-1760n9.html
   My bibliography  Save this article

Identification and evaluation of criteria for selecting contractors using a risk management approach

Author

Listed:
  • Mousakhani Ehsan

    (School of Building Science,AuburnUniversity, AL, USA)

  • Ranjbar Shirzad

    (Department of Civil Engineering, Amirkabir University of Technology,Tehran, Iran)

  • Ashoori Taha

    (Department of Civil Engineering, University of Texas atArlington, TX, USA)

Abstract

Transferring all or some parts of the engineering activities or supply of goods to third persons or companies is one of the adopted methods that transfer a significant part of the likely risks to the concerned side. Out­sourcing activities are followed by many benefits, such as reducing overhead and operational costs, increasing efficiency, reducing risk, and so on; however, if this is not done carefully, not only is no benefit gained, but also new risks are imposed on the organization. Considering that waste of time and cost diversions of projects stem from the selection of inappropriate contractors, risk assessment is important in outsourcing. Using a risk-oriented approach based on software toward outsourcing, the present study aims to identify and rate the factors affecting the selection of contractors and to finally provide a method to evaluate and select the proper way for the selection of contractors. This method is not just based on the lowest price, but it also includes several factors that influence the selection of contractors, which is achieved by applying the Expert Choice software. At first, the most important risk factors in the selection of contractors were identified according to the conducted research. Then, the factors that had the greatest risk potential for achieving the project goals were chosen from among them. The opinions of experts were obtained in the next phase to determine the importance of various factors in the process of contractor selection, which was achieved by the distribution of a questionnaire. Subsequently, the most important factors chosen by the experts were specified, and their relationship with the contractor’s risk management was found.

Suggested Citation

  • Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha, 2018. "Identification and evaluation of criteria for selecting contractors using a risk management approach," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1747-1760, July.
  • Handle: RePEc:vrs:otamic:v:10:y:2018:i:1:p:1747-1760:n:9
    DOI: 10.2478/otmcj-2018-0004
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2018-0004
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2018-0004?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Patrick Sik-Wah Fong & Sonia Kit-Yung Choi, 2000. "Final contractor selection using the analytical hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 547-557.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.
    2. Franco Cheung & Judy Leung Fung Kuen & Martin Skitmore, 2002. "Multi-criteria evaluation model for the selection of architectural consultants," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 569-580.
    3. K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
    4. Stéphanie Boulenger & Marcelin Joanis, 2015. "Analyse économique des marchés publics dans l’industrie de la construction au Québec," CIRANO Project Reports 2015rp-23, CIRANO.
    5. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    6. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    7. S Taghipour & D Banjevic & A K S Jardine, 2011. "Prioritization of medical equipment for maintenance decisions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1666-1687, September.
    8. Martin Ekstrom & Hans Bjornsson & Clifford Nass, 2003. "Accounting for rater credibility when evaluating AEC subcontractors," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 197-208.
    9. Junn-Yuan Teng & Wen-Chih Huang & Maw-Cherng Lin, 2010. "Systematic budget allocation for transportation construction projects: a case in Taiwan," Transportation, Springer, vol. 37(2), pages 331-361, March.
    10. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    11. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    12. Puying Li & Simon Huston, 2015. "International Competitiveness of ChinaÕs Construction Firms," ERES eres2015_67, European Real Estate Society (ERES).
    13. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.
    14. Ramesh Allipour Birgani & Amirhossein Takian & Abolghasem Djazayery & Ali Kianirad & Hamed Pouraram, 2022. "Climate Change and Food Security Prioritizing Indices: Applying Analytical Hierarchy Process (AHP) and Social Network Analysis (SNA)," Sustainability, MDPI, vol. 14(14), pages 1-17, July.
    15. Mimović Predrag & Krstić Ana, 2016. "Application of Multi-Criteria Analysis in the Public Procurement Process Optimization," Economic Themes, Sciendo, vol. 54(1), pages 103-128, March.
    16. Khoso, Ali Raza & Yusof, Aminah Md & Chen, Zhen-Song & Skibniewski, Mirosław J. & Chin, Kwai-Sang & Khahro, Shabir Hussain & Sohu, Samiullah, 2022. "Comprehensive analysis of state-of-the-art contractor selection models in construction environment-A critical review and future call," Socio-Economic Planning Sciences, Elsevier, vol. 79(C).
    17. Aziz Naghizadeh Vardin & Ramin Ansari & Mohammad Khalilzadeh & Jurgita Antucheviciene & Romualdas Bausys, 2021. "An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects," Sustainability, MDPI, vol. 13(12), pages 1-28, June.
    18. Ru Liang & Zhaohan Sheng & Xiangyu Wang, 2018. "Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects," Complexity, Hindawi, vol. 2018, pages 1-14, January.
    19. Murali Jagannathan & Venkata Santosh Kumar Delhi, 2020. "Perceptions of Stakeholders on the ‘Redraftability’ of Construction Contracts," IIM Kozhikode Society & Management Review, , vol. 9(2), pages 152-161, July.
    20. Sai-On Cheung & Henry Suen, 2002. "A multi-attribute utility model for dispute resolution strategy selection," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 557-568.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:10:y:2018:i:1:p:1747-1760:n:9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.