IDEAS home Printed from https://ideas.repec.org/a/hin/complx/8705134.html
   My bibliography  Save this article

Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

Author

Listed:
  • Ru Liang
  • Zhaohan Sheng
  • Xiangyu Wang

Abstract

The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB) project in China is used to demonstrate how to apply these two methods and their advantages.

Suggested Citation

  • Ru Liang & Zhaohan Sheng & Xiangyu Wang, 2018. "Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects," Complexity, Hindawi, vol. 2018, pages 1-14, January.
  • Handle: RePEc:hin:complx:8705134
    DOI: 10.1155/2018/8705134
    as

    Download full text from publisher

    File URL: http://downloads.hindawi.com/journals/8503/2018/8705134.pdf
    Download Restriction: no

    File URL: http://downloads.hindawi.com/journals/8503/2018/8705134.xml
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2018/8705134?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Yongcheng Fu & Yongqiang Chen & Shuibo Zhang & Wenqian Wang, 2015. "Promoting cooperation in construction projects: an integrated approach of contractual incentive and trust," Construction Management and Economics, Taylor & Francis Journals, vol. 33(8), pages 653-670, August.
    2. Patrick Sik-Wah Fong & Sonia Kit-Yung Choi, 2000. "Final contractor selection using the analytical hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 547-557.
    3. Wu Gao & Kairong Hong, 2017. "The Portfolio Balanced Risk Index Model and Analysis of Examples of Large-Scale Infrastructure Project," Complexity, Hindawi, vol. 2017, pages 1-13, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.
    2. Franco Cheung & Judy Leung Fung Kuen & Martin Skitmore, 2002. "Multi-criteria evaluation model for the selection of architectural consultants," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 569-580.
    3. K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
    4. Stéphanie Boulenger & Marcelin Joanis, 2015. "Analyse économique des marchés publics dans l’industrie de la construction au Québec," CIRANO Project Reports 2015rp-23, CIRANO.
    5. Long Li & Zhongfu Li & Lei Jiang & Guangdong Wu & Daojin Cheng, 2018. "Enhanced Cooperation among Stakeholders in PPP Mega-Infrastructure Projects: A China Study," Sustainability, MDPI, vol. 10(8), pages 1-16, August.
    6. van der Valk, Wendy & Lumineau, Fabrice & Wang, Wenqian, 2019. "Research on contracting in supply chain management and related disciplines: A synthesis of scholarly recommendations and a discussion of future opportunities," Other publications TiSEM 55901a88-7fc5-4808-a47a-e, Tilburg University, School of Economics and Management.
    7. Guangdong Wu, 2017. "A Multi-Objective Trade-Off Model in Sustainable Construction Projects," Sustainability, MDPI, vol. 9(11), pages 1-18, October.
    8. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    9. Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha, 2018. "Identification and evaluation of criteria for selecting contractors using a risk management approach," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1747-1760, July.
    10. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    11. S Taghipour & D Banjevic & A K S Jardine, 2011. "Prioritization of medical equipment for maintenance decisions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1666-1687, September.
    12. Martin Ekstrom & Hans Bjornsson & Clifford Nass, 2003. "Accounting for rater credibility when evaluating AEC subcontractors," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 197-208.
    13. Junn-Yuan Teng & Wen-Chih Huang & Maw-Cherng Lin, 2010. "Systematic budget allocation for transportation construction projects: a case in Taiwan," Transportation, Springer, vol. 37(2), pages 331-361, March.
    14. Guangdong Wu & Jian Zuo & Xianbo Zhao, 2017. "Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects," Sustainability, MDPI, vol. 9(7), pages 1-20, July.
    15. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    16. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    17. Puying Li & Simon Huston, 2015. "International Competitiveness of ChinaÕs Construction Firms," ERES eres2015_67, European Real Estate Society (ERES).
    18. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.
    19. Ramesh Allipour Birgani & Amirhossein Takian & Abolghasem Djazayery & Ali Kianirad & Hamed Pouraram, 2022. "Climate Change and Food Security Prioritizing Indices: Applying Analytical Hierarchy Process (AHP) and Social Network Analysis (SNA)," Sustainability, MDPI, vol. 14(14), pages 1-17, July.
    20. Mimović Predrag & Krstić Ana, 2016. "Application of Multi-Criteria Analysis in the Public Procurement Process Optimization," Economic Themes, Sciendo, vol. 54(1), pages 103-128, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:complx:8705134. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.