IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v20y2002i7p557-568.html
   My bibliography  Save this article

A multi-attribute utility model for dispute resolution strategy selection

Author

Listed:
  • Sai-On Cheung
  • Henry Suen

Abstract

Disputes are inevitable in construction projects. Skills in dispute resolution should be part of the toolkit of any practitioner in a managerial position. Dispute resolution procedures such as litigation, arbitration, mediation, dispute adviser and negotiation are widely practised. However, frequently the question is how to systematically determine which dispute resolution strategy to adopt given the nature of disputes. Even though the topic of dispute resolution has been widely discussed and heavily researched, few studies have been conducted with respect to this question. A decision-making model has been developed using the analytical hierarchy process (AHP) and multi-attribute utility technique (MAUT). The model comprises four parts: selection criteria, dispute resolution strategies, collection of utility factors and selection criteria weightings. These were developed from empirical data collected through an interview survey with selected experts in the field. The model is designed to identify in a systematic manner an appropriate dispute resolution strategy for a given dispute, rather than relying on subjective decisions. The model is tested using a hypothetical scenario in which three case studies are evaluated.

Suggested Citation

  • Sai-On Cheung & Henry Suen, 2002. "A multi-attribute utility model for dispute resolution strategy selection," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 557-568.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:7:p:557-568
    DOI: 10.1080/01446190210157568
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190210157568
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190210157568?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Patrick Sik-Wah Fong & Sonia Kit-Yung Choi, 2000. "Final contractor selection using the analytical hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 547-557.
    2. Qiping Shen & Kak-Keung Lo & Qian Wang, 1998. "Priority setting in maintenance management: a modified multi-attribute approach using analytic hierarchy process," Construction Management and Economics, Taylor & Francis Journals, vol. 16(6), pages 693-702.
    3. Sai-On Cheung & Tsun-Ip Lam & Mei-Yung Leung & Yue-Wang Wan, 2001. "An analytical hierarchy process based procurement selection method," Construction Management and Economics, Taylor & Francis Journals, vol. 19(4), pages 427-437.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Qingye Han & Yuming Zhu & Ginger Y. Ke & Hongli Lin, 2019. "A Two-Stage Decision Framework for Resolving Brownfield Conflicts," IJERPH, MDPI, vol. 16(6), pages 1-19, March.
    2. Farrah Azwanee Aminuddin & Lu Wai Teng, 2024. "Mediation as in Construction: An Empirical Investigation on the Evaluative and Facilitative Mediation," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(4), pages 1997-2016, April.
    3. Dang Vo, Khoa & Thanh Nguyen, Phong & Le Hoang Thuy To Nguyen, Quyen, 2020. "Disputes in Managing Projects: A Case Study of Construction Industry in Vietnam," MPRA Paper 103436, University Library of Munich, Germany, revised 05 Jul 2020.
    4. Odubiyi Tawakalitu Bisola, 2018. "Nigerian Professional Female Construction Workers in Vocational Occupations: Diversification or Deviation?," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1696-1703, February.
    5. Yaprak Arici Ustuner Author-Email: yarici@fsm.edu.tr & Elcin Tas Author-Email: tase@itu.edu.tr, 2019. "An Examination of the Mediation Processes of International ADR Institutions and the Evaluation of the Turkish Construction Professionals’ Perspectives on Mediation," Eurasian Journal of Social Sciences, Eurasian Publications, vol. 7(4), pages 11-27.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Franco Cheung & Judy Leung Fung Kuen & Martin Skitmore, 2002. "Multi-criteria evaluation model for the selection of architectural consultants," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 569-580.
    2. Per Erik Eriksson & Ossi Pesamaa, 2007. "Modelling procurement effects on cooperation," Construction Management and Economics, Taylor & Francis Journals, vol. 25(8), pages 893-901.
    3. Nan Zhao & Fei J Ying & John Tookey, 2022. "Construction Procurement Selection Criteria: A Review and Research Agenda," Sustainability, MDPI, vol. 14(22), pages 1-16, November.
    4. Junling Zhang & Xiaowen Qi & Changyong Liang, 2018. "Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependen," Complexity, Hindawi, vol. 2018, pages 1-31, December.
    5. K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
    6. Stéphanie Boulenger & Marcelin Joanis, 2015. "Analyse économique des marchés publics dans l’industrie de la construction au Québec," CIRANO Project Reports 2015rp-23, CIRANO.
    7. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    8. Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha, 2018. "Identification and evaluation of criteria for selecting contractors using a risk management approach," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1747-1760, July.
    9. Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
    10. M C Carnero, 2009. "Selection of condition monitoring techniques using discrete probability distributions: A case study," Journal of Risk and Reliability, , vol. 223(1), pages 99-117, March.
    11. S Taghipour & D Banjevic & A K S Jardine, 2011. "Prioritization of medical equipment for maintenance decisions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1666-1687, September.
    12. Grace Lee & Edwin Chan, 2008. "The Analytic Hierarchy Process (AHP) Approach for Assessment of Urban Renewal Proposals," Social Indicators Research: An International and Interdisciplinary Journal for Quality-of-Life Measurement, Springer, vol. 89(1), pages 155-168, October.
    13. Martin Ekstrom & Hans Bjornsson & Clifford Nass, 2003. "Accounting for rater credibility when evaluating AEC subcontractors," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 197-208.
    14. Junn-Yuan Teng & Wen-Chih Huang & Maw-Cherng Lin, 2010. "Systematic budget allocation for transportation construction projects: a case in Taiwan," Transportation, Springer, vol. 37(2), pages 331-361, March.
    15. Narasimhan, Ram & Talluri, Srinivas & Mahapatra, Santosh, 2008. "Effective response to RFQs and supplier development: A supplier's perspective," International Journal of Production Economics, Elsevier, vol. 115(2), pages 461-470, October.
    16. Odhigu Festus Onosakponome & Nazatul Shima Abdul Rani & Junaid M. Shaikh, 2011. "Cost Benefit Analysis of Procurement Systems and the Performance of Construction Projects in East Malaysia," Information Management and Business Review, AMH International, vol. 2(5), pages 181-192.
    17. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    18. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    19. Puying Li & Simon Huston, 2015. "International Competitiveness of ChinaÕs Construction Firms," ERES eres2015_67, European Real Estate Society (ERES).
    20. Yi Zhang, 2020. "Construction of Bid Evaluation Index System in Government Public Project Green Procurement in China Based on D-S Evidence Theory," Sustainability, MDPI, vol. 12(2), pages 1-15, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:7:p:557-568. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.