TenSeM: a multicriteria and multidecision-makers' model in tender evaluation
Author
Abstract
Suggested Citation
DOI: 10.1080/0144619032000065090
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Zedan Hatush & Martin Skitmore, 1997. "Assessment and evaluation of contractor data against client goals using PERT approach," Construction Management and Economics, Taylor & Francis Journals, vol. 15(4), pages 327-340.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Pablo Ballesteros-P�rez & Martin Skitmore & Eugenio Pellicer & M. Carmen Gonz�lez-Cruz, 2015. "Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review," Construction Management and Economics, Taylor & Francis Journals, vol. 33(4), pages 259-278, April.
- Nadeera Abdul Razak & Obuks Ejohwomu & Peter Fenn & Kamil Okedara & Babatunde Dosumu & Firdaus Muhammad-Sukki, 2021. "Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review," Energies, MDPI, vol. 14(21), pages 1-17, November.
- Lorentziadis, Panos L., 2010. "Post-objective determination of weights of the evaluation factors in public procurement tenders," European Journal of Operational Research, Elsevier, vol. 200(1), pages 261-267, January.
- Bana e Costa, Carlos A. & Lourenço, João C. & Chagas, Manuel P. & Bana e Costa, João C., 2007. "Development of reusable bid evaluation models for the Portugese Electric Transmission Company," LSE Research Online Documents on Economics 22697, London School of Economics and Political Science, LSE Library.
- Štěpán Veselý & Mirko Dohnal, 2012. "Decision making in goverment tenders: A formalized qualitative model," Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis, Mendel University Press, vol. 60(4), pages 397-406.
- Carlos A. Bana e Costa & João C. Lourenço & Manuel P. Chagas & João C. Bana e Costa, 2008. "Development of Reusable Bid Evaluation Models for the Portuguese Electric Transmission Company," Decision Analysis, INFORMS, vol. 5(1), pages 22-42, March.
- J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- K. C. Lam & T. S. Hu & S. T. Ng, 2005. "Using the principal component analysis method as a tool in contractor pre-qualification," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 673-684.
- Deep Shumank & Simon Laura & Asim Mohd & Rahimzadeh Ali & Al-Hamdani Sulala, 2018. "An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario," Organization, Technology and Management in Construction, Sciendo, vol. 10(1), pages 1794-1802, October.
- Dariusz Masłowski & Kinga Kijewska & Ewa Kulińska, 2021. "Management of Municipal Public Transport Vehicle Journeys by Using the PERT Method," Energies, MDPI, vol. 14(15), pages 1-18, July.
- Bingsheng Liu & Tengfei Huo & Pinchao Liao & Jie Gong & Bin Xue, 2015. "A Group Decision-Making Aggregation Model for Contractor Selection in Large Scale Construction Projects Based on Two-Stage Partial Least Squares (PLS) Path Modeling," Group Decision and Negotiation, Springer, vol. 24(5), pages 855-883, September.
- Aziz Naghizadeh Vardin & Ramin Ansari & Mohammad Khalilzadeh & Jurgita Antucheviciene & Romualdas Bausys, 2021. "An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects," Sustainability, MDPI, vol. 13(12), pages 1-28, June.
More about this item
Keywords
Multicriteria; Multidecision-makers; Interactive Model; Tender Evaluation; Social Welfare Function;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:21:y:2003:i:1:p:21-30. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.