Using the principal component analysis method as a tool in contractor pre-qualification

Author

Listed:
  • K. C. Lam
  • T. S. Hu
  • S. T. Ng

Abstract

Contractor pre-qualification can be regarded as a complicated, two-group, non-linear classification problem. It involves a variety of subjective and uncertain information extracted from various parties such as contractors, pre-qualifiers and project teams. Non-linearity, uncertainty and subjectivity are the three predominant characteristics of the contractor pre-qualification process. This makes the process more of an art than a scientific evaluation. In addition to non-linearity, uncertainty and subjectivity, contractor pre-qualification is further complicated by the large number of contractor pre-qualification criteria (CPC) used in current practice and the multicollinearity existing between contractor attributes. An alternative empirical method using principal component analysis (PCA) is proposed for contractor pre-qualification in this study. The proposed method may alleviate the existing amount of multicollinearity and largely reduce the dimensionality of the pre-qualification data set. The applicability and potential of PCA for contractor pre-qualification has been examined by way of two data sets: (1) 73 pre-qualification cases (37 qualified and 36 disqualified) collected in England and (2) 85 (45 qualified and 40 disqualified) pre-qualification cases relating to 10 public sector projects in Hong Kong. The PCA-based results demonstrated that strong and positive inter-correlations existed between most of the qualifying variables, with the minimum correlation coefficient being 0.121 and the maximum being 0.899, and that qualified and disqualified contractors could be satisfactorily separated.

Suggested Citation

  • K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
  • Handle: RePEc:taf:conmgt:v:23:y:2005:i:7:p:673-684
    DOI: 10.1080/01446190500041263
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190500041263
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190500041263?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Patrick Sik-Wah Fong & Sonia Kit-Yung Choi, 2000. "Final contractor selection using the analytical hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 547-557.
    2. Zedan Hatush & Martin Skitmore, 1997. "Evaluating contractor prequalification data: selection criteria and project success factors," Construction Management and Economics, Taylor & Francis Journals, vol. 15(2), pages 129-147.
    3. K. C. Lam & Tiesong Hu & S. Thomas Ng & Martin Skitmore & S. O. Cheung, 2001. "A fuzzy neural network approach for contractor prequalification," Construction Management and Economics, Taylor & Francis Journals, vol. 19(2), pages 175-188.
    4. Zedan Hatush & Martin Skitmore, 1997. "Assessment and evaluation of contractor data against client goals using PERT approach," Construction Management and Economics, Taylor & Francis Journals, vol. 15(4), pages 327-340.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Aziz Naghizadeh Vardin & Ramin Ansari & Mohammad Khalilzadeh & Jurgita Antucheviciene & Romualdas Bausys, 2021. "An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects," Sustainability, MDPI, vol. 13(12), pages 1-28, June.
    2. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    3. Mimović Predrag & Krstić Ana, 2016. "Application of Multi-Criteria Analysis in the Public Procurement Process Optimization," Economic Themes, Sciendo, vol. 54(1), pages 103-128, March.
    4. Andove Wilson Mwangu & Mike Amuhaya Iravo, 2015. "How Monitoring and Evaluation Affects the Outcome of Constituency Development Fund Projects in Kenya: A Case Study of Projects in Gatanga Constituency," International Journal of Academic Research in Business and Social Sciences, Human Resource Management Academic Research Society, International Journal of Academic Research in Business and Social Sciences, vol. 5(3), pages 13-31, March.
    5. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.
    6. Franco Cheung & Judy Leung Fung Kuen & Martin Skitmore, 2002. "Multi-criteria evaluation model for the selection of architectural consultants," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 569-580.
    7. Stéphanie Boulenger & Marcelin Joanis, 2015. "Analyse économique des marchés publics dans l’industrie de la construction au Québec," CIRANO Project Reports 2015rp-23, CIRANO.
    8. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    9. Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha, 2018. "Identification and evaluation of criteria for selecting contractors using a risk management approach," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1747-1760, July.
    10. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    11. Deep Shumank & Simon Laura & Asim Mohd & Rahimzadeh Ali & Al-Hamdani Sulala, 2018. "An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1794-1802, October.
    12. Dariusz Masłowski & Kinga Kijewska & Ewa Kulińska, 2021. "Management of Municipal Public Transport Vehicle Journeys by Using the PERT Method," Energies, MDPI, vol. 14(15), pages 1-18, July.
    13. S Taghipour & D Banjevic & A K S Jardine, 2011. "Prioritization of medical equipment for maintenance decisions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1666-1687, September.
    14. Martin Ekstrom & Hans Bjornsson & Clifford Nass, 2003. "Accounting for rater credibility when evaluating AEC subcontractors," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 197-208.
    15. Junn-Yuan Teng & Wen-Chih Huang & Maw-Cherng Lin, 2010. "Systematic budget allocation for transportation construction projects: a case in Taiwan," Transportation, Springer, vol. 37(2), pages 331-361, March.
    16. Cheaitou, Ali & Larbi, Rim & Al Housani, Bashayer, 2019. "Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations," Socio-Economic Planning Sciences, Elsevier, vol. 68(C).
    17. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    18. Puying Li & Simon Huston, 2015. "International Competitiveness of ChinaÕs Construction Firms," ERES eres2015_67, European Real Estate Society (ERES).
    19. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.
    20. Ramesh Allipour Birgani & Amirhossein Takian & Abolghasem Djazayery & Ali Kianirad & Hamed Pouraram, 2022. "Climate Change and Food Security Prioritizing Indices: Applying Analytical Hierarchy Process (AHP) and Social Network Analysis (SNA)," Sustainability, MDPI, vol. 14(14), pages 1-17, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:23:y:2005:i:7:p:673-684. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.