IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v10y2018i8p2791-d162348.html
   My bibliography  Save this article

Enhanced Cooperation among Stakeholders in PPP Mega-Infrastructure Projects: A China Study

Author

Listed:
  • Long Li

    (Department of Construction Management, Dalian University of Technology, Dalian 116024, China)

  • Zhongfu Li

    (Department of Construction Management, Dalian University of Technology, Dalian 116024, China)

  • Lei Jiang

    (School of Civil Engineering, Dalian Minzu University, Dalian 116650, China)

  • Guangdong Wu

    (Department of Construction Management, Jiangxi University of Finance & Economics, Nanchang 330013, China)

  • Daojin Cheng

    (Faculty of Management and Economics, Dalian University of Technology, Dalian 116024, China)

Abstract

Despite the consensus that enhanced cooperation among stakeholders is critical to the successful delivery of public-private partnership (PPP) mega-infrastructure projects, there has been a limited utilization of the quantitative approach to explore the cooperation mechanism. Drawing on research and the actual practice of PPP projects in China, a quantitative mathematical model using evolutionary game theory is constructed to explore the internal cooperation mechanism. Numerical simulation is implemented to investigate the impact of the punitive mechanism and allocation mechanism on the enhanced cooperation. The simulation result indicates that reasonable benefit allocation and a strong punitive mechanism are crucial to enhanced cooperation. Action research supported by a case study in Dalian was conducted to verify the scientific practicalities of the simulation method. An enhanced cooperation framework was proposed. The role conversion of the government and the private sectors makes the enhanced cooperation feasible. This evolution model and cooperation framework can facilitate enhanced cooperation in PPP mega-infrastructure projects.

Suggested Citation

  • Long Li & Zhongfu Li & Lei Jiang & Guangdong Wu & Daojin Cheng, 2018. "Enhanced Cooperation among Stakeholders in PPP Mega-Infrastructure Projects: A China Study," Sustainability, MDPI, vol. 10(8), pages 1-16, August.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:8:p:2791-:d:162348
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/8/2791/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/8/2791/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Athias, Laure & Saussier, Stéphane, 2018. "Are public private partnerships that rigid? And why? Evidence from price provisions in French toll road concession contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 111(C), pages 174-186.
    2. Yongcheng Fu & Yongqiang Chen & Shuibo Zhang & Wenqian Wang, 2015. "Promoting cooperation in construction projects: an integrated approach of contractual incentive and trust," Construction Management and Economics, Taylor & Francis Journals, vol. 33(8), pages 653-670, August.
    3. Jing Du & Hongyue Wu & Xianbo Zhao, 2018. "Critical Factors on the Capital Structure of Public–Private Partnership Projects: A Sustainability Perspective," Sustainability, MDPI, vol. 10(6), pages 1-27, June.
    4. Jingfeng Yuan & Alex Yajun Zeng & Miroslaw Skibniewski & Qiming Li, 2009. "Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money," Construction Management and Economics, Taylor & Francis Journals, vol. 27(3), pages 253-270.
    5. Willem Salet & Luca Bertolini & Mendel Giezen, 2013. "Complexity and Uncertainty: Problem or Asset in Decision Making of Mega Infrastructure Projects?," International Journal of Urban and Regional Research, Wiley Blackwell, vol. 37(6), pages 1984-2000, November.
    6. Flyvbjerg,Bent & Bruzelius,Nils & Rothengatter,Werner, 2003. "Megaprojects and Risk," Cambridge Books, Cambridge University Press, number 9780521009461, January.
    7. Ren, Yizhi & Chen, Xiangyu & Wang, Zhen & Shi, Benyun & Cui, Guanghai & Wu, Ting & Choo, Kim-Kwang Raymond, 2018. "Neighbor-considered migration facilitates cooperation in prisoner’s dilemma games," Applied Mathematics and Computation, Elsevier, vol. 323(C), pages 95-105.
    8. Arshad Ali Javed & Patrick T.I. Lam & Albert P.C. Chan, 2014. "Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory," Construction Management and Economics, Taylor & Francis Journals, vol. 32(4), pages 323-348, April.
    9. Zhao, Jing & Wu, Yong & Zhu, Neng, 2009. "Implementing effect of energy efficiency supervision system for government office buildings and large-scale public buildings in China," Energy Policy, Elsevier, vol. 37(6), pages 2079-2086, June.
    10. Nunzia Carbonara & Nicola Costantino & Roberta Pellegrino, 2014. "Revenue guarantee in public-private partnerships: a fair risk allocation model," Construction Management and Economics, Taylor & Francis Journals, vol. 32(4), pages 403-415, April.
    11. Ates, Seyithan Ahmet & Durakbasa, Numan M., 2012. "Evaluation of corporate energy management practices of energy intensive industries in Turkey," Energy, Elsevier, vol. 45(1), pages 81-91.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guangbin Wang & Yingxia Xue & Mirosław Jan Skibniewski & Jiule Song & Hao Lu, 2018. "Analysis of Private Investors Conduct Strategies by Governments Supervising Public-Private Partnership Projects in the New Media Era," Sustainability, MDPI, vol. 10(12), pages 1-26, December.
    2. Xiaoyan Jiang & Kun Lu & Bo Xia & Yong Liu & Caiyun Cui, 2019. "Identifying Significant Risks and Analyzing Risk Relationship for Construction PPP Projects in China Using Integrated FISM-MICMAC Approach," Sustainability, MDPI, vol. 11(19), pages 1-31, September.
    3. Ominde, Diana & Ochieng, Edward Godfrey & Omwenga, Vincent Oteke, 2021. "Optimising ICT infrastructure performance in developing countries: Kenyan viewpoint," Technological Forecasting and Social Change, Elsevier, vol. 169(C).
    4. Jiabao Jing & Xiaomei Deng & Rashid Maqbool & Yahya Rashid & Saleha Ashfaq, 2020. "Default Behaviors of Contractors under Surety Bond in Construction Industry Based on Evolutionary Game Model," Sustainability, MDPI, vol. 12(21), pages 1-28, November.
    5. Lei Gao & Zhen-Yu Zhao, 2020. "The Evolutionary Game of Stakeholders’ Coordination Mechanism of New Energy Power Construction PPP Project: A China Case," Sustainability, MDPI, vol. 12(3), pages 1-24, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Akbari Ahmadabadi, Ali & Heravi, Gholamreza, 2019. "Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success," Transportation Research Part A: Policy and Practice, Elsevier, vol. 124(C), pages 169-188.
    2. Guangdong Wu, 2017. "A Multi-Objective Trade-Off Model in Sustainable Construction Projects," Sustainability, MDPI, vol. 9(11), pages 1-18, October.
    3. Federico Savini, 2017. "Planning, uncertainty and risk: The neoliberal logics of Amsterdam urbanism," Environment and Planning A, , vol. 49(4), pages 857-875, April.
    4. Bao, Fengyu & Martek, Igor & Chan, Albert P.C. & Chen, Chuan & Yang, Yang & Yu, Heng, 2023. "Assessing the public-private partnership handover: Experience from China's water sector," Utilities Policy, Elsevier, vol. 80(C).
    5. Martijn van den Hurk, 2016. "Bundling the procurement of sports infrastructure projects: How neither public nor private actors really benefit," Environment and Planning C, , vol. 34(8), pages 1369-1386, December.
    6. Alireza Sharafi & Ata Allah Taleizadeh & Mohsen Sadegh Amalnick, 2018. "Fair Allocation in Financial Disputes Between Public–Private Partnership Stakeholders Using Game Theory," Service Science, INFORMS, vol. 10(1), pages 1-11, March.
    7. Bernadine J. Dykes & Charles E. Stevens & Nandini Lahiri, 2020. "Foreignness in public–private partnerships: The case of project finance investments," Journal of International Business Policy, Palgrave Macmillan, vol. 3(2), pages 183-197, June.
    8. Guangdong Wu & Jian Zuo & Xianbo Zhao, 2017. "Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects," Sustainability, MDPI, vol. 9(7), pages 1-20, July.
    9. Detlef Müller-Mahn & Kennedy Mkutu & Eric Kioko, 2021. "Megaprojects—mega failures? The politics of aspiration and the transformation of rural Kenya," The European Journal of Development Research, Palgrave Macmillan;European Association of Development Research and Training Institutes (EADI), vol. 33(4), pages 1069-1090, August.
    10. Yanhong Liang & Hongdi Wang, 2019. "Sustainable Performance Measurements for Public–Private Partnership Projects: Empirical Evidence from China," Sustainability, MDPI, vol. 11(13), pages 1-15, July.
    11. Ceric Anita & Ivic Ivona, 2021. "Network analysis of interconnections between theoretical concepts associated with principal–agent theory concerning construction projects," Organization, Technology and Management in Construction, Sciendo, vol. 13(2), pages 2450-2464, January.
    12. Schreiner, Lena & Madlener, Reinhard, 2022. "Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany," Energy Economics, Elsevier, vol. 107(C).
    13. Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
    14. Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012. "Geographical variation in project cost performance: the Netherlands versus worldwide," Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
    15. Zhao, Na, 2019. "Managing interactive collaborative mega project supply chains under infectious risks," International Journal of Production Economics, Elsevier, vol. 218(C), pages 275-286.
    16. Michael Regan, 2013. "Public project procurement and the case for public–private partnerships," Chapters, in: John Farrar & David G. Mayes (ed.), Globalisation, the Global Financial Crisis and the State, chapter 8, pages 172-196, Edward Elgar Publishing.
    17. Holz-Rau, Christian & Scheiner, Joachim, 2011. "Safety and travel time in cost-benefit analysis: A sensitivity analysis for North Rhine-Westphalia," Transport Policy, Elsevier, vol. 18(2), pages 336-346, March.
    18. Leheis, Stéphanie, 2012. "High-speed train planning in France: Lessons from the Mediterranean TGV-line," Transport Policy, Elsevier, vol. 21(C), pages 37-44.
    19. Morgenroth, Edgar & FitzGerald, John & FitzGerald, John, 2006. "Summary and Conclusions," Book Chapters, in: Morgenroth, Edgar (ed.),Ex-Ante Evaluation of the Investment Priorities for the National Development Plan 2007-2013, chapter 24, pages 317-333, Economic and Social Research Institute (ESRI).
      • Baker, Terence J. & FitzGerald, John & Honohan, Patrick & FitzGerald, John & Honohan, Patrick, 1996. "Summary and Conclusions," Book Chapters, in: Baker, Terence J. (ed.),Economic Implications for Ireland of EMU, chapter 12, pages 339-352, Economic and Social Research Institute (ESRI).
    20. Litsiou, Konstantia & Polychronakis, Yiannis & Karami, Azhdar & Nikolopoulos, Konstantinos, 2022. "Relative performance of judgmental methods for forecasting the success of megaprojects," International Journal of Forecasting, Elsevier, vol. 38(3), pages 1185-1196.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:8:p:2791-:d:162348. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.