IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v54y2016i20p6105-6120.html
   My bibliography  Save this article

Setting optimal production lot sizes and planned lead times in a job shop

Author

Listed:
  • Rong Yuan
  • Stephen C. Graves

Abstract

In this research, we model a job shop that produces a set of discrete parts in a make-to-stock setting. The intent of the research is to develop a planning model to determine the optimal tactical policies that minimise the relevant manufacturing costs subject to workload variability and capacity limits. We consider two tactical decisions, namely the production lot size for each part and the planned lead time for each work station. We model the relevant manufacturing costs, entailing production overtime costs and inventory-related costs, as functions of these tactical decisions. We formulate a non-linear optimisation model and implement it in the Excel spreadsheet. We test the model with actual factory data from our research sponsor. The results are consistent with our intuition and demonstrate the potential value from jointly optimising over these tactical policies.

Suggested Citation

  • Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
  • Handle: RePEc:taf:tprsxx:v:54:y:2016:i:20:p:6105-6120
    DOI: 10.1080/00207543.2015.1073859
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2015.1073859
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2015.1073859?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
    2. Chee-Chong Teo & Rohit Bhatnagar & Stephen Graves, 2011. "Setting planned lead times for a make-to-order production system with master schedule smoothing," IISE Transactions, Taylor & Francis Journals, vol. 43(6), pages 399-414.
    3. Carson E. Agnew, 1976. "Dynamic Modeling and Control of Congestion-Prone Systems," Operations Research, INFORMS, vol. 24(3), pages 400-419, June.
    4. John S. Hollywood, 2005. "An approximate planning model for distributed computing networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 590-605, September.
    5. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
    6. Stephen C. Graves & David B. Kletter & William B. Hetzel, 1998. "A Dynamic Model for Requirements Planning with Application to Supply Chain Optimization," Operations Research, INFORMS, vol. 46(3-supplem), pages 35-49, June.
    7. Stephen C. Graves, 1986. "A Tactical Planning Model for a Job Shop," Operations Research, INFORMS, vol. 34(4), pages 522-533, August.
    8. Linguo Gong & Ton de Kok & Jie Ding, 1994. "Optimal Leadtimes Planning in a Serial Production System," Management Science, INFORMS, vol. 40(5), pages 629-632, May.
    9. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
    10. Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
    11. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    12. Allan B. Cruickshanks & Robert D. Drescher & Stephen C. Graves, 1984. "A Study of Production Smoothing in a Job Shop Environment," Management Science, INFORMS, vol. 30(3), pages 368-380, March.
    13. Matsuura, Haruki & Tsubone, Hitoshi & Kanezashi, Masakazu, 1996. "Setting planned lead times for multi-operation jobs," European Journal of Operational Research, Elsevier, vol. 88(2), pages 287-303, January.
    14. Uday S. Karmarkar & Sham Kekre & Sunder Kekre & Susan Freeman, 1985. "Lot-Sizing and Lead-time Performance in a Manufacturing Cell," Interfaces, INFORMS, vol. 15(2), pages 1-9, April.
    15. Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    2. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    3. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    4. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    5. Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
    6. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
    7. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    8. Zahraei, Seyed Mehdi & Teo, Chee-Chong, 2018. "Optimizing a recover-and-assemble remanufacturing system with production smoothing," International Journal of Production Economics, Elsevier, vol. 197(C), pages 330-341.
    9. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
    10. Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
    11. Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
    12. Kefeli, Ali & Uzsoy, Reha & Fathi, Yahya & Kay, Michael, 2011. "Using a mathematical programming model to examine the marginal price of capacitated resources," International Journal of Production Economics, Elsevier, vol. 131(1), pages 383-391, May.
    13. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    14. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    15. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
    16. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    17. Izack Cohen & Boaz Golany & Avraham Shtub, 2005. "Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology," Annals of Operations Research, Springer, vol. 134(1), pages 183-199, February.
    18. repec:dgr:rugsom:02a42 is not listed on IDEAS
    19. Anantaram Balakrishnan & Joseph Geunes & Michael S. Pangburn, 2004. "Coordinating Supply Chains by Controlling Upstream Variability Propagation," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 163-183, July.
    20. Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
    21. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:54:y:2016:i:20:p:6105-6120. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.