IDEAS home Printed from https://ideas.repec.org/a/spr/orspec/v46y2024i3d10.1007_s00291-023-00740-0.html
   My bibliography  Save this article

Risk assessment and optimal scheduling of serial projects

Author

Listed:
  • Zixuan Zhang

    (City, University of London)

  • Michail Chronopoulos

    (City, University of London)

  • Dimitrina S. Dimitrova

    (City, University of London)

  • Ioannis Kyriakou

    (City, University of London)

Abstract

The valuation and planning of complex projects are becoming increasingly challenging with rising market uncertainty and the deregulation of many industries, which have also raised the need for efficient risk management. We take the perspective of a private firm interested in sequential capacity expansion of a project and develop a framework for measuring the downside risk of the serial project and optimising the sequence of the stages. Under general distributional assumptions for the duration of each stage, we present an accurate representation of the project’s net present value (NPV) distribution based on a Pearson curve fit, leading to closed-form expressions for the associated risk measures. We then assess the impact of duration variability on the value at risk and demonstrate its role in stochastic project scheduling. We also account for the trade-off between maximising the expected NPV and minimising the risk exposure, and obtain the optimal schedule for risk-averse decision-makers. It becomes obvious that both the duration variability of each stage and the decision-makers’ risk preferences can significantly affect the optimal sequence of the stages and that high duration variability is not always undesirable, even for risk-averse decision-makers.

Suggested Citation

  • Zixuan Zhang & Michail Chronopoulos & Dimitrina S. Dimitrova & Ioannis Kyriakou, 2024. "Risk assessment and optimal scheduling of serial projects," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 46(3), pages 709-736, September.
  • Handle: RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00740-0
    DOI: 10.1007/s00291-023-00740-0
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s00291-023-00740-0
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s00291-023-00740-0?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Andrea Gamba & Nicola Fusari, 2009. "Valuing Modularity as a Real Option," Management Science, INFORMS, vol. 55(11), pages 1877-1896, November.
    2. Jeon, Haejun, 2021. "Investment and financing decisions in the presence of time-to-build," European Journal of Operational Research, Elsevier, vol. 288(3), pages 1068-1084.
    3. Kuno J.M. Huisman & Peter M. Kort, 2015. "Strategic capacity investment under uncertainty," RAND Journal of Economics, RAND Corporation, vol. 46(2), pages 376-408, June.
    4. Xiao Wang & Yufu Ning, 2018. "Uncertain chance-constrained programming model for project scheduling problem," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 69(3), pages 384-391, March.
    5. Leyman, Pieter & Vanhoucke, Mario, 2017. "Capital- and resource-constrained project scheduling with net present value optimization," European Journal of Operational Research, Elsevier, vol. 256(3), pages 757-776.
    6. Wiesemann, Wolfram & Kuhn, Daniel & Rustem, Berç, 2010. "Maximizing the net present value of a project under uncertainty," European Journal of Operational Research, Elsevier, vol. 202(2), pages 356-367, April.
    7. Almond, Brian & Remer, Ronald S., 1979. "Models for present-worth analysis of selected industrial cash flow patterns," Engineering and Process Economics, Elsevier, vol. 4(4), pages 455-466, December.
    8. Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
    9. Tony Chen & Ted Klastorin & Michael R. Wagner, 2015. "Incentive Contracts in Serial Stochastic Projects," Manufacturing & Service Operations Management, INFORMS, vol. 17(3), pages 290-301, July.
    10. Carliss Y. Baldwin & Kim B. Clark, 2000. "Design Rules, Volume 1: The Power of Modularity," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262024667, April.
    11. Chunxiao Ding & Yuanguo Zhu, 2015. "Two empirical uncertain models for project scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(9), pages 1471-1480, September.
    12. James Van Horne, 1966. "Capital-Budgeting Decisions Involving Combinations of Risky Investments," Management Science, INFORMS, vol. 13(2), pages 84-92, October.
    13. Gollier, Christian & Proult, David & Thais, Francoise & Walgenwitz, Gilles, 2005. "Choice of nuclear power investments under price uncertainty: Valuing modularity," Energy Economics, Elsevier, vol. 27(4), pages 667-685, July.
    14. Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
    15. Yang Zhao & Charalampos Stasinakis & Georgios Sermpinis & Yukun Shi, 2018. "Neural network copula portfolio optimization for exchange traded funds," Quantitative Finance, Taylor & Francis Journals, vol. 18(5), pages 761-775, May.
    16. Yang Zhao & Charalampos Stasinakis & Georgios Sermpinis & Filipa Da Silva Fernandes, 2019. "Revisiting Fama–French factors' predictability with Bayesian modelling and copula‐based portfolio optimization," International Journal of Finance & Economics, John Wiley & Sons, Ltd., vol. 24(4), pages 1443-1463, October.
    17. Kort, Peter M. & Murto, Pauli & Pawlina, Grzegorz, 2010. "Uncertainty and stepwise investment," European Journal of Operational Research, Elsevier, vol. 202(1), pages 196-203, April.
    18. Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017. "Stepwise investment and capacity sizing under uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
    19. Chen, Zhi & Demeulemeester, Erik & Bai, Sijun & Guo, Yuntao, 2018. "Efficient priority rules for the stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 270(3), pages 957-967.
    20. Herroelen, Willy & Leus, Roel, 2005. "Project scheduling under uncertainty: Survey and research potentials," European Journal of Operational Research, Elsevier, vol. 165(2), pages 289-306, September.
    21. Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
    22. Remer, Donald S. & Nieto, Armando P., 1995. "A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods," International Journal of Production Economics, Elsevier, vol. 42(1), pages 79-96, November.
    23. Gutjahr, Walter J., 2015. "Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion," European Journal of Operational Research, Elsevier, vol. 246(2), pages 421-434.
    24. Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
    25. Robert McDonald & Daniel Siegel, 1986. "The Value of Waiting to Invest," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 101(4), pages 707-727.
    26. Brignone, Riccardo & Kyriakou, Ioannis & Fusai, Gianluca, 2021. "Moment-matching approximations for stochastic sums in non-Gaussian Ornstein–Uhlenbeck models," Insurance: Mathematics and Economics, Elsevier, vol. 96(C), pages 232-247.
    27. Cui, Zhenyu & Fu, Michael C. & Peng, Yijie & Zhu, Lingjiong, 2020. "Optimal unbiased estimation for expected cumulative discounted cost," European Journal of Operational Research, Elsevier, vol. 286(2), pages 604-618.
    28. Raul O. Chao & Kenneth C. Lichtendahl Jr. & Yael Grushka-Cockayne, 2014. "Incentives in a Stage-Gate Process," Production and Operations Management, Production and Operations Management Society, vol. 23(8), pages 1286-1298, August.
    29. Yangyang Liang & Nanfang Cui & Tian Wang & Erik Demeulemeester, 2019. "Robust resource-constrained max-NPV project scheduling with stochastic activity duration," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 219-254, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bruni, Maria Elena & Hazır, Öncü, 2024. "A risk-averse distributionally robust project scheduling model to address payment delays," European Journal of Operational Research, Elsevier, vol. 318(2), pages 398-407.
    2. Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017. "Stepwise investment and capacity sizing under uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
    3. Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
    4. Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
    5. Michail Chronopoulos, Verena Hagspiel, and Stein-Erik Fleten, 2016. "Stepwise Green Investment under Policy Uncertainty," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4).
    6. Sendstad, Lars Hegnes & Chronopoulos, Michail, 2021. "Strategic technology switching under risk aversion and uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
    7. Balliauw, Matteo, 2021. "Time to build: A real options analysis of port capacity expansion investments under uncertainty," Research in Transportation Economics, Elsevier, vol. 90(C).
    8. Arve, Malin & Zwart, Gijsbert, 2023. "Optimal procurement and investment in new technologies under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 147(C).
    9. Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
    10. Adkins, Roger & Paxson, Dean, 2019. "Rescaling-contraction with a lower cost technology when revenue declines," European Journal of Operational Research, Elsevier, vol. 277(2), pages 574-586.
    11. Billette de Villemeur, Etienne & Ruble, Richard & Versaevel, Bruno, 2014. "Investment timing and vertical relationships," International Journal of Industrial Organization, Elsevier, vol. 33(C), pages 110-123.
    12. Delaney, Laura, 2021. "A model of investment under uncertainty with time to build, market incompleteness and risk aversion," European Journal of Operational Research, Elsevier, vol. 293(3), pages 1155-1167.
    13. Lamas, Patricio & Goycoolea, Marcos & Pagnoncelli, Bernardo & Newman, Alexandra, 2024. "A target-time-windows technique for project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 314(2), pages 792-806.
    14. Chevalier-Roignant, Benoît & Flath, Christoph M. & Huchzermeier, Arnd & Trigeorgis, Lenos, 2011. "Strategic investment under uncertainty: A synthesis," European Journal of Operational Research, Elsevier, vol. 215(3), pages 639-650, December.
    15. Huberts, Nick F.D. & Rossi Silveira, Rafael, 2023. "How economic depreciation shapes the relationship of uncertainty with investments’ size & timing," International Journal of Production Economics, Elsevier, vol. 260(C).
    16. Bordley, Robert F. & Keisler, Jeffrey M. & Logan, Tom M., 2019. "Managing projects with uncertain deadlines," European Journal of Operational Research, Elsevier, vol. 274(1), pages 291-302.
    17. Aïd, René & Li, Liangchen & Ludkovski, Michael, 2017. "Capacity expansion games with application to competition in power generation investments," Journal of Economic Dynamics and Control, Elsevier, vol. 84(C), pages 1-31.
    18. Spiros H. Martzoukos & Nayia Pospori & Lenos Trigeorgis, 2024. "Corporate investment decisions with switch flexibility, constraints, and path-dependency," Review of Quantitative Finance and Accounting, Springer, vol. 62(3), pages 1223-1250, April.
    19. Sendstad, Lars Hegnes & Chronopoulos, Michail, 2017. "Strategic Technology Switching under Risk Aversion and Uncertainty," Discussion Papers 2017/10, Norwegian School of Economics, Department of Business and Management Science.
    20. Roques, F.A. & Savva , N.S., 2006. "Price Cap Regulation and Investment Incentives under Demand Uncertainty," Cambridge Working Papers in Economics 0636, Faculty of Economics, University of Cambridge.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00740-0. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.