Risk assessment and optimal scheduling of serial projects
Author
Abstract
Suggested Citation
DOI: 10.1007/s00291-023-00740-0
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Chen, Zhi & Demeulemeester, Erik & Bai, Sijun & Guo, Yuntao, 2018. "Efficient priority rules for the stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 270(3), pages 957-967.
- Tony Chen & Ted Klastorin & Michael R. Wagner, 2015. "Incentive Contracts in Serial Stochastic Projects," Manufacturing & Service Operations Management, INFORMS, vol. 17(3), pages 290-301, July.
- Andrea Gamba & Nicola Fusari, 2009.
"Valuing Modularity as a Real Option,"
Management Science, INFORMS, vol. 55(11), pages 1877-1896, November.
- Andrea GAMBA & Nicola FUSARI, 2008. "Valuing modularity as a real option," Swiss Finance Institute Research Paper Series 08-20, Swiss Finance Institute.
- Jeon, Haejun, 2021. "Investment and financing decisions in the presence of time-to-build," European Journal of Operational Research, Elsevier, vol. 288(3), pages 1068-1084.
- Kuno J.M. Huisman & Peter M. Kort, 2015.
"Strategic capacity investment under uncertainty,"
RAND Journal of Economics, RAND Corporation, vol. 46(2), pages 376-408, June.
- Huisman, K.J.M. & Kort, P.M., 2013. "Strategic Capacity Investment Under uncertainty," Discussion Paper 2013-003, Tilburg University, Center for Economic Research.
- Huisman, K.J.M. & Kort, P.M., 2013. "Strategic Capacity Investment Under uncertainty," Other publications TiSEM d8f47e8c-1550-4a51-b0fb-3, Tilburg University, School of Economics and Management.
- Herroelen, Willy & Leus, Roel, 2005. "Project scheduling under uncertainty: Survey and research potentials," European Journal of Operational Research, Elsevier, vol. 165(2), pages 289-306, September.
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017.
"Stepwise investment and capacity sizing under uncertainty,"
OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
- Chronopoulos, Michail & Hagspiel, Verena & Fleten, Stein–Erik, 2015. "Stepwise Investment and Capacity Sizing under Uncertainty," Discussion Papers 2015/10, Norwegian School of Economics, Department of Business and Management Science.
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
- Carliss Y. Baldwin & Kim B. Clark, 2000. "Design Rules, Volume 1: The Power of Modularity," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262024667, April.
- Brignone, Riccardo & Kyriakou, Ioannis & Fusai, Gianluca, 2021. "Moment-matching approximations for stochastic sums in non-Gaussian Ornstein–Uhlenbeck models," Insurance: Mathematics and Economics, Elsevier, vol. 96(C), pages 232-247.
- Gollier, Christian & Proult, David & Thais, Francoise & Walgenwitz, Gilles, 2005.
"Choice of nuclear power investments under price uncertainty: Valuing modularity,"
Energy Economics, Elsevier, vol. 27(4), pages 667-685, July.
- Gollier, Christian & Proult, David & Thais, Françoise & Walgenwitz, Gilles, 2004. "Choice of Nuclear Power Investments ander Price Uncertainty: Valuing Modularity," IDEI Working Papers 270, Institut d'Économie Industrielle (IDEI), Toulouse.
- Gollier, Christian, 2004. "Choice of Nuclear Power Investments under Price Uncertainty: Valuing Modularity," IDEI Working Papers 287, Institut d'Économie Industrielle (IDEI), Toulouse.
- Xiao Wang & Yufu Ning, 2018. "Uncertain chance-constrained programming model for project scheduling problem," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 69(3), pages 384-391, March.
- Chunxiao Ding & Yuanguo Zhu, 2015. "Two empirical uncertain models for project scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(9), pages 1471-1480, September.
- Remer, Donald S. & Nieto, Armando P., 1995. "A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods," International Journal of Production Economics, Elsevier, vol. 42(1), pages 79-96, November.
- Gutjahr, Walter J., 2015. "Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion," European Journal of Operational Research, Elsevier, vol. 246(2), pages 421-434.
- James Van Horne, 1966. "Capital-Budgeting Decisions Involving Combinations of Risky Investments," Management Science, INFORMS, vol. 13(2), pages 84-92, October.
- Cui, Zhenyu & Fu, Michael C. & Peng, Yijie & Zhu, Lingjiong, 2020. "Optimal unbiased estimation for expected cumulative discounted cost," European Journal of Operational Research, Elsevier, vol. 286(2), pages 604-618.
- Raul O. Chao & Kenneth C. Lichtendahl Jr. & Yael Grushka-Cockayne, 2014. "Incentives in a Stage-Gate Process," Production and Operations Management, Production and Operations Management Society, vol. 23(8), pages 1286-1298, August.
- Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Yang Zhao & Charalampos Stasinakis & Georgios Sermpinis & Yukun Shi, 2018. "Neural network copula portfolio optimization for exchange traded funds," Quantitative Finance, Taylor & Francis Journals, vol. 18(5), pages 761-775, May.
- Robert McDonald & Daniel Siegel, 1986. "The Value of Waiting to Invest," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 101(4), pages 707-727.
- Yang Zhao & Charalampos Stasinakis & Georgios Sermpinis & Filipa Da Silva Fernandes, 2019. "Revisiting Fama–French factors' predictability with Bayesian modelling and copula‐based portfolio optimization," International Journal of Finance & Economics, John Wiley & Sons, Ltd., vol. 24(4), pages 1443-1463, October.
- Leyman, Pieter & Vanhoucke, Mario, 2017. "Capital- and resource-constrained project scheduling with net present value optimization," European Journal of Operational Research, Elsevier, vol. 256(3), pages 757-776.
- Wiesemann, Wolfram & Kuhn, Daniel & Rustem, Berç, 2010. "Maximizing the net present value of a project under uncertainty," European Journal of Operational Research, Elsevier, vol. 202(2), pages 356-367, April.
- Kort, Peter M. & Murto, Pauli & Pawlina, Grzegorz, 2010. "Uncertainty and stepwise investment," European Journal of Operational Research, Elsevier, vol. 202(1), pages 196-203, April.
- Yangyang Liang & Nanfang Cui & Tian Wang & Erik Demeulemeester, 2019. "Robust resource-constrained max-NPV project scheduling with stochastic activity duration," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 219-254, March.
- Almond, Brian & Remer, Ronald S., 1979. "Models for present-worth analysis of selected industrial cash flow patterns," Engineering and Process Economics, Elsevier, vol. 4(4), pages 455-466, December.
- Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bruni, Maria Elena & Hazır, Öncü, 2024. "A risk-averse distributionally robust project scheduling model to address payment delays," European Journal of Operational Research, Elsevier, vol. 318(2), pages 398-407.
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017.
"Stepwise investment and capacity sizing under uncertainty,"
OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
- Chronopoulos, Michail & Hagspiel, Verena & Fleten, Stein–Erik, 2015. "Stepwise Investment and Capacity Sizing under Uncertainty," Discussion Papers 2015/10, Norwegian School of Economics, Department of Business and Management Science.
- Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
- Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
- Michail Chronopoulos, Verena Hagspiel, and Stein-Erik Fleten, 2016.
"Stepwise Green Investment under Policy Uncertainty,"
The Energy Journal, International Association for Energy Economics, vol. 0(Number 4).
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2016. "Stepwise Green Investment under Policy Uncertainty," The Energy Journal, , vol. 37(4), pages 87-108, October.
- Sendstad, Lars Hegnes & Chronopoulos, Michail, 2021. "Strategic technology switching under risk aversion and uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
- Balliauw, Matteo, 2021. "Time to build: A real options analysis of port capacity expansion investments under uncertainty," Research in Transportation Economics, Elsevier, vol. 90(C).
- Arve, Malin & Zwart, Gijsbert, 2023. "Optimal procurement and investment in new technologies under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 147(C).
- Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Adkins, Roger & Paxson, Dean, 2019. "Rescaling-contraction with a lower cost technology when revenue declines," European Journal of Operational Research, Elsevier, vol. 277(2), pages 574-586.
- He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
- Siddiqui, Afzal & Takashima, Ryuta, 2012. "Capacity switching options under rivalry and uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 583-595.
- Tine Compernolle & Kuno J. M. Huisman & Peter M. Kort & Maria Lavrutich & Cláudia Nunes & Jacco J. J. Thijssen, 2021.
"Investment Decisions with Two-Factor Uncertainty,"
JRFM, MDPI, vol. 14(11), pages 1-17, November.
- Compernolle, T. & Huisman, Kuno & Kort, Peter M. & Lavrutich, Maria & Nunes, Claudia & Thijssen, J.J.J., 2018. "Investment Decisions with Two-Factor Uncertainty," Other publications TiSEM 9e05d125-86f6-4549-9d49-9, Tilburg University, School of Economics and Management.
- Compernolle, T. & Huisman, Kuno & Kort, Peter M. & Lavrutich, Maria & Nunes, Claudia & Thijssen, J.J.J., 2018. "Investment Decisions with Two-Factor Uncertainty," Discussion Paper 2018-003, Tilburg University, Center for Economic Research.
- Billette de Villemeur, Etienne & Ruble, Richard & Versaevel, Bruno, 2014.
"Investment timing and vertical relationships,"
International Journal of Industrial Organization, Elsevier, vol. 33(C), pages 110-123.
- Billette de Villemeur, Etienne & Ruble, Richard & Versaevel, Bruno, 2013. "Investment Timing and Vertical Relationships," MPRA Paper 47804, University Library of Munich, Germany.
- Etienne Billette de Villemeur & Richard Ruble & Bruno Versaevel, 2014. "Investment timing and vertical relationships," Post-Print halshs-02096674, HAL.
- Etienne Billette de Villemeur & Richard Ruble & Bruno Versaevel, 2014. "Investment timing and vertical relationships," Post-Print hal-02313058, HAL.
- Zdenìk Zmeškal, 2008. "Application of the American Real Flexible Switch Options Methodology A Generalized Approach," Czech Journal of Economics and Finance (Finance a uver), Charles University Prague, Faculty of Social Sciences, vol. 58(05-06), pages 261-275, August.
- Chronopoulos, Michail & Siddiqui, Afzal, 2014. "When is it Better to Wait for a New Version? Optimal Replacement of an Emerging Technology under Uncertainty," Discussion Papers 2014/26, Norwegian School of Economics, Department of Business and Management Science.
- Delaney, Laura, 2021. "A model of investment under uncertainty with time to build, market incompleteness and risk aversion," European Journal of Operational Research, Elsevier, vol. 293(3), pages 1155-1167.
- Lamas, Patricio & Goycoolea, Marcos & Pagnoncelli, Bernardo & Newman, Alexandra, 2024. "A target-time-windows technique for project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 314(2), pages 792-806.
- Chevalier-Roignant, Benoît & Flath, Christoph M. & Huchzermeier, Arnd & Trigeorgis, Lenos, 2011. "Strategic investment under uncertainty: A synthesis," European Journal of Operational Research, Elsevier, vol. 215(3), pages 639-650, December.
More about this item
Keywords
Decision analysis; Modularity; NPV distribution; Project scheduling; Risk analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:orspec:v:46:y:2024:i:3:d:10.1007_s00291-023-00740-0. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.