IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v21y2003i2p197-208.html
   My bibliography  Save this article

Accounting for rater credibility when evaluating AEC subcontractors

Author

Listed:
  • Martin Ekstrom
  • Hans Bjornsson
  • Clifford Nass

Abstract

In consumer electronic markets, rating mechanisms are important facilitators of trust between market participants. This paper investigates whether source credibility theory can support the evaluation of bidders in architecture/engineering/construction (AEC) electronic market places. In contrast to consumer electronic marketplaces, the raters in AEC communities are skilled and connected, necessitating a reputation mechanism to account for the relationship between the user and the rater. To solve this problem, TrustBuilder, a prototype rating tool, facilitates information sharing between peer industry practitioners by calculating a weighted rating based on source credibility theory. An experiment shows that AEC industry practitioners who evaluate bidding subcontractors trusted the information provided by TrustBuilder significantly more than information from a standard unweighted rating tool.

Suggested Citation

  • Martin Ekstrom & Hans Bjornsson & Clifford Nass, 2003. "Accounting for rater credibility when evaluating AEC subcontractors," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 197-208.
  • Handle: RePEc:taf:conmgt:v:21:y:2003:i:2:p:197-208
    DOI: 10.1080/0144619032000049656
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/0144619032000049656
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0144619032000049656?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Patrick Sik-Wah Fong & Sonia Kit-Yung Choi, 2000. "Final contractor selection using the analytical hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 547-557.
    2. M. Wanous & A. H. Boussabaine & J. Lewis, 2000. "To bid or not to bid: a parametric solution," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 457-466.
    3. Ezekiel Chinyio & Paul Olomolaiye & Simon Kometa & Frank Harris, 1998. "A needs-based methodology for classifying construction clients and selecting contractors," Construction Management and Economics, Taylor & Francis Journals, vol. 16(1), pages 91-98.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Franco Cheung & Judy Leung Fung Kuen & Martin Skitmore, 2002. "Multi-criteria evaluation model for the selection of architectural consultants," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 569-580.
    2. Stéphanie Boulenger & Marcelin Joanis, 2015. "Analyse économique des marchés publics dans l’industrie de la construction au Québec," CIRANO Project Reports 2015rp-23, CIRANO.
    3. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    4. Ibuchim Cyril Ogunkah & Junli Yang, 2013. "Factors Affecting the Selection of Low-Cost Green Building Materials in Housing Construction," International Journal of Sciences, Office ijSciences, vol. 2(09), pages 41-75, September.
    5. Ren Tan & Kairong Hong, 2021. "Research on Extreme Dispute Decisions of Large-Scale Engineering Projects from the Perspective of Multidimensional Preferences," Mathematics, MDPI, vol. 9(22), pages 1-24, November.
    6. S Taghipour & D Banjevic & A K S Jardine, 2011. "Prioritization of medical equipment for maintenance decisions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1666-1687, September.
    7. Martin Skitmore & Anthony Mills, 1999. "A needs based methodology for classifying construction clients and selecting contractors: comment," Construction Management and Economics, Taylor & Francis Journals, vol. 17(1), pages 5-7.
    8. Fuchigami, Helio Yochihiro & Tuni, Andrea & Barbosa, Luísa Queiroz & Severino, Maico Roris & Rentizelas, Athanasios, 2021. "Supporting Brazilian smallholder farmers decision making in supplying institutional markets," European Journal of Operational Research, Elsevier, vol. 295(1), pages 321-335.
    9. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    10. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    11. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.
    12. Aziz Naghizadeh Vardin & Ramin Ansari & Mohammad Khalilzadeh & Jurgita Antucheviciene & Romualdas Bausys, 2021. "An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects," Sustainability, MDPI, vol. 13(12), pages 1-28, June.
    13. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.
    14. Qiao, Yu & Labi, Samuel & Fricker, Jon D., 2021. "Does highway project bundling policy affect bidding competition? Insights from a mixed ordinal logistic model," Transportation Research Part A: Policy and Practice, Elsevier, vol. 145(C), pages 228-242.
    15. K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
    16. Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha, 2018. "Identification and evaluation of criteria for selecting contractors using a risk management approach," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1747-1760, July.
    17. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    18. Junn-Yuan Teng & Wen-Chih Huang & Maw-Cherng Lin, 2010. "Systematic budget allocation for transportation construction projects: a case in Taiwan," Transportation, Springer, vol. 37(2), pages 331-361, March.
    19. Puying Li & Simon Huston, 2015. "International Competitiveness of ChinaÕs Construction Firms," ERES eres2015_67, European Real Estate Society (ERES).
    20. Ramesh Allipour Birgani & Amirhossein Takian & Abolghasem Djazayery & Ali Kianirad & Hamed Pouraram, 2022. "Climate Change and Food Security Prioritizing Indices: Applying Analytical Hierarchy Process (AHP) and Social Network Analysis (SNA)," Sustainability, MDPI, vol. 14(14), pages 1-17, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:21:y:2003:i:2:p:197-208. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.