Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates

Author

Listed:
  • Altendorfer, Klaus
  • Minner, Stefan

Abstract

We consider a two-stage make-to-order manufacturing system with random demands, processing times, and distributed customer due dates. The work to each stage is released based on a planned lead time. A general approach to minimize total inventory holding and customer order tardiness cost is presented to find the optimal manufacturing capacities and planned lead times for each manufacturing stage. Expressions are derived for work-in process inventories, finished-goods-inventory and expected backorders under the assumption of a series of M/M/1 queuing systems and exponentially distributed customer required lead times. We prove that the distribution of customer required lead time has no influence on the optimal planned lead times whenever capacity is predefined but it influences the optimal capacity to invest into. For the simultaneous optimization of capacity and planned lead times we present a numerical study that shows that only marginal cost decreases can be gained by setting a planned lead time for the upstream stage and that a considerable cost penalty is incurred if capacity and planned lead time optimization are performed sequentially.

Suggested Citation

  • Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
  • Handle: RePEc:eee:ejores:v:213:y:2011:i:1:p:134-146
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(11)00217-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Alexandar Angelus & Evan L. Porteus, 2002. "Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand," Management Science, INFORMS, vol. 48(3), pages 399-413, March.
    2. Wijngaard, J., 2004. "The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case," European Journal of Operational Research, Elsevier, vol. 159(1), pages 95-109, November.
    3. James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
    4. M. F. Driscoll & N. A. Weiss, 1976. "An Application of Queueing Theory to Reservation Newtorks," Management Science, INFORMS, vol. 22(5), pages 540-546, January.
    5. Alan Scheller-Wolf, 2003. "Necessary and Sufficient Conditions for Delay Moments in FIFO Multiserver Queues with an Application Comparing s Slow Servers with One Fast One," Operations Research, INFORMS, vol. 51(5), pages 748-758, October.
    6. Xiuli Chao & Carlton Scott, 2000. "Several Results on the Design of Queueing Systems," Operations Research, INFORMS, vol. 48(6), pages 965-970, December.
    7. J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
    8. Rema Hariharan & Paul Zipkin, 1995. "Customer-Order Information, Leadtimes, and Inventories," Management Science, INFORMS, vol. 41(10), pages 1599-1607, October.
    9. Shaler Stidham, 1970. "On the Optimality of Single-Server Queuing Systems," Operations Research, INFORMS, vol. 18(4), pages 708-732, August.
    10. Linguo Gong & Ton de Kok & Jie Ding, 1994. "Optimal Leadtimes Planning in a Serial Production System," Management Science, INFORMS, vol. 40(5), pages 629-632, May.
    11. Jodlbauer, Herbert & Altendorfer, Klaus, 2010. "Trade-off between capacity invested and inventory needed," European Journal of Operational Research, Elsevier, vol. 203(1), pages 118-133, May.
    12. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    13. Shelby L. Brumelle, 1971. "Some Inequalities for Parallel-Server Queues," Operations Research, INFORMS, vol. 19(2), pages 402-413, April.
    14. Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
    15. Frederick S. Hillier, 1963. "Economic Models for Industrial Waiting Line Problems," Management Science, INFORMS, vol. 10(1), pages 119-130, October.
    16. Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
    17. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    18. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    19. Mincsovics, Gergely & Tan, Tarkan & Alp, Osman, 2009. "Integrated capacity and inventory management with capacity acquisition lead times," European Journal of Operational Research, Elsevier, vol. 196(3), pages 949-958, August.
    20. Georges Brigham, 1955. "On a Congestion Problem in an Aircraft Factory," Operations Research, INFORMS, vol. 3(4), pages 412-428, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
    2. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    3. Öner-Közen, Miray & Minner, Stefan, 2017. "Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates," European Journal of Operational Research, Elsevier, vol. 263(2), pages 524-539.
    4. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
    5. Vahdani, Behnam & Mohammadi, M., 2015. "A bi-objective interval-stochastic robust optimization model for designing closed loop supply chain network with multi-priority queuing system," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 67-87.
    6. Klaus Altendorfer & Thomas Felberbauer & Herbert Jodlbauer, 2018. "Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand," Papers 1812.00773, arXiv.org.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
    2. Josh Reed & Bo Zhang, 2017. "Managing capacity and inventory jointly for multi-server make-to-stock queues," Queueing Systems: Theory and Applications, Springer, vol. 86(1), pages 61-94, June.
    3. Jodlbauer, Herbert & Altendorfer, Klaus, 2010. "Trade-off between capacity invested and inventory needed," European Journal of Operational Research, Elsevier, vol. 203(1), pages 118-133, May.
    4. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    5. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    6. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
    7. Mohammed Hichame Benbitour & Evren Sahin, 2015. "Evaluation of the Impact of Uncertain Advance Demand Information on Production/Inventory Systems," Post-Print hal-01199290, HAL.
    8. Tamer Boyacı & Özalp Özer, 2010. "Information Acquisition for Capacity Planning via Pricing and Advance Selling: When to Stop and Act?," Operations Research, INFORMS, vol. 58(5), pages 1328-1349, October.
    9. Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
    10. Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
    11. Smirnov, Dina & van Jaarsveld, Willem & Atan, Zümbül & de Kok, Ton, 2021. "Long-term resource planning in the high-tech industry: Capacity or inventory?," European Journal of Operational Research, Elsevier, vol. 293(3), pages 926-940.
    12. Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
    13. Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
    14. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
    15. Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
    16. Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
    17. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    18. Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
    19. Song, Dong-Ping, 2006. "Raw material release time control for complex make-to-order products with stochastic processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 371-385, September.
    20. Du, Bisheng & Larsen, Christian, 2017. "Reservation policies of advance orders in the presence of multiple demand classes," European Journal of Operational Research, Elsevier, vol. 256(2), pages 430-438.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:213:y:2011:i:1:p:134-146. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.