A cost performance analysis of transport infrastructure construction in Slovenia
Author
Abstract
Suggested Citation
DOI: 10.1007/s11116-011-9319-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
- Makovšek, Dejan, 2014. "Systematic construction risk, cost estimation mechanism and unit price movements," Transport Policy, Elsevier, vol. 35(C), pages 135-145.
- Nicola Baldo & Matteo Miani & Fabio Rondinella & Clara Celauro, 2021. "A Machine Learning Approach to Determine Airport Asphalt Concrete Layer Moduli Using Heavy Weight Deflectometer Data," Sustainability, MDPI, vol. 13(16), pages 1-17, August.
- Dejan Makovšek & Marian Moszoro, 2018.
"Risk pricing inefficiency in public–private partnerships,"
Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
- Makovsek, Dejan & Moszoro, Marian W., 2017. "Risk pricing inefficiency in public-private partnerships," MPRA Paper 101574, University Library of Munich, Germany.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
- Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rui Cunha Marques & Álvaro Fonseca, 2010. "Market structure, privatisation and regulation of Portuguese seaports," Maritime Policy & Management, Taylor & Francis Journals, vol. 37(2), pages 145-161, March.
- Eshien Chong & Carine Staropoli & Anne Yvrande-Billon, 2014.
"Auction versus Negotiation in Public Procurement: Looking for Empirical Evidence,"
Post-Print
hal-00512813, HAL.
- Eshien Chong & Carine Staropoli & Anne Yvrande-Billon, 2014. "Auction versus Negotiation in Public Procurement: Looking for Empirical Evidence," Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers) hal-00512813, HAL.
- N.F. Cruz & R.C. Marques & A. Marra & C. Pozzi, 2014.
"Local Mixed Companies: The Theory And Practice In An International Perspective,"
Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 85(1), pages 1-9, March.
- da Cruz, Nuno F. & Marques, Rui Cunha & Marra, A. & Pozzi, C., 2014. "Local mixed companies: the theory and practice in an international perspective," LSE Research Online Documents on Economics 59794, London School of Economics and Political Science, LSE Library.
- David Martimort & Flavio Menezes & Myrna Wooders & FLÁVIO MENEZES & MATTHEW RYAN, 2015. "Default and Renegotiation in Public-Private Partnership Auctions," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 49-77, February.
- Matthias Finger & Rolf W. Künneke (ed.), 2011. "International Handbook of Network Industries," Books, Edward Elgar Publishing, number 12961.
- Engel, Eduardo M.R.A. & Fischer, Ronald & Galetovic, Alexander, 2006.
"Renegotiation Without Holdup: Anticipating Spending and Infrastructure Concessions,"
Center Discussion Papers
28382, Yale University, Economic Growth Center.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2006. "Renegotiation without Holdup: Anticipating Spending and Infrastructure Concessions," Cowles Foundation Discussion Papers 1567, Cowles Foundation for Research in Economics, Yale University.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2006. "Renegotiation Without Holdup: Anticipating Spending and Infrastructure Concessions," Working Papers 937, Economic Growth Center, Yale University.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2006. "Renegotiation Without Holdup: Anticipating Spending and Infrastructure Concessions," NBER Working Papers 12399, National Bureau of Economic Research, Inc.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2006. "Renegotiation without Holdup: Anticipating Spending and Infrastructure Concessions," Documentos de Trabajo 221, Centro de Economía Aplicada, Universidad de Chile.
- Mansaray, Alhassan & Coleman, Simeon & Ataullah, Ali & Sirichand, Kavita, 2021. "Residual government ownership in public-private partnership projects," Journal of Government and Economics, Elsevier, vol. 4(C).
- Ronit Mukherji, 2023. "Risk Sharing in Public-Private Partnerships," SN Operations Research Forum, Springer, vol. 4(4), pages 1-17, December.
- Anne Stafford & Basilio Acerete & Pam Stapleton, 2010. "Making concessions: Political, commercial and regulatory tensions in accounting for European roads PPPs," Accounting and Business Research, Taylor & Francis Journals, vol. 40(5), pages 473-493.
- Claude Ménard, 2013.
"Is Public-Private Partnership Obsolete? Assessing the Obstacles and Shortcomings of PPP,"
Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers)
halshs-00653090, HAL.
- Claude Ménard, 2013. "Is Public-Private Partnership Obsolete? Assessing the Obstacles and Shortcomings of PPP," Post-Print halshs-00653090, HAL.
- Amaral, Miguel & Saussier, Stéphane & Yvrande-Billon, Anne, 2009.
"Auction procedures and competition in public services: The case of urban public transport in France and London,"
Utilities Policy, Elsevier, vol. 17(2), pages 166-175, June.
- Miguel Amaral & Stéphane Saussier & Anne Yvrande-Billon, 2009. "Auction Procedures and Competition in Public Services: The Case of Urban Public Transport in France and London," Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers) halshs-00310911, HAL.
- Miguel Amaral & Stéphane Saussier & Anne Yvrande-Billon, 2009. "Auction Procedures and Competition in Public Services: The Case of Urban Public Transport in France and London," Post-Print halshs-00310911, HAL.
- Iossa, Elisabetta & Martimort, David, 2016.
"Corruption in PPPs, incentives and contract incompleteness,"
International Journal of Industrial Organization, Elsevier, vol. 44(C), pages 85-100.
- Elisabetta Iossa & David Martimort, 2014. "Corruption in PPPs, Incentives and Contract Incompleteness," IEFE Working Papers 67, IEFE, Center for Research on Energy and Environmental Economics and Policy, Universita' Bocconi, Milano, Italy.
- Elisabetta Iossa & David Martimort, 2016. "Corruption in PPPs, incentives and contract incompleteness," PSE-Ecole d'économie de Paris (Postprint) halshs-01328626, HAL.
- Elisabetta Iossa & David Martimort, 2016. "Corruption in PPPs, incentives and contract incompleteness," Post-Print halshs-01328626, HAL.
- Elisabetta Iossa & David Martimort, 2014. "Corruption in PPPs, Incentives and Contract Incompleteness," The Centre for Market and Public Organisation 14/325, The Centre for Market and Public Organisation, University of Bristol, UK.
- Martimort, David & Iossa, Elisabetta, 2015. "Corruption in PPPs, Incentives and Contract Incompleteness," CEPR Discussion Papers 10925, C.E.P.R. Discussion Papers.
- Elisabetta Iossa & David Martimort, 2014. "Corruption in PPPs, Incentives and Contract Incompleteness," CEIS Research Paper 317, Tor Vergata University, CEIS, revised 18 Jul 2014.
- Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
- Dethier, Jean-Jacques, 2013. "Coping with urban fiscal stress around the world," Policy Research Working Paper Series 6693, The World Bank.
- Kenneth A. Small, 2009.
"Private Provision of Highways: Economic Issues,"
Transport Reviews, Taylor & Francis Journals, vol. 30(1), pages 11-31, July.
- Kenneth A. Small, 2009. "Private Provision of Highways: Economic Issues," Working Papers 080917, University of California-Irvine, Department of Economics.
- Abu Rashed, & Alam, Md. Mahmudul & Faisal, Fahim, 2019. "The Performance and Challenges of Public-Private Partnership (PPP) Projects in Bangladesh," OSF Preprints v2k3b, Center for Open Science.
- Notteboom, Theo, 2006. "Chapter 19 Concession Agreements as Port Governance Tools," Research in Transportation Economics, Elsevier, vol. 17(1), pages 437-455, January.
- Kokkaew, Nakhon & Oliveira Cruz, Carlos & Alexander, Derek, 2015. "The impact of rule of laws on the recovery of distressed PPP infrastructure Projects," MPRA Paper 77494, University Library of Munich, Germany.
- Adwoa Asantewaa & Tooraj Jamasb & Manuel Llorca, 2022.
"Electricity Sector Reform Performance in Sub-Saharan Africa: A Parametric Distance Function Approach,"
Energies, MDPI, vol. 15(6), pages 1-29, March.
- Asantewaa, Adwoa & Jamasb, Tooraj & Llorca, Manuel, 2020. "Electricity Sector Reform Performance in Sub-Saharan Africa: A Parametric Distance Function Approach," Working Papers 14-2020, Copenhagen Business School, Department of Economics.
- Adwoa Asantewaa, Adwoa & Jamasb, Tooraj & Llorca, Manuel, 2021. "Electricity Sector Reform Performance in Sub-Saharan Africa: A Parametric Distance Function Approach," Efficiency Series Papers 2021/02, University of Oviedo, Department of Economics, Oviedo Efficiency Group (OEG).
- Engel, Eduardo & Fischer, Ronald D. & Galetovic, Alexander, 2024. "The company you keep: Renegotiations and adverse selection in transportation infrastructure," Economics of Transportation, Elsevier, vol. 38(C).
More about this item
Keywords
Transport; Infrastructure; Cost performance; Construction;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:kap:transp:v:39:y:2012:i:1:p:197-214. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.