Delays and cost increases in the construction of private residential projects in Kuwait
Author
Abstract
Suggested Citation
DOI: 10.1080/0144619042000326710
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
- Mauro Bambi & Cristina Girolami & Salvatore Federico & Fausto Gozzi, 2017.
"Generically distributed investments on flexible projects and endogenous growth,"
Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 63(2), pages 521-558, February.
- Mauro Bambi & Cristina Di Girolami & Salvatore Federico & Fausto Gozzi, 2015. "Generically distributed investments on flexible projects and endogenous growth," Working Papers - Mathematical Economics 2015-04, Universita' degli Studi di Firenze, Dipartimento di Scienze per l'Economia e l'Impresa.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
- A .Q. Adeleke* & Abimbola Olukemi Windapo & Muhammad Waris Ali Khan & J.A. Bamgbade & Maruf Gbadebo Salimon & Gusman Nawanir, 2018. "Validating the Influence of Effective Communication, Team Competency and Skills, Active Leadership on Construction Risk Management Practices of Nigerian Construction Companies," The Journal of Social Sciences Research, Academic Research Publishing Group, pages 460-465:6.
- Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
- Mauro Bambi & Cristina Di Girolami & Salvatore Federico & Fausto Gozzi, 2014. "On the Consequences of Generically Distributed Investments on Flexible Projects in an Endogenous Growth Model," Discussion Papers 14/15, Department of Economics, University of York.
- Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
- Aftab Memon & Ismail Rahman, 2013. "Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method," Modern Applied Science, Canadian Center of Science and Education, vol. 7(8), pages 1-78, August.
- Mohammad Ajmal Nikjow & Li Liang & Xijing Qi & Samad M. E. Sepasgozar & Nicholas Chileshe, 2021. "Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects," Sustainability, MDPI, vol. 13(17), pages 1-21, August.
- Edwin Thomas Banobi & Wooyong Jung, 2019. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects," Sustainability, MDPI, vol. 11(21), pages 1-16, October.
- Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
- Ismail Abdul Rahman & Aftab Memon & Ahmad Tarmizi Abd. Karim, 2013. "Relationship between Factors of Construction Resources Affecting Project Cost," Modern Applied Science, Canadian Center of Science and Education, vol. 7(1), pages 1-67, January.
- Oke Ayodeji Emmanuel, 2016. "Effect of bond administration on construction project delivery," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1390-1396, December.
- Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.
- S M Renuka & S Kamal & C Umarani, 2017. "A Model To Estimate The Time Overrun Risk In Construction Projects," Theoretical and Empirical Researches in Urban Management, Research Centre in Public Administration and Public Services, Bucharest, Romania, vol. 12(2), pages 64-76, April.
More about this item
Keywords
Delay; cost increase; residential projects; Kuwait;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:23:y:2005:i:3:p:285-294. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.