Understanding transport project appraisal in its institutional dimension
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Rajaram, Anand & Le, Tuan Minh & Biletska, Nataliya & Brumby, Jim, 2010. "A diagnostic framework for assessing public investment management," Policy Research Working Paper Series 5397, The World Bank.
- Massimo Florio & Davide Sartori, 2010. "Getting Incentives Right: do we need ex post CBA?," Working Papers 201001, CSIL Centre for Industrial Studies.
- Bent Flyvbjerg, 2013. "Quality Control and Due Diligence in Project Management: Getting Decisions Right by Taking the Outside View," Papers 1302.2544, arXiv.org.
- Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.
- Chantal C Cantarelli & Bent Flyvbjerg & Bert van Wee & Eric J E Molin, 2010.
"Lock-in and its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects: Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns,"
Environment and Planning B, , vol. 37(5), pages 792-807, October.
- Chantal C. Cantarelli & Bent Flybjerg & Bert van Wee & Eric J. E. Molin, 2013. "Lock-in and Its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects. Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns," Papers 1307.2177, arXiv.org.
- Bent Flyvbjerg, 2007.
"Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures,"
Environment and Planning B, , vol. 34(4), pages 578-597, August.
- Flyvbjerg, Bent, 2005. "Policy and planning for large infrastructure projects : problems, causes, cures," Policy Research Working Paper Series 3781, The World Bank.
- Bent Flyvbjerg, 2013. "Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures," Papers 1303.7400, arXiv.org.
- Dreze, Jean & Stern, Nicholas, 1990. "Policy reform, shadow prices, and market prices," Journal of Public Economics, Elsevier, vol. 42(1), pages 1-45, June.
- Paolo Beria & Michele Giove & Maria Francesca Miele, 2012. "A Comparative Analysis Of Assessment Approaches. Six Cases From Europe," Articles, International Journal of Transport Economics, vol. 39(2).
- Peter Mackie & John Nellthorp & James Laird, 2005. "Notes on the Economic Evaluation of Transport Projects," World Bank Publications - Reports 11791, The World Bank Group.
- Peter Mackie & John Nellthorp & James Laird, 2005. "Notes on the Economic Evaluation of Transport Projects," World Bank Publications - Reports 11787, The World Bank Group.
- Peter Mackie & John Nellthorp & James Laird, 2005. "Notes on the Economic Evaluation of Transport Projects : Fiscal Impacts," World Bank Publications - Reports 11794, The World Bank Group.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kannapiran C. Arjunan, 2019. "Non‐monotonic NPV Function Leads to Spurious NPVs and Multiple IRR Problems: A New Method that Resolves these Problems," Economic Papers, The Economic Society of Australia, vol. 38(1), pages 56-69, March.
- Massimo Florio & Silvia Vignetti, 2013. "The use of ex post Cost-Benefit Analysis to assess the long-term effects of Major Infrastructure Projects," Working Papers 201302, CSIL Centre for Industrial Studies.
- Pierluigi Coppola & Diego Deponte & Alessandro Vacca & Federico Messa & Fulvio Silvestri, 2022. "Multi-Dimensional Cost-Effectiveness Analysis for Prioritizing Railway Station Investments: A General Framework with an Application to the Italian Case Study," Sustainability, MDPI, vol. 14(9), pages 1-18, April.
- Hugo Priemus & Bert van Wee (ed.), 2013. "International Handbook on Mega-Projects," Books, Edward Elgar Publishing, number 14791.
- Andronis, Lazaros & Maredza, Mandy & Petrou, Stavros, 2019. "Measuring, valuing and including forgone childhood education and leisure time costs in economic evaluation: Methods, challenges and the way forward," Social Science & Medicine, Elsevier, vol. 237(C), pages 1-1.
- Zi-Yun Zhang & Fang-Le Peng & Chen-Xiao Ma & Hui Zhang & Su-Juan Fu, 2021. "External Benefit Assessment of Urban Utility Tunnels Based on Sustainable Development," Sustainability, MDPI, vol. 13(2), pages 1-23, January.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
- Bent Flyvbjerg, 2014. "What You Should Know About Megaprojects, and Why: An Overview," Papers 1409.0003, arXiv.org.
- Glenn Lyons & Greg Marsden, 2021. "Opening out and closing down: the treatment of uncertainty in transport planning’s forecasting paradigm," Transportation, Springer, vol. 48(2), pages 595-616, April.
- Dotti, Nicola Francesco, 2018.
"Knowledge that matters for the ‘survival of unfittest’: The case of the new Brussels' rail junction,"
Transport Policy, Elsevier, vol. 63(C), pages 131-140.
- Nicola Francesco Dotti, 2018. "Knowledge that matters for the 'survival of unfittest’: The case of the new Brussels' rail junction," ULB Institutional Repository 2013/266990, ULB -- Universite Libre de Bruxelles.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
- Cantarelli, C.C. & van Wee, B. & Molin, E.J.E. & Flyvbjerg, B., 2012. "Different cost performance: different determinants?," Transport Policy, Elsevier, vol. 22(C), pages 88-95.
- Chantal C. Cantarelli & Bent Flyvbjerg, 2013. "Mega-projects’ cost performance and lock-in: problems and solutions," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 15, pages 333-355, Edward Elgar Publishing.
- Chi, Sae & Bunker, Jonathan, 2021. "An Australian perspective on real-life cost-benefit analysis and assessment frameworks for transport infrastructure investments," Research in Transportation Economics, Elsevier, vol. 88(C).
- Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
- Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
- Kim, Kangsoo & Baek, Seunghan & Cho, Hyejin, 2021. "Impact of a Preliminary Feasibility Study on the accuracy of traffic forecasts in the case of Korea," Transportation Research Part A: Policy and Practice, Elsevier, vol. 147(C), pages 197-211.
- Chantal C. Cantarelli & Bert van Wee & Eric J. E. Molin & Bent Flyvbjerg, 2013. "Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects," Papers 1307.2179, arXiv.org, revised Jan 2015.
- Mackinnon, John & Reinikka, Ritva, 2000. "Lessons from Uganda on strategies to fight poverty," Policy Research Working Paper Series 2440, The World Bank.
- Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012.
"Geographical variation in project cost performance: the Netherlands versus worldwide,"
Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
- Chantal C. Cantarelli & Bent Flyvbjerg & S{o}ren L. Buhl, 2013. "Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide," Papers 1307.2181, arXiv.org.
More about this item
Keywords
Cost-Benefit analysis; project appraisal; transport project; decision-making process;All these keywords.
JEL classification:
- D61 - Microeconomics - - Welfare Economics - - - Allocative Efficiency; Cost-Benefit Analysis
- H43 - Public Economics - - Publicly Provided Goods - - - Project Evaluation; Social Discount Rate
- O18 - Economic Development, Innovation, Technological Change, and Growth - - Economic Development - - - Urban, Rural, Regional, and Transportation Analysis; Housing; Infrastructure
- R42 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - Government and Private Investment Analysis; Road Maintenance; Transportation Planning
- G11 - Financial Economics - - General Financial Markets - - - Portfolio Choice; Investment Decisions
NEP fields
This paper has been announced in the following NEP Reports:- NEP-PPM-2020-08-17 (Project, Program and Portfolio Management)
- NEP-TRE-2020-08-17 (Transport Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mst:wpaper:201902. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Marinella Manghina (email available below). General contact details of provider: https://edirc.repec.org/data/csilmit.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.