Enhancement for human resource management in the ULD build-up process of air-cargo terminal: a strategic linkage approach
Author
Abstract
Suggested Citation
DOI: 10.1007/s10732-020-09436-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Billionnet, Alain, 1999. "Integer programming to schedule a hierarchical workforce with variable demands," European Journal of Operational Research, Elsevier, vol. 114(1), pages 105-114, April.
- Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
- D. Dowling & M. Krishnamoorthy & H. Mackenzie & D. Sier, 1997. "Staff rostering at a large international airport," Annals of Operations Research, Springer, vol. 72(0), pages 125-147, January.
- Yang, Ta-Hui & Yan, Shangyao & Chen, Hsuan-Hung, 2003. "An airline maintenance manpower planning model with flexible strategies," Journal of Air Transport Management, Elsevier, vol. 9(4), pages 233-239.
- De Bruecker, Philippe & Beliën, Jeroen & Van den Bergh, Jorne & Demeulemeester, Erik, 2018. "A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance," European Journal of Operational Research, Elsevier, vol. 267(2), pages 439-452.
- Rong, Aiying & Grunow, Martin, 2009. "Shift designs for freight handling personnel at air cargo terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(5), pages 725-739, September.
- Yves Nobert & Jacques Roy, 1998. "Freight Handling Personnel Scheduling at Air Cargo Terminals," Transportation Science, INFORMS, vol. 32(3), pages 295-301, August.
- De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints," European Journal of Operational Research, Elsevier, vol. 246(2), pages 661-673.
- Shangyao Yan & Chia‐Hung Chen & Miawjane Chen, 2008. "Stochastic models for air cargo terminal manpower supply planning in long‐term operations," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 24(3), pages 261-275, May.
- Lavoie, Sylvie & Minoux, Michel & Odier, Edouard, 1988. "A new approach for crew pairing problems by column generation with an application to air transportation," European Journal of Operational Research, Elsevier, vol. 35(1), pages 45-58, April.
- Jeroen Beliën & Brecht Cardoen & Erik Demeulemeester, 2012. "Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics," Interfaces, INFORMS, vol. 42(4), pages 352-364, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
- Brandt, Felix & Nickel, Stefan, 2019. "The air cargo load planning problem - a consolidated problem definition and literature review on related problems," European Journal of Operational Research, Elsevier, vol. 275(2), pages 399-410.
- Qin, Yichen & Ng, Kam K.H., 2023. "Analysing the impact of collaborations between airlines and maintenance service company under MRO outsourcing mode: Perspective from airline's operations," Journal of Air Transport Management, Elsevier, vol. 109(C).
- Sanja Petrovic, 2019. "“You have to get wet to learn how to swim” applied to bridging the gap between research into personnel scheduling and its implementation in practice," Annals of Operations Research, Springer, vol. 275(1), pages 161-179, April.
- Lishun Zeng & Mingyu Zhao & Yangfan Liu, 2019. "Airport ground workforce planning with hierarchical skills: a new formulation and branch-and-price approach," Annals of Operations Research, Springer, vol. 275(1), pages 245-258, April.
- Julie Poullet & Axel Parmentier, 2020. "Shift Planning Under Delay Uncertainty at Air France: A Vehicle-Scheduling Problem with Outsourcing," Transportation Science, INFORMS, vol. 54(4), pages 956-972, July.
- Jens Brunner & Jonathan Bard & Rainer Kolisch, 2009. "Flexible shift scheduling of physicians," Health Care Management Science, Springer, vol. 12(3), pages 285-305, September.
- Ferdinand Kiermaier & Markus Frey & Jonathan F. Bard, 2020. "The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers," Journal of Scheduling, Springer, vol. 23(2), pages 177-209, April.
- Jonathan F. Bard & Lin Wan, 2008. "Workforce Design with Movement Restrictions Between Workstation Groups," Manufacturing & Service Operations Management, INFORMS, vol. 10(1), pages 24-42, November.
- De Bruecker, Philippe & Beliën, Jeroen & Van den Bergh, Jorne & Demeulemeester, Erik, 2018. "A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance," European Journal of Operational Research, Elsevier, vol. 267(2), pages 439-452.
- Eltoukhy, Abdelrahman E.E. & Wang, Z.X. & Chan, Felix T.S. & Fu, X., 2019. "Data analytics in managing aircraft routing and maintenance staffing with price competition by a Stackelberg-Nash game model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 143-168.
- Ivan Kovynyov & Ralf Mikut, 2019. "Digital technologies in airport ground operations," Netnomics, Springer, vol. 20(1), pages 1-30, April.
- Komarudin, & Guerry, Marie-Anne & De Feyter, Tim & Vanden Berghe, Greet, 2013. "The roster quality staffing problem – A methodology for improving the roster quality by modifying the personnel structure," European Journal of Operational Research, Elsevier, vol. 230(3), pages 551-562.
- Vlado Popović & Milorad Kilibarda & Milan Andrejić & Borut Jereb & Dejan Dragan, 2021. "A New Sustainable Warehouse Management Approach for Workforce and Activities Scheduling," Sustainability, MDPI, vol. 13(4), pages 1-19, February.
- Jens O. Brunner & Jonathan F. Bard & Jan M. Köhler, 2013. "Bounded flexibility in days‐on and days‐off scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(8), pages 678-701, December.
- Juan P. Cavada & Cristián E. Cortés & Gustavo Henríquez & Pablo A. Rey, 2023. "A ground crew shift rostering model for Santiago International Airport," Operational Research, Springer, vol. 23(1), pages 1-26, March.
- Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
- Simon Emde & Hamid Abedinnia & Anne Lange & Christoph H. Glock, 2020. "Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 397-426, June.
- Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
- Brusco, Michael J., 2015. "A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives," European Journal of Operational Research, Elsevier, vol. 247(1), pages 46-59.
More about this item
Keywords
Backward removal heuristics; Linkage model; ULD build-up process; Workforce scheduling; Simulation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joheur:v:26:y:2020:i:2:d:10.1007_s10732-020-09436-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.