The Use of Game Theory for Making Rational Decisions in Business Negotiations: A Conceptual Model
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Rufo, M.J. & MartÃn, J. & Pérez, C.J., 2014. "Adversarial life testing: A Bayesian negotiation model," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 118-125.
- Kelly,Anthony, 2003. "Decision Making Using Game Theory," Cambridge Books, Cambridge University Press, number 9780521814621, September.
- Mandow, L. & Perez de la Cruz, J. L., 2003. "Multicriteria heuristic search," European Journal of Operational Research, Elsevier, vol. 150(2), pages 253-280, October.
- Lova, Antonio & Maroto, Concepcion & Tormos, Pilar, 2000. "A multicriteria heuristic method to improve resource allocation in multiproject scheduling," European Journal of Operational Research, Elsevier, vol. 127(2), pages 408-424, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Gawlik, Remigiusz & Grzesik, Katarzyna & Kwiecińska, Monika, 2018. "Modelowanie AHP wyboru menadżera ds. integracji organizacyjnej w procesie fuzji przedsiębiorstw w kontekście teorii struktury rozwoju przywództwa [Choosing the merger’s organizational integration m," MPRA Paper 87798, University Library of Munich, Germany.
- Gawlik, Remigiusz, 2018. "Decision-making under environmental uncertainty," MPRA Paper 93361, University Library of Munich, Germany.
- Pupentsova Svetlana V. & Gromova Elizaveta A., 2021. "Risk Management in Business Valuation in the Context of Digital Transformation," Real Estate Management and Valuation, Sciendo, vol. 29(2), pages 97-106, June.
- Gajdzik, Bożena & Gawlik, Remigiusz, 2018. "Choosing the Production Function Model for an Optimal Measurement of the Restructuring Efficiency of the Polish Metallurgical Sector in Years 2000–2015," MPRA Paper 83618, University Library of Munich, Germany.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bredael, Dries & Vanhoucke, Mario, 2023. "Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates," European Journal of Operational Research, Elsevier, vol. 308(1), pages 54-75.
- Kose, Erkan & Erbas, Mehmet & Ersen, Erkan, 2017. "An integrated approach based on game theory and geographical information systems to solve decision problems," Applied Mathematics and Computation, Elsevier, vol. 308(C), pages 105-114.
- Beşikci, Umut & Bilge, Ümit & Ulusoy, Gündüz, 2015. "Multi-mode resource constrained multi-project scheduling and resource portfolio problem," European Journal of Operational Research, Elsevier, vol. 240(1), pages 22-31.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Gonçalves, J.F. & Mendes, J.J.M. & Resende, M.G.C., 2008. "A genetic algorithm for the resource constrained multi-project scheduling problem," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1171-1190, September.
- Ríos Insua, David & Ruggeri, Fabrizio & Soyer, Refik & Rasines, Daniel G., 2018. "Adversarial issues in reliability," European Journal of Operational Research, Elsevier, vol. 266(3), pages 1113-1119.
- Volker Bieta & Udo Broll & Hellmuth Milde & Wilfried Siebe, 2008. "The New Basel Accord And The Nature Of Risk: A Game Theoretic Perspective," Annals of Financial Economics (AFE), World Scientific Publishing Co. Pte. Ltd., vol. 4(01), pages 1-22.
- Yukang He & Tao Jia & Weibo Zheng, 2024. "Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns," Annals of Operations Research, Springer, vol. 338(1), pages 115-149, July.
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
- Krüger, Doreen & Scholl, Armin, 2009.
"A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times,"
European Journal of Operational Research, Elsevier, vol. 197(2), pages 492-508, September.
- Doreen Krüger & Armin Scholl, 2007. "A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 16/2007, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Gómez Sánchez, Mariam & Lalla-Ruiz, Eduardo & Fernández Gil, Alejandro & Castro, Carlos & Voß, Stefan, 2023. "Resource-constrained multi-project scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 309(3), pages 958-976.
- Antonio Pievatolo & Fabrizio Ruggeri & Refik Soyer & Simon Wilson, 2021. "Decisions in Risk and Reliability: An Explanatory Perspective," Stats, MDPI, vol. 4(2), pages 1-23, March.
- Bogumiła Krzeszowska, 2013. "Three step procedure for a multiple criteria problem of project portfolio scheduling," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 23(4), pages 55-74.
- Quanxi Wang & Ni Wang & Haodong Wang & Yuan Xiu, 2022. "Study on Influencing Factors and Simulation of Watershed Ecological Compensation Based on Evolutionary Game," Sustainability, MDPI, vol. 14(6), pages 1-23, March.
- Rahman Torba & Stéphane Dauzère-Pérès & Claude Yugma & Cédric Gallais & Juliette Pouzet, 2024. "Solving a real-life multi-skill resource-constrained multi-project scheduling problem," Annals of Operations Research, Springer, vol. 338(1), pages 69-114, July.
- Ben Issa, Samer & Patterson, Raymond A. & Tu, Yiliu, 2021. "Solving resource-constrained multi-project environment under different activity assumptions," International Journal of Production Economics, Elsevier, vol. 232(C).
- Witkowski Tadeusz & Antczak Paweł & Antczak Arkadiusz, 2009. "Project Realization Scheduling and its Multi Criteria Evaluation," Foundations of Management, Sciendo, vol. 1(2), pages 25-44, January.
- Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
- Insua, David Rios & Ruggeri, Fabrizio & Soyer, Refik & Wilson, Simon, 2020. "Advances in Bayesian decision making in reliability," European Journal of Operational Research, Elsevier, vol. 282(1), pages 1-18.
- He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
More about this item
Keywords
game theory; negotiation; rational; strategic decisions and negotiations support; heuristic negotiation model;All these keywords.
JEL classification:
- M16 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - International Business Administration
- M54 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Personnel Economics - - - Labor Management
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:krk:eberjl:v:3:y:2015:i:4:p:105-121. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Piotr Stanek, PhD. (email available below). General contact details of provider: https://edirc.repec.org/data/aekrapl.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.