IDEAS home Printed from https://ideas.repec.org/a/inm/orinte/v37y2007i2p133-142.html
   My bibliography  Save this article

The Netherlands Schedules Track Maintenance to Improve Track Workers’ Safety

Author

Listed:
  • J. I. van Zante--de Fokkert

    (Centre for Quantitative Methods, PO Box 414, 5600 AK Eindhoven, The Netherlands)

  • D. den Hertog

    (Tilburg University, PO Box 90153, 5000 LE Tilburg, The Netherlands)

  • F. J. van den Berg

    (ProRail bedrijfsplanning, PO Box 2038, 3500 GA Utrecht, The Netherlands)

  • J. H. M. Verhoeven

    (ProRail bedrijfsplanning, PO Box 2038, 3500 GA Utrecht, The Netherlands)

Abstract

After several fatal accidents, improving the safety of rail-track workers became a political priority in The Netherlands. Maintaining the track was one of the most dangerous jobs in the country. ProRail divides its infrastructure into working zones to be taken out of service during maintenance. We developed a two-step method of constructing a four-week maintenance schedule in which each working zone of the main lines is closed to trains at night exactly once. The alterations in trains’ departure and arrival times are within the restrictions imposed by train operators. Workers have accepted the resulting schedule, which provides them with a manageable maximum workload per night. Such a schedule is unique in Europe. It has been in operation since 2000 and has clearly proven its benefits.

Suggested Citation

  • J. I. van Zante--de Fokkert & D. den Hertog & F. J. van den Berg & J. H. M. Verhoeven, 2007. "The Netherlands Schedules Track Maintenance to Improve Track Workers’ Safety," Interfaces, INFORMS, vol. 37(2), pages 133-142, April.
  • Handle: RePEc:inm:orinte:v:37:y:2007:i:2:p:133-142
    DOI: 10.1287/inte.1060.0246
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/inte.1060.0246
    Download Restriction: no

    File URL: https://libkey.io/10.1287/inte.1060.0246?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Jurjen S. Hooghiemstra & Leo G. Kroon & Michiel A. Odijk & Marc Salomon & Peter J. Zwaneveld, 1999. "Decision Support Systems Support the Search for Win-Win Solutions in Railway Network Design," Interfaces, INFORMS, vol. 29(2), pages 15-32, April.
    2. Odijk, Michiel A., 1999. "Sensitivity analysis of a railway station track layout with respect to a given timetable," European Journal of Operational Research, Elsevier, vol. 112(3), pages 517-530, February.
    3. Hensher, David A., 1997. "A practical approach to identifying the market potential for high speed rail: A case study in the Sydney-Canberra corridor," Transportation Research Part A: Policy and Practice, Elsevier, vol. 31(6), pages 431-446, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Budai-Balke, G. & Dekker, R. & Kaymak, U., 2009. "Genetic and memetic algorithms for scheduling railway maintenance activities," Econometric Institute Research Papers EI 2009-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    3. Tomas Lidén, 2020. "Coordinating maintenance windows and train traffic: a case study," Public Transport, Springer, vol. 12(2), pages 261-298, June.
    4. Peng, Fan & Ouyang, Yanfeng, 2012. "Track maintenance production team scheduling in railroad networks," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1474-1488.
    5. Vansteenwegen, Pieter & Dewilde, Thijs & Burggraeve, Sofie & Cattrysse, Dirk, 2016. "An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems," European Journal of Operational Research, Elsevier, vol. 252(1), pages 39-53.
    6. Baldi, Mauro M. & Heinicke, Franziska & Simroth, Axel & Tadei, Roberto, 2016. "New heuristics for the Stochastic Tactical Railway Maintenance Problem," Omega, Elsevier, vol. 63(C), pages 94-102.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Eliasson, Jonas & Börjesson, Maria, 2014. "On timetable assumptions in railway investment appraisal," Transport Policy, Elsevier, vol. 36(C), pages 118-126.
    2. Hensher, David A., 2007. "Bus transport: Economics, policy and planning," Research in Transportation Economics, Elsevier, vol. 18(1), pages 1-507, January.
    3. David Hensher, 2001. "The valuation of commuter travel time savings for car drivers: evaluating alternative model specifications," Transportation, Springer, vol. 28(2), pages 101-118, May.
    4. Kroon, L.G. & Huisman, D. & Abbink, E.J.W. & Fioole, P-J. & Fischetti, M. & Maróti, G. & Schrijver, A. & Steenbeek, A. & Ybema, R., 2008. "The new Dutch timetable: The OR revolution," Econometric Institute Research Papers EI 2008-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    5. Yang, Chih-Wen & Sung, Yen-Ching, 2010. "Constructing a mixed-logit model with market positioning to analyze the effects of new mode introduction," Journal of Transport Geography, Elsevier, vol. 18(1), pages 175-182.
    6. Haque, Khademul & Mishra, Sabyasachee & Golias, Mihalis M., 2021. "Multi-period transportation network investment decision making and policy implications using econometric framework," Research in Transportation Economics, Elsevier, vol. 89(C).
    7. Leo Kroon & Dennis Huisman & Erwin Abbink & Pieter-Jan Fioole & Matteo Fischetti & Gábor Maróti & Alexander Schrijver & Adri Steenbeek & Roelof Ybema, 2009. "The New Dutch Timetable: The OR Revolution," Interfaces, INFORMS, vol. 39(1), pages 6-17, February.
    8. Asep Yayat Nurhidayat & Hera Widyastuti & Sutikno & Dwi Phalita Upahita, 2023. "Research on Passengers’ Preferences and Impact of High-Speed Rail on Air Transport Demand," Sustainability, MDPI, vol. 15(4), pages 1-26, February.
    9. Dobruszkes, Frédéric & Dehon, Catherine & Givoni, Moshe, 2014. "Does European high-speed rail affect the current level of air services? An EU-wide analysis," Transportation Research Part A: Policy and Practice, Elsevier, vol. 69(C), pages 461-475.
    10. Fragkos, Ioannis & Cordeau, Jean-François & Jans, Raf, 2021. "Decomposition methods for large-scale network expansion problems," Transportation Research Part B: Methodological, Elsevier, vol. 144(C), pages 60-80.
    11. Leo G. Kroon & Leon W. P. Peeters, 2003. "A Variable Trip Time Model for Cyclic Railway Timetabling," Transportation Science, INFORMS, vol. 37(2), pages 198-212, May.
    12. Feng, Xuesong, 2011. "Optimization of target speeds of high-speed railway trains for traction energy saving and transport efficiency improvement," Energy Policy, Elsevier, vol. 39(12), pages 7658-7665.
    13. Mesa-Arango, Rodrigo & Ukkusuri, Satish V., 2014. "Attributes driving the selection of trucking services and the quantification of the shipper’s willingness to pay," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 71(C), pages 142-158.
    14. Linna Li & Becky P.Y. Loo, 2017. "Railway Development And Air Patronage In China, 1993–2012: Implications For Low‐Carbon Transport," Journal of Regional Science, Wiley Blackwell, vol. 57(3), pages 507-522, June.
    15. Ait Ali, Abderrahman & Warg, Jennifer & Eliasson, Jonas, 2020. "Pricing commercial train path requests based on societal costs," Transportation Research Part A: Policy and Practice, Elsevier, vol. 132(C), pages 452-464.
    16. Kroon, Leo & Maróti, Gábor & Helmrich, Mathijn Retel & Vromans, Michiel & Dekker, Rommert, 2008. "Stochastic improvement of cyclic railway timetables," Transportation Research Part B: Methodological, Elsevier, vol. 42(6), pages 553-570, July.
    17. Kroon, L.G. & Peeters, L.W.P. & Wagenaar, J.C. & Zuidwijk, R.A., 2012. "Flexible Connections in PESP Models for Cyclic Passenger Railway Timetabling," ERIM Report Series Research in Management ERS-2012-008-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    18. Cordone, Roberto & Redaelli, Francesco, 2011. "Optimizing the demand captured by a railway system with a regular timetable," Transportation Research Part B: Methodological, Elsevier, vol. 45(2), pages 430-446, February.
    19. Kroon, L.G. & Huisman, D. & Maróti, G., 2007. "Railway timetabling from an operations research," Econometric Institute Research Papers EI 2007-22, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    20. Haibo Zhou & Hanhui Hu, 2017. "Sustainability Evaluation of Railways in China Using a Two-Stage Network DEA Model with Undesirable Outputs and Shared Resources," Sustainability, MDPI, vol. 9(1), pages 1-23, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:37:y:2007:i:2:p:133-142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.